Line 1: Line 1:
#REDIRECT [[IR 05000400/2008301]]
{{Adams
| number = ML081260334
| issue date = 05/02/2008
| title = Er 05000400-08-301; 3/10-21/2008; Shearon Harris Nuclear Power Plant, Licensed Operator Examinations
| author name = Widman M A
| author affiliation = NRC/RGN-II/DRS/OLB
| addressee name = Duncan R J
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| license number = NPF-063
| contact person =
| case reference number = 50-400/08-301
| document report number = 50-400/08-301
| document type = Letter, License-Operator Examination Report
| page count = 11
}}
See also: [[followed by::IR 05000400/2008301]]
 
=Text=
{{#Wiki_filter:May 2, 2008 Carolina Power & Light Company
ATTN: Mr. Robert J. Duncan II Vice President - Harris Plant Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code:  Zone 1
New Hill, NC  27562-0165
 
SUBJECT:      SHEARON HARRIS NUCLEAR POWER PLANT - NRC EXAMINATION REPORT NO. 05000400/2008301 
Dear Mr. Duncan:
 
During the period of March 10 -13, 2008, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for
licenses to operate the Shearon Harris Nuclear Power Plant.  The examiners discussed
preliminary findings related to the operating test and written examination submittal with those
members of your staff identified in the enclosed report on March 13, 2008.  The written
examination was administered by your staff on March 21, 2008. 
 
Two Senior Reactor Operator applicants and two Reactor Operator applicants passed both the
written and operating examinations.  There were no post examination comments.  A Simulation
Facility Report is in
cluded in this report
as Enclosure 2. 
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter and its enclosures will be available electronically for public ins
pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC
=s document system (ADAMS.)  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room.)
 
Sincerely,        /RA/  Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-400
License No. NPF-63
 
Enclosures: 1.  Report Details 2. NRC Resolution to the Facility Comment    3.  Simulation Facility Report
 
(cc w/encl: See page 2) 
CP&L  2 cc w/encl: Paul Fulford, Manager
Performance Evaluation and
  Regulatory Affairs    PEB 5
Carolina Power & Light Company
Electronic Mail Distribution
 
Chris L. Burton
Director of Site Operations
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
 
J. Wayne Gurganious
Training Manager-Harris Plant
Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center
Electronic Mail Distribution
 
Thomas J. Natale, Manager
Support Services
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
 
David H. Corlett, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
 
David T. Conley
Associate General Counsel - Legal
Department
Progress Energy Service Company, LLC
Electronic Mail Distribution
 
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC  20037-1128
 
Beverly Hall, Chief, Radiation  Protection Section
N. C. Department of Environmental
  Commerce & Natural Resources
Electronic Mail Distribution
 
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC  29211
 
Chairman of the North Carolina
  Utilities Commission
c/o Sam Watson, Staff Attorney
Electronic Mail Distribution
 
Robert P. Gruber
Executive Director
Public Staff NCUC
4326 Mail Service Center
Raleigh, NC  27699-4326
 
Herb Council, Chair
Board of County Commissioners
  of Wake County
P. O. Box 550
Raleigh, NC  27602
 
Tommy Emerson, Chair
Board of County Commissioners
  of Chatham County
Electronic Mail Distribution
 
Mr.  J. Wayne Gurganious 
Training Manager - Harris Plant 
Harris Energy & Environmental Center
Progress Energy Carolinas, Inc. 
P. O. Box 327, State Road 1127
New Hill, NC  27562-0165 
 
Progress Energy Carolinas, Inc.
ATTN:  Mr. J. Wayne Gurganious
Training Manager
Harris Energy & Env. Center
Shearon Harris Nuclear Power Plant
P.O. Box 327, State Road 1127
New Hill, SC  27562-0165
 
 
CP&L 3  Distribution w/encl
: M. Vaaler, NRR
R. Musser, RII
RIDSNRRDIRS
PUBLIC
 
_                         
______  OFFICE RII:DRS RII:DRS RII:DRP    SIGNATURE GWL MTW RXM1    NAME GLaska MWidmann RMusser    DATE 04/30/2008 05/02/2008
05/02/2008
    E-MAIL COPY?    YESNO      YES      YESNO      YESNO      YESNO      YESNO      YESNO     
CP&L  2 cc w/encl: Paul Fulford, Manager
Performance Evaluation and
  Regulatory Affairs    PEB 5
Carolina Power & Light Company
Electronic Mail Distribution
 
Chris L. Burton
Director of Site Operations
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
 
J. Wayne Gurganious
Training Manager-Harris Plant
Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center
Electronic Mail Distribution
 
Thomas J. Natale, Manager
Support Services
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
 
David H. Corlett, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
 
David T. Conley
Associate General Counsel - Legal
Department
Progress Energy Service Company, LLC
Electronic Mail Distribution
 
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC  20037-1128
 
Beverly Hall, Chief, Radiation  Protection Section
N. C. Department of Environmental
  Commerce & Natural Resources
Electronic Mail Distribution
 
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC  29211
 
Chairman of the North Carolina
  Utilities Commission
c/o Sam Watson, Staff Attorney
Electronic Mail Distribution
 
Robert P. Gruber
Executive Director
Public Staff NCUC
4326 Mail Service Center
Raleigh, NC  27699-4326
 
Herb Council, Chair
Board of County Commissioners
  of Wake County
P. O. Box 550
Raleigh, NC  27602
 
Tommy Emerson, Chair
Board of County Commissioners
  of Chatham County
Electronic Mail Distribution
 
Mr.  J. Wayne Gurganious 
Training Manager - Harris Plant 
Harris Energy & Environmental Center
Progress Energy Carolinas, Inc. 
P. O. Box 327, State Road 1127
New Hill, NC  27562-0165 
 
Progress Energy Carolinas, Inc.
ATTN:  Mr. J. Wayne Gurganious
Training Manager
Harris Energy & Env. Center
Shearon Harris Nuclear Power Plant
P.O. Box 327, State Road 1127
New Hill, SC  27562-0165
CP&L  3  Distribution w/encl
: M. Vaaler, NRR
R. Musser, RII
RIDSNRRDIRS
PUBLIC
    NUCLEAR REGULATORY COMMISSION
 
REGION II
 
Docket Nos.:  05000400
License Nos.:  NPF-63
Report Nos.:  05000400/2008301
Licensee:  Carolina Power & Light Company (CP&L)
Facility:  Shearon Harris Nuclear Power Plant
Location:  5413 Shearon Harris Road New Hill, NC 27562
Dates:  Operating Tests - March 10-13, 2008 Written Examination - March 21, 2008
Examiners:  G. Laska, Chief Examiner B. Larson, Operations Engineer-Region IV 
Approved by:  M. Widmann, Chief Operations Branch
Division of Reactor Safety
Enclosure 1 
   
SUMMARY OF FINDINGS
 
ER 05000400/2008301; 3/10-21/2008; Shearon Harris Nuclear Power Plant, Licensed Operator
Examinations.
 
The NRC examiners conducted operator licensing initial examinations in accordance with the
guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, 
Rev. 9.  This examination implemented the operator licensing requirements of 10 CFR
'55.41, '55.43, and
'55.45.  The NRC administered the operating tests during the period of March 10-13, 2008.  Members of
the Shearon Harris Nuclear Power Plant training staff administered the written examination on
March 21, 2008.  The operator licensing initial written examinations and operating tests were
developed by the licensee.  Two Senior Reactor Operator (SRO) and two Reactor Operator (RO)
applicants passed both the written and operating examinations.  Two SRO applicants and two
RO applicants were issued operating licenses. 
 
The initial written examination submittal was determined to be outside of the acceptable quality
range as outlined in NUREG-1021.  Twenty-two of 25 SRO and 4 of 13 RO questions sampled
for initial review contained unacceptable flaws.  Individual questions were evaluated as
unsatisfactory because they did not test the knowledge required by the selected topic, contained
implausible distractors, did not test at the appropriate license level and/or contained other
psychometric flaws. The NRC regional office returned the examination to the licensee for rework
and correction in accordance with NUREG-1021. Future examinations need to incorporate
lessons learned.
 
Enclosure 1
 
  Report Details
 
4. OTHER ACTIVITIES (OA)
 
4OA5 Operator Licensing Initial Examinations
 
  a. Inspection Scope
  The licensee developed the operating tests and written examinations.  The NRC
examination team reviewed the proposed examination material to determine whether it
was developed in accordance with NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ Revision 9.  Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiners reviewed the licensee
=s examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests. 
The examiners evaluated two Senior Reactor applicants (SRO) and two Reactor
Operator (RO) applicants who were being assessed under the guidelines specified in
NUREG-1021.  The examiners administered the operating tests during the period
of March 10-13, 2008.  Members of the Shearon Harris Nuclear Power Plant training staff
administered the written examination on March 21, 2008.  The evaluations of the
applicants and review of documentation were performed to determine if the applicants,
who applied for licensees to operate the Shearon Harris Nuclear Power Plant, met
requirements specified in 10 CFR Part 55.
  b. Findings
  The initial written examination submittal was determined to be outside of the acceptable
quality range as outlined in NUREG-1021.  Twenty-two of 25 SRO and 4 of 13 RO
questions sampled for initial review contained unacceptable flaws.  Individual questions
were evaluated as unsatisfactory because they did not test the knowledge required by
the selected topic, contained implausible distractors, did not test at the appropriate
license level and/or contained other psychometric flaws.  The NRC regional office
returned the examination to the licensee for rework and correction in accordance with
NUREG-1021.  Future examinations need to incorporate lessons learned.
Two SRO and two RO applicants passed both the operating test and written
examination.  There were no post examination comments. 
 
The final RO and SRO written examinations with references, and combined SRO/RO
with knowledge and abilities (K/As) and answers may be accessed in the ADAMS system (ADAMS Accession Number ML081140047, ML081140054, and ML081140063).
          Enclosure 1 
CP&L      4
  4OA6 Meetings
Exit Meeting Summary
  On March 13, 2008, the Chief Examiner discussed generic applicant performance and
examination development issues with members of licensee management.  The
inspectors asked the licensee whether any materials examined during the inspection
should be considered proprietary.  No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED
Licensee 
C. Burton, Director Site Operations - Harris Nuclear Plant
K. Henderson, Plant General Manager - Harris Nuclear Plant
J. Warner, Manager - Operations
D. McGee, Manager - Shift Operations
W. Gurganious, Manager - Training
G. Kilpatrick, Superintendent - Superintendant - Operations Training
T. Toler, Supervisor - Operator Initial Training
K. Bailey, Operator Continuing Training (OCT) Supervisor
T. Craig, Sr. Instructor
D. McDede, Simulator Support
K. Stacy - Licensing/Regulatory Programs
 
NRC 
P. O=Bryan, Senior Resident Inspector
 
Enclosure 1
  Enclosure 2
Simulation Facility Report
 
Facility Licensee:  Shearon Harris Nuclear Power Plant
Facility Docke
t No.:  05000400
Operating Tests Administered on: March 10-13, 2008
 
This form is to be used only to report observations.  These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with IP
71111.11, are not indicative of noncompliance with 10 CFR 55.46.  No licensee action is
required in response to these observations.
 
While conducting the simulator portion of the operating tests, examiners did not observe any
simulation fidelity issues.
}}

Revision as of 02:25, 10 February 2019

Er 05000400-08-301; 3/10-21/2008; Shearon Harris Nuclear Power Plant, Licensed Operator Examinations
ML081260334
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/02/2008
From: Widman M A
NRC/RGN-II/DRS/OLB
To: Duncan R J
Carolina Power & Light Co
References
50-400/08-301 50-400/08-301
Download: ML081260334 (11)


See also: IR 05000400/2008301

Text

May 2, 2008 Carolina Power & Light Company

ATTN: Mr. Robert J. Duncan II Vice President - Harris Plant Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Code: Zone 1

New Hill, NC 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - NRC EXAMINATION REPORT NO. 05000400/2008301

Dear Mr. Duncan:

During the period of March 10 -13, 2008, the Nuclear Regulatory Commission (NRC)

administered operating examinations to employees of your company who had applied for

licenses to operate the Shearon Harris Nuclear Power Plant. The examiners discussed

preliminary findings related to the operating test and written examination submittal with those

members of your staff identified in the enclosed report on March 13, 2008. The written

examination was administered by your staff on March 21, 2008.

Two Senior Reactor Operator applicants and two Reactor Operator applicants passed both the

written and operating examinations. There were no post examination comments. A Simulation

Facility Report is in

cluded in this report

as Enclosure 2.

In accordance with 10 CFR 2.390 of the NRC

=s ARules of Practice,@ a copy of this letter and its enclosures will be available electronically for public ins

pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC

=s document system (ADAMS.) ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room.)

Sincerely, /RA/ Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-400

License No. NPF-63

Enclosures: 1. Report Details 2. NRC Resolution to the Facility Comment 3. Simulation Facility Report

(cc w/encl: See page 2)

CP&L 2 cc w/encl: Paul Fulford, Manager

Performance Evaluation and

Regulatory Affairs PEB 5

Carolina Power & Light Company

Electronic Mail Distribution

Chris L. Burton

Director of Site Operations

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

J. Wayne Gurganious

Training Manager-Harris Plant

Progress Energy Carolinas, Inc.

Harris Energy & Environmental Center

Electronic Mail Distribution

Thomas J. Natale, Manager

Support Services

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

David H. Corlett, Supervisor

Licensing/Regulatory Programs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

David T. Conley

Associate General Counsel - Legal

Department

Progress Energy Service Company, LLC

Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Beverly Hall, Chief, Radiation Protection Section

N. C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Public Service Commission

State of South Carolina

P. O. Box 11649

Columbia, SC 29211

Chairman of the North Carolina

Utilities Commission

c/o Sam Watson, Staff Attorney

Electronic Mail Distribution

Robert P. Gruber

Executive Director

Public Staff NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

Herb Council, Chair

Board of County Commissioners

of Wake County

P. O. Box 550

Raleigh, NC 27602

Tommy Emerson, Chair

Board of County Commissioners

of Chatham County

Electronic Mail Distribution

Mr. J. Wayne Gurganious

Training Manager - Harris Plant

Harris Energy & Environmental Center

Progress Energy Carolinas, Inc.

P. O. Box 327, State Road 1127

New Hill, NC 27562-0165

Progress Energy Carolinas, Inc.

ATTN: Mr. J. Wayne Gurganious

Training Manager

Harris Energy & Env. Center

Shearon Harris Nuclear Power Plant

P.O. Box 327, State Road 1127

New Hill, SC 27562-0165

CP&L 3 Distribution w/encl

M. Vaaler, NRR

R. Musser, RII

RIDSNRRDIRS

PUBLIC

_

______ OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE GWL MTW RXM1 NAME GLaska MWidmann RMusser DATE 04/30/2008 05/02/2008

05/02/2008

E-MAIL COPY? YESNO YES YESNO YESNO YESNO YESNO YESNO

CP&L 2 cc w/encl: Paul Fulford, Manager

Performance Evaluation and

Regulatory Affairs PEB 5

Carolina Power & Light Company

Electronic Mail Distribution

Chris L. Burton

Director of Site Operations

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

J. Wayne Gurganious

Training Manager-Harris Plant

Progress Energy Carolinas, Inc.

Harris Energy & Environmental Center

Electronic Mail Distribution

Thomas J. Natale, Manager

Support Services

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

David H. Corlett, Supervisor

Licensing/Regulatory Programs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

David T. Conley

Associate General Counsel - Legal

Department

Progress Energy Service Company, LLC

Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Beverly Hall, Chief, Radiation Protection Section

N. C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Public Service Commission

State of South Carolina

P. O. Box 11649

Columbia, SC 29211

Chairman of the North Carolina

Utilities Commission

c/o Sam Watson, Staff Attorney

Electronic Mail Distribution

Robert P. Gruber

Executive Director

Public Staff NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

Herb Council, Chair

Board of County Commissioners

of Wake County

P. O. Box 550

Raleigh, NC 27602

Tommy Emerson, Chair

Board of County Commissioners

of Chatham County

Electronic Mail Distribution

Mr. J. Wayne Gurganious

Training Manager - Harris Plant

Harris Energy & Environmental Center

Progress Energy Carolinas, Inc.

P. O. Box 327, State Road 1127

New Hill, NC 27562-0165

Progress Energy Carolinas, Inc.

ATTN: Mr. J. Wayne Gurganious

Training Manager

Harris Energy & Env. Center

Shearon Harris Nuclear Power Plant

P.O. Box 327, State Road 1127

New Hill, SC 27562-0165

CP&L 3 Distribution w/encl

M. Vaaler, NRR

R. Musser, RII

RIDSNRRDIRS

PUBLIC

NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos.: 05000400

License Nos.: NPF-63

Report Nos.: 05000400/2008301

Licensee: Carolina Power & Light Company (CP&L)

Facility: Shearon Harris Nuclear Power Plant

Location: 5413 Shearon Harris Road New Hill, NC 27562

Dates: Operating Tests - March 10-13, 2008 Written Examination - March 21, 2008

Examiners: G. Laska, Chief Examiner B. Larson, Operations Engineer-Region IV

Approved by: M. Widmann, Chief Operations Branch

Division of Reactor Safety

Enclosure 1

SUMMARY OF FINDINGS

ER 05000400/2008301; 3/10-21/2008; Shearon Harris Nuclear Power Plant, Licensed Operator

Examinations.

The NRC examiners conducted operator licensing initial examinations in accordance with the

guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors,

Rev. 9. This examination implemented the operator licensing requirements of 10 CFR

'55.41, '55.43, and

'55.45. The NRC administered the operating tests during the period of March 10-13, 2008. Members of

the Shearon Harris Nuclear Power Plant training staff administered the written examination on

March 21, 2008. The operator licensing initial written examinations and operating tests were

developed by the licensee. Two Senior Reactor Operator (SRO) and two Reactor Operator (RO)

applicants passed both the written and operating examinations. Two SRO applicants and two

RO applicants were issued operating licenses.

The initial written examination submittal was determined to be outside of the acceptable quality

range as outlined in NUREG-1021. Twenty-two of 25 SRO and 4 of 13 RO questions sampled

for initial review contained unacceptable flaws. Individual questions were evaluated as

unsatisfactory because they did not test the knowledge required by the selected topic, contained

implausible distractors, did not test at the appropriate license level and/or contained other

psychometric flaws. The NRC regional office returned the examination to the licensee for rework

and correction in accordance with NUREG-1021. Future examinations need to incorporate

lessons learned.

Enclosure 1

Report Details

4. OTHER ACTIVITIES (OA)

4OA5 Operator Licensing Initial Examinations

a. Inspection Scope

The licensee developed the operating tests and written examinations. The NRC

examination team reviewed the proposed examination material to determine whether it

was developed in accordance with NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ Revision 9. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.

The examiners reviewed the licensee

=s examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests.

The examiners evaluated two Senior Reactor applicants (SRO) and two Reactor

Operator (RO) applicants who were being assessed under the guidelines specified in

NUREG-1021. The examiners administered the operating tests during the period

of March 10-13, 2008. Members of the Shearon Harris Nuclear Power Plant training staff

administered the written examination on March 21, 2008. The evaluations of the

applicants and review of documentation were performed to determine if the applicants,

who applied for licensees to operate the Shearon Harris Nuclear Power Plant, met

requirements specified in 10 CFR Part 55.

b. Findings

The initial written examination submittal was determined to be outside of the acceptable

quality range as outlined in NUREG-1021. Twenty-two of 25 SRO and 4 of 13 RO

questions sampled for initial review contained unacceptable flaws. Individual questions

were evaluated as unsatisfactory because they did not test the knowledge required by

the selected topic, contained implausible distractors, did not test at the appropriate

license level and/or contained other psychometric flaws. The NRC regional office

returned the examination to the licensee for rework and correction in accordance with

NUREG-1021. Future examinations need to incorporate lessons learned.

Two SRO and two RO applicants passed both the operating test and written

examination. There were no post examination comments.

The final RO and SRO written examinations with references, and combined SRO/RO

with knowledge and abilities (K/As) and answers may be accessed in the ADAMS system (ADAMS Accession Number ML081140047, ML081140054, and ML081140063).

Enclosure 1

CP&L 4

4OA6 Meetings

Exit Meeting Summary

On March 13, 2008, the Chief Examiner discussed generic applicant performance and

examination development issues with members of licensee management. The

inspectors asked the licensee whether any materials examined during the inspection

should be considered proprietary. No proprietary information was identified.

PARTIAL LIST OF PERSONS CONTACTED

Licensee

C. Burton, Director Site Operations - Harris Nuclear Plant

K. Henderson, Plant General Manager - Harris Nuclear Plant

J. Warner, Manager - Operations

D. McGee, Manager - Shift Operations

W. Gurganious, Manager - Training

G. Kilpatrick, Superintendent - Superintendant - Operations Training

T. Toler, Supervisor - Operator Initial Training

K. Bailey, Operator Continuing Training (OCT) Supervisor

T. Craig, Sr. Instructor

D. McDede, Simulator Support

K. Stacy - Licensing/Regulatory Programs

NRC

P. O=Bryan, Senior Resident Inspector

Enclosure 1

Enclosure 2

Simulation Facility Report

Facility Licensee: Shearon Harris Nuclear Power Plant

Facility Docke

t No.: 05000400

Operating Tests Administered on: March 10-13, 2008

This form is to be used only to report observations. These observations do not constitute audit

or inspection findings and, without further verification and review in accordance with IP

71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is

required in response to these observations.

While conducting the simulator portion of the operating tests, examiners did not observe any

simulation fidelity issues.