Text

Questions asked and responses given during administration of Salem Class 11-01 J:\\RC Written Exam 12/3/12 0810 0817 0818 0850 0858 0925 0936 1015 1045 1144 1145 1155 1245 1330 Exam starts Ii Q6 My answer is sloppy on answer sheet. Should I line it out?

Told him yes.

(\\{H Q6 Unit 1 is in stem. All choices are Unit 2. Shouls stem say Unit2? Told him yes, and put info on whiteboard.

Annoted Master Copy ofExam.

Rv Z Q27 Is the rad monitor requirement for either channel to shift to adverse? Told him to re-read the question.

7.2-Q20 Choice D nomenclature is wrong. 22SJ49 is not a x-conn valve. Should be RHR Discharge to Cold Legs. Agreed.

Put change in nomenclature on whiteboard. Annoted Master Copy ofbxam.

14 Q34 Does the leak location mean all air is lost to the RH18?

Told him to re-read the question.

Z Q29 Said he didn't understand choice a because he thought it should say something else. Told him to re-read the question.

-:IZ Q45 Asked if Choice C mattered whether it was in low speed or high speed. Told him to re-read the question.

(?.D2 Q45 With 2B SEC failing to actuate, wi112B vital bus be energized by operators? Told him that logical progression of operator actions based on conditions in the stem should be assumed to take place.

'1.4 SR018does last word ofquestion "in" really mean "lAW? Told him yes. (Note: Because operators are "in" FRCE at the time, which says to operate CS pumps as directed by LOCA-5.)

'72-Q27 Said he wasn't sure what minimum meant. Told him minimum meant minimum.

Rot Q35 Is there operator action? Told him that logical progression of operator actions based on conditions in the stem should be assumed to take place.

+t SRO 18does last word of question "in" really mean "lAW? Told him yes. (Note: Because operators are "in" FReE at the time, which says to operate CS pumps as directed by LOCA-S.)

12->

SR08 Said there was no RCS temperature in stem and he needed it to determine if sub cooling was present. Told him conditions in the: stem were sufficient to answer the question.

Salem 08-01 NRC Written Exam Seating Chart 5-17-10 I

I Proctor I

i I

I I

I I

~4---4 K6 z:.

KO~

~

-~--

i I

i

+-5'--->>

1 I

1 I

I

~4---4 Ltr

[J ~Ol i

i

+-5'--->>

1 1

~4--->>

(\\6S

'1 3 i

i

+-5'---4 I

1 1

I

- --~--.----~~

~4--->>

-, 2-Ro )J

TQ-AA-21 0-51 08 Revision 2 Page 1 of 2 Post Examination Test Item Analysis Lesson Plan I Course:

$'ale (Y\\

It,, 0 I -r. LOI Examination No.1

Title:

NRc Check the results of the examination.

D Small class (::::;6) and some questions were missed by three (3) or more trainees. Analysis required for these questions.

[~/Large class (>6) and some questions wme missed by more than 30% of the class. Analysis required for these questions.

Analysis of questions requested by individual.

None of the above apply and no further analysis is necessary.

If an analysis is to be performed, list the question number(s) on the worksheet and review each using the following guidelines. Record the results on the worksheet.

1. Review each question to ensure it is worded clearly and is not ambiguous. Ensure that it is properly constructed. Refer to TQ-M-21 0-2302, "Test Item Design and Approval Job Aid".
2. Review each question to ensure that it ties properly to the learning objectives' condition, performance, and standard.
3. Review each question to ensure that it is technically accurate.
4. Review each question to ensure that adequate material was presented to allow for achievement of the associated learning objective.

Determine if action is required for problem questions (e.g. delete from examination bank; revise question, revise lesson plan, etc.). When action is required, ensure a request is initiated, per the Training Management System, for documentation and tracking purposes.

Completed By: M

~

A c1Lt&Vv, I Date: Id-/ J..j / Id-.

I Request Tracking Number(s):

gO\\6J~'17- 046D Answer Key Change /

Examination Re-grade N/A Authorized by:

Group Lead Comments: 0f,c-1cA IQ () 1-/'30 In.dvAN' I'1J'trL('-floh).J.v /J.::;T r'Me Nt't<) 1-()JJ"t) ";. {

1'1 Vlfl vN, flV Q31, !2tJtpSI,~.J rl<o Ql(f tJt<.(.~ 6",-",.,.."."

11- 0 J

I TQ-AA-21 0-51 08 Revision 2 Page 2 of 2 Change Needed?

(y. N)

N f\\J f\\J rJ N

tJ Y

N Y

N N

r~

f\\J f\\J N

r~

'{

N.

N N

rzo7 R.OC\\

RO \\ s:-

Ro '1 <t3 Ro;W lZo J-<1 R031 Ro3Lf K05\\

K65",

R058 R.OSC1 KOL:.O FZo (ct-f fZOloS

~O(Pl "5 (ZO d

<;;R6 \\ 0

  • SKu)Y SRO\\i QUESTION ANALYSIS \\VORKSHEET Construction Objective Technically LP Content Question Number OK?

Based?

Accurate?

Acceptable?

(y. N)

(y. N)

(Y - N)

(Y - N) y

'j

'I

'I Y

Y

'I j

y y

'I Y

'I

'I

'I

'j

'f

'I

'f

'f

'f

'f

,,/

\\I

'J N

\\j y

'I

'I

'f

'I

'/

N Y

Y Y

y

'-I

'/

Y

'j "I

'I

\\j Y

'f I Y Y

Y Y

y

'I Y

Y

'I

'-I

"-I

"/

\\)

'I

'(

N "

'f 0

'I

\\;

'/

'j "I

'j

'f

'-j

'I

'I

'f

'I I

/

I

In t'W rr t Reactor Operator Answer Key 1. d 2EL

2. d T'I.
3. b
28.
4. e 2B.
5. e
30.
6. a 311.
7. d
32.
8. b
33.
9. b
34.
10. e
35.

11. e

36.
12. a 3-'I.
13. d
38.
14. e
39.
15. e
40.
16. a 41.
17. b
42.
18. a
43.
19. b
44.
20. d
45.

21. e

46.
22. d 4-'I.
23. b
48.
24. d 4~1.
25. b
50.

Page 1 d

a b

e e

a d

d a

e a

a d

a b

a d

b a

e b

d e

d b

Reactor Operator Answer Key

51. b
52. c
53. c
54. d
55. b
56. a
57. a
58. d
59. c
60. b
61. c
62. c
63. a
64. d
65. c
66. c
67. c
68. b
69. c
70. a
71. a
72. b
73. b
74. d
75. d Page 2

Senior Reactor Operator Answer Key

1. b
2. c
3. b
4. d
5. d
6. c
7. c
8. d
9. b
10. b 11. a
12. a
13. d
14. b
15. d
16. c
17. a
18. c
19. a
20. d 21. d
22. c
23. b
24. c
25. a Page 1