A determination has been made by the NRC staff that the amendment request reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame for the associated action, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.  
A determination has been made by the NRC staff that the amendment request reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame for the associated action, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.  


If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.  
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
: Thanks,  
: Thanks,  



Revision as of 01:09, 28 April 2019

Acceptance Review for Brown Ferry Unit 3 Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits
ML15055A092
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/20/2015
From: Saba F E
Division of Operating Reactor Licensing
To: Williams G R
Tennessee Valley Authority
References
TAC MF5659
Download: ML15055A092 (2)


Text

1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Friday, February 20, 2015 5:02 PM To: Williams, Gordon Robert (grwilliams 1@tva.gov); Schrull, Edward Dustin (edschrull@tva.gov)

Subject:

Acceptance Review for Brown Ferry Unit 3 App lication to Modify Technical Specification 3.4.9, "RCS Pressure and Temper ature (P/T) limits" (TAC MF5659)

Importance:

High Gordon, In accordance with LIC-109, Acceptance Review Procedures, Revision 1, the Nuclear Regulatory Commission (NRC) has completed the acceptance review of the Browns Ferry Unit 3 License Amendment Request regarding proposed modification to Technical Specification 3.4.9, "RCS Pressure and Temperature (P/T) limits". Specifically, the change replaces the current sets of TS Figures 3.4.9-1 and 3.4.9-2.

A determination has been made by the NRC staff that the amendment request reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame for the associated action, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Thanks,

Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV

Hearing Identifier: NRR_PMDA Email Number: 1890 Mail Envelope Properties (Farideh.Saba@nrc.gov20150220170200)

Subject:

Acceptance Review for Brown Ferry Unit 3 Application to Modify Technical Specification 3.4.9, "RCS Pressure and Temperature (P/T) limits" (TAC MF5659) Sent Date: 2/20/2015 5:02:26 PM Received Date: 2/20/2015 5:02:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1213 2/20/2015 5:02:00 PM

Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: