Line 2: |
Line 2: |
| | number = ML061290262 | | | number = ML061290262 |
| | issue date = 05/01/2006 | | | issue date = 05/01/2006 |
| | title = Surry, Units 1 & 2, 2005 Annual Regulatory Commitment Evaluation Report | | | title = 2005 Annual Regulatory Commitment Evaluation Report |
| | author name = Jernigan D E | | | author name = Jernigan D E |
| | author affiliation = Virginia Electric & Power Co (VEPCO) | | | author affiliation = Virginia Electric & Power Co (VEPCO) |
Revision as of 21:31, 10 February 2019
Similar Documents at Surry |
---|
Category:Annual Report
MONTHYEARML18065A1962018-02-28028 February 2018 Submission of Annual Financial Report and Nuclear Liability Insurance Endorsements ML15188A3462015-06-30030 June 2015 2014 Annual Report of Emergency Core Cooling Syetem (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML15097A2582015-03-27027 March 2015 Annual Changes, Tests and Experiments Report Regulatory Commitment Evaluation Report ML14126A5112014-04-26026 April 2014 2013 Annual Radioactive Effluent Release Report ML14094A0542014-03-28028 March 2014 Submission of Annual Financial Report and Nuclear Liability Insurance Endorsements for Kewaunee Power Station, Millstone Power Station, North Anna Power Station and Surry Power Station ML1109807542011-03-30030 March 2011 and ISFSI, Millstone, Units 1, 2 & 3 and ISFSI, North Anna, Units 1 & 2 and ISFSI, Surry, Units 1 & 2 and ISFSI, Submission of Annual Financial Report and Nuclear Liability Insurance Endorsements ML0909606412009-03-26026 March 2009 ISFSI, North Anna, Units 1 & 2 and ISFSI, and Surry, Units 1 & 2 and ISFSI - Proof of Financial Protection, Guarantee of Payment of Deferred Premiums and Submission of Annual Financial Report ML0718401742007-06-28028 June 2007 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0709900552007-03-30030 March 2007 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML0618100432006-06-28028 June 2006 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0612902622006-05-0101 May 2006 Annual Regulatory Commitment Evaluation Report ML0612503282006-05-0101 May 2006 Annual Radioactive Effluent Release Report ML0510504832005-04-0101 April 2005 ISFSI North Anna Power Station Units 1 and 2 and ISFSI Annual Reporting of Financial Information ML0312503402003-04-22022 April 2003 Annual Radioactive Effluent Release Report 2018-02-28
[Table view] Category:Letter
MONTHYEARML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24003A9022024-01-0303 January 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 1, 2006 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.SPS Lic/CGL Docket Nos.06-373 RO 50-280 50-281 DPR-32 DPR-37 License Nos.Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 ANNUAL REGULATORY COMMITMENT EVALUATION REPORT Consistent with the reporting guidance in NEI 95-07, Revision 2, Guideline for Managing NRC Commitments, attached is the regulatory commitment evaluation summary for Surry Power Station for the year 2005.Should you have any questions regarding this report, please do not hesitate to contact Barry G rber at (757) 365-2725.V tr ly yours, Donald nigan, Site Vice President Surry Power Station Attachment Commitments made in this letter: None.14-,001 cc: United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Attachment to Serial No. 06-1 99A Regulatory Commitment Evaluation Summary for the Year 2005 Surry Power Station Regulatory Commitment Evaluation
-approved 6/9/2005: In response to NRC IE Bulletin 82-02, titled Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary (RCPB) of PWR Plants, procedures relating to the RCPB were revised to incorporate NDT inspection of bolting material when opened for inspection or maintenance.
The inspections directed by Bulletin 82-02 are no longer required based on the current practice of not using the injection sealants and lubricants cited in the bulletin, the Boric Acid Corrosion Control Program, Reactor Coolant System pressure testing, and ASME Code required examinations applicable for bolting. The intent of the original commitment to identify RCPB bolting degradation due to either boric acid corrosion wastage or stress corrosion cracking related to the use of certain injection sealants or lubricants will continue to be satisfied.
Thus, elimination of the Bulletin 82-02 inspections is acceptable.