June 14, 2021 Ms. Kim Maza Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd M/C HNP01 New Hill, NC 27562-9300

SUBJECT:

RE-ISSUE - SHEARON HARRIS NUCLEAR POWER PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000400/2021301

Dear Ms. Maza:

On May 18, 2021, the US Nuclear Regulatory Commission (NRC) issued the License Examination Report for the Shearon Harris Nuclear Plant, ADAMS Accession Number ML21139A183. In reviewing this report, we identified an administrative error regarding the Enterprise Identifier (EPID) number. Specifically, that EPID L-2020-OLL-0029 should be L-2021-OLL-0043. We request that the cover letter and report be replaced with the Enclosures to this letter.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public inspection, exemptions, requests for withholding of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, of the Publicly Available Records (PARS) component of NRCs ADAMS; accessible from the NRC Website at https://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4662, with any questions you have regarding this letter.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No: 50-400 License No: NPF-63

Enclosures:

1. Report Details
2. Simulator Fidelity Report cc: Distribution via Listserv

ML21167A287  : SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/OB1 RII:DRS/OB1 RII:DRS/OB1 NAME DEgelstad MDonithan EGuthrie DATE 5/ 26 /2021 5/ 26 /2021 6/ 14 /2021

May 18, 2021 Ms. Kim Maza Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd M/C HNP01 New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000400/2021301

Dear Ms. Maza:

On April 14, 2021, the Nuclear Regulatory Commission (NRC) administered a retake simulator operating tests to an employee of your company who had applied for a license to operate the Harris Nuclear Power Plant. At the conclusion of the test, the Chief Examiner discussed preliminary findings related to the simulator operating test submittal with those members of your staff identified in the enclosed report.

One Senior Reactor Operator (SRO) retake applicant passed the simulator operating test.

There were no post-administration comments. The retake applicant passed all other parts of the operating test administered by NRC examiners during the week of November 16, 2020, and also passed the written examination administered by your staff on November 24, 2020. A Simulator Fidelity Report is included in this report as Enclosure 2.

The retake simulator operating test submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room)

Enclosure 1

2 If you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No: 50-400 License No: NPF-63

Enclosures:

1. Report Details
2. Simulator Fidelity Report

_ ML21139A183 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE: RII:DRS RII:DRS NAME: MDonithan GGuthrie DATE: 4/ 21 /2021 5/ 18 /2021 4

U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket No.: 50-400 License No.: NPF-63 Report No.: 05000400/2021301 Enterprise Identifier: L-2021-OLL-0043 Licensee: Duke Energy Carolinas LLC Facility: Shearon Harris Nuclear Power Plant Location: New Hill, NC Dates: Retake Simulator Operating Test - April 14, 2021 Examiners: M. Donithan, Chief Examiner, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety

5

SUMMARY

ER 05000400/2021301; retake simulator operating test April 14, 2021; Shearon Harris Nuclear Power Plant; Operator License Examination.

A Nuclear Regulatory Commission (NRC) examiner conducted a retake simulator operating test in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.45, as applicable.

Members of the Shearon Harris Nuclear Power Plant staff developed the retake simulator operating test. The retake operating test met the quality guidelines contained in NUREG-1021.

The NRC administered the retake simulator operating test on April 14, 2021. One SRO retake applicant passed the retake simulator operating test. He had passed the other portions of the operating test, and the written examination, in November 2020. One retake applicant was issued an SRO license.

There were no post-examination comments.

No findings were identified.

6 REPORT DETAILS

4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations
a. Inspection Scope The NRC evaluated the submitted retake simulator operating test, which consisted of two simulator scenarios, by combining the scenario events in order to determine the percentage of submitted test items that required replacement or significant modification.

The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.

The NRC reviewed the licensees examination security measures while preparing and administering the retake simulator operating test in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.

The NRC administered the retake simulator operating test on April 14, 2021. The NRC examiner evaluated one SRO retake applicant using the guidelines contained in NUREG-1021. Evaluation of the retake applicant and review of associated documentation was performed to determine if the met the requirements specified in 10 CFR Part 55, Operators Licenses.

The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the retake simulator operating test.

b. Findings No findings were identified.

Members of the Shearon Harris Nuclear Power Plant staff developed the retake simulator operating test (two scenarios). All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC examiner reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.

The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.

7 One Senior Reactor Operator (SRO) retake applicant passed simulator operating test.

One SRO retake applicant was issued a license.

The facility licensee and applicant submitted no post-examination comments.

4OA6 Meetings, Including Exit Exit Meeting Summary On April 28, 2021, the NRC Chief Examiner discussed the results of the retake operating test with members of the Shearon Harris Nuclear Power Plant staff.

KEY POINTS OF CONTACT Licensee personnel S. Cahill, Training Manager S. Rua, AOTP/Regulated Exam/Simulator Support Superintendent S. McDaniel, Sr. Nuclear Engineer, Regulatory Affairs R. Horton, Operations Training Instructor

SIMULATOR FIDELITY REPORT Facility Licensee: Shearon Harris Nuclear Power Plant Facility Docket No.: 05000400 Operating Test Administered: April 14, 2021 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

No simulator discrepancies were observed.

Enclosure 2