ML073180313: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML073180313
| number = ML073180313
| issue date = 11/08/2007
| issue date = 11/08/2007
| title = Catawba, Units 1 and 2, Tech Spec Pages for Amendments 238 and 234 Regarding Emergency Core Cooling System Strainer Modification
| title = Tech Spec Pages for Amendments 238 and 234 Regarding Emergency Core Cooling System Strainer Modification
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
Line 15: Line 15:
| page count = 3
| page count = 3
| project = TAC:MD5163, TAC:MD5164
| project = TAC:MD5163, TAC:MD5164
| stage = RAI
| stage = Other
}}
}}



Revision as of 06:14, 10 February 2019

Tech Spec Pages for Amendments 238 and 234 Regarding Emergency Core Cooling System Strainer Modification
ML073180313
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/08/2007
From:
NRC/NRR/ADRO/DORL/LPLII-1
To:
Stang J F, NRR/DORL, 415-1345
Shared Package
ML073020581 List:
References
TAC MD5163, TAC MD5164
Download: ML073180313 (3)


Text

(2) TvcbalS ievricntlon

  • ne Tecuilcal Sofcfatons Contraied in Appendix A, as revised bogh AnendMetNo 238 which 8m attched hereto, are hereby oipomted iNto te rkewd operatng cerns. Duke Power Company LLC sha opeate theIn acemdance with the Tachical Specilications.

(3) LWdte F-Ima Iae AmalyIsvW 9 Rmnei The Updated Fialr Safety Anauls* Report mupplemntr submitted postia to 10CFR 4.21(d) as mlv d on Decemer 16, 200= deabes c=eb future activities to be completed before the pedod of extended opeato Duke shaD coplete #Ieme ectIvIles no later ihan December 6, 2024. and am noty fte NRC In witing when ao of these ecNttes IIscompmete and mrm be milied by NRC kiq* The Updated Fnal Saiety Analysi Report supplement as revised an December 16, 20M2, descrbed above, doa be icuded h the ned adeduled update ho the Updated Finl Safety Analyfs Report rquked by 10 CFR Wo71(eX4)N followng issuance ofthis renewed operating license. utlhat update Is cmplte. Duke my'make carges to teo programs deamted in such supplement without prkor Conmislon approval.

pronded OWt Duke evAtates each such change pmuunt to Owe attef set forth In 10 CFR R.9. aWcoanAes vdth the requirements in that secton..(4)Duke Powe C~ompany LLC shall =Mop with Dhe antilnat conditios delmeneted in Appendx C to tIhs renewed operati icense.(5) (Scir P9AI..1,SER, SSER#2,SSER#3 8SER94, Duke Pomwr Comany LLC shal hnplernent and maintahIn hieffect d provison f the approved fire pxotectton Program as described in tlh Updated Rme Safety Analyisb Report, as amendd, ortieftfadliyad as approved In DiSER V=ouh Sup1eniri 1%, subject b 0 tiefolwin pwvlorom The. , Inhee may make aded ges to the approved Ire profedIn program withou Prior approval Of glu Commissionnly f ttve d ngesvOM* fat adversely effec the alit to achieve and maintaln safe shuAdM= In Ie*event of a fire.-The pamrenttical notatin fOllowingthe fttl of fti renewed operat"n license condkx denotes the secton of the Safety Evaluation Report and/mo Is supperment wherein flhe venewmd lonse condition Is discussd.Rtenewved License No. NPF%35 Am ndment No. 238 (2) TedbV dctA SAMM2ciitlord The Technical Srw'tiatins contafred fIn A-ppedix .as revisd fthugh ,AImldfft t~k. 234A.: VMt. are Sat ed herglo, rWhereby cxoraled knt this renewed operatig icens. Duke Pmwe Comrn LLC shal operale the fadtLy In accrdance with the Tedcnal (3) lixlte inl aft Aals~is Reor"rs Updted Final Safety Analysis Report supplemet uiMded PMRa to 10 CFR 64.21(d)a as revised an December 16, 2002M. desibes-ceraiin futre adlttes to be co=pleted before the period of extended operation.

Duke shad*onpIets them secyiltes no lter Sum Febrwy 24,2025, wnd su tie NRC In writing when knplimernton of these a8vdles Is complete and can be vedred by NRC Inspecoon.

The Updated Fnal Safety Analyes Reort supplement as revised on December 16,202 descrbed above. shall be hidde In the neid Scheduled update to the Upd4 td Fbn Safety Arnalyisf Repoxt equrd by 10 CFR 60.71(eX4), following Issuance of tds renewed operating Bceme. Urt fat updae Is complete, Duke may make changes to the programs describd In such sulemWent wMh prior Commission approval, provided-Wt Duke evaulates ewdi such change pursuant b the crtera set forth In10 CFR 50.59 M Ad otherlwse compiles with tae requirements In tht W ciol.(4) ,,drmt QMW Duke Power Conan LLC shD comply wih fte aist a n ionms dellnested

  • In Appendlx C to fts rnewed opemtng licese.(6) E Prote. eMgm (Section M..1, GER, SSER M SE #31 SSER #4, Due Power Compy W LLC shalk riplement and maintabn In effed al of Me approved ir prot n program as decrbed in the Updated inl Sety Anabi15 Report.. as-amended, for tje faclty andas appnwved In Vie SER through SuplementS.

rn*, d to fth followkf ..lp;riskn:

" The licensee miay make dwanes to the approved fire protection program wihout prfr approval of tfe CmTls only 9 11ose dnges would ndt adversely affect the abiy to achieve end safe dwzown In the event are r-.-The parenthetkl notakion 1follwet the tt of lIfs renewed operaftng ICnse cwidlon denotes the secton of #* Safety Evaluation Repot, andlor Its suppleffierfsweretn.this renewed license ncdmtl Is discussed.

Renewed L nMn No. PF.623 Armedmenit

o. 234 ECCS -Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each ECCS automatic valve in the flow path that is 18 months not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.SR 3.5.2.6 Verify each ECCS pump starts automatically on an actual 18 months or simulated actuation signal.SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, each 18 months position stop is in the correct position.Centrifugal Charging Safety Injection Pump Injection Throttle Pump Throttle Valve Number Valve Number N114 N1164 N116 NI166 NI18 N1168 N120 N1170 SR 3.5.2.8 Verify, by visual inspection, that the ECCs containment 18 months sump strainer assembly is not restricted by debris and shows no evidence of structural distress or abnormal corrosion.

Catawba Units 1 and 2 3.5.2-3 Amendment Nos. 238 & 234