|
|
Line 2: |
Line 2: |
| | number = ML093310391 | | | number = ML093310391 |
| | issue date = 12/04/2009 | | | issue date = 12/04/2009 |
| | title = St. Lucie Unit 2 - Request for Withholding Information from Public Disclosure (TAC No. ME1883) | | | title = Request for Withholding Information from Public Disclosure (TAC No. ME1883) |
| | author name = Orf T J | | | author name = Orf T J |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0925302882009-09-11011 September 2009 Withholding from Public Disclosure, Florida Power & Light Company, L-2009-192, Data for NRC (Nuclear Regulatory Commission) Confirmatory EPU (Extended Power Uprate) Analyses, Attachment 2, TAC ME1883 Project stage: Other ML0933103912009-12-0404 December 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2009-12-04
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARML24281A1592024-10-0707 October 2024 Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles ML21292A2252021-11-0808 November 2021 Revised Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application ML19253D1842019-09-27027 September 2019 Request for Withholding Information from Public Disclosure for St. Lucie Plant, Unit No. 1 ML16139A2002016-05-26026 May 2016 Request for Information from Public Disclosure ML16008A1692016-01-14014 January 2016 Request for Withholding Information from Public Disclosure for the St. Lucie Plant, Unit No. 2 ML15322A3612015-12-23023 December 2015 Request for Withholding Information from Public Disclosure for the St. Lucie Plant, Unit Nos. 1 and 2 ML15310A4052015-12-0202 December 2015 Request for Withholding Information from Public Disclosure for the St. Lucie Plant, Unit No. 2 ML15224B3192015-09-21021 September 2015 Request for Withholding Information from Public Disclosure for the St. Lucie Plant, Unit 2 ML15197A3392015-08-31031 August 2015 Request for Withholding Proprietary Information from Public Disclosure for the License Amendment Request and Exemption Request Regarding the Transitioning to Areva Fuel ML0933103912009-12-0404 December 2009 Request for Withholding Information from Public Disclosure ML0925302882009-09-11011 September 2009 Withholding from Public Disclosure, Florida Power & Light Company, L-2009-192, Data for NRC (Nuclear Regulatory Commission) Confirmatory EPU (Extended Power Uprate) Analyses, Attachment 2, TAC ME1883 ML0605903552006-03-0808 March 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0600901762006-01-13013 January 2006 Letter, Request for Withholding Information from Public Disclosure for St. Lucie Nuclear Plant, Unit 2 (Tac No. MC8757) ML0504705252005-02-15015 February 2005 Ltr, J. A. Gresham from B. Moroney, Withholding Information from Public Disclosure, Proposed License Amendment, Add Steam Generator Repair Method, Westinghouse Electric LLC, Alloy 800 Leak Limiting Sleeves ML0428706072004-10-0707 October 2004 Westinghouse Electric Co, LLC, Withholding from Public Disclosure, St. Lucie Unit 2, Proposed License Amendment, Request for Additional Information Response, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Li ML0412601042004-04-28028 April 2004 Framatome Anp, Inc., Request for Withholding Information from Public Disclosure for St. Lucie Unit 1, Loss of Forced Reactor Coolant Flow Analysis ML0403000102004-01-30030 January 2004 Westinghouse Request for Withholding Information from Public Disclosure, Westinghouse Licensing Report 30-percent Steam Generator Tube Plugging and WCAP-9272 Reload Methodology Transition Project - Appendix C. ML0332801672003-11-21021 November 2003 Holtec International Request for Withholding Information from Public Disclosure for St. Lucie, Units 1 & 2 ML0331100932003-11-0606 November 2003 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure ML0320200032003-07-21021 July 2003 Florida Power and Light Co, Withholding from Public Disclosure, WCAP -15975-P, Revision 0, NDE Inspection Strategy for the Tubesheet Region in Saint Lucie Unit 2 ML0314302142003-05-22022 May 2003 Withholding from Public Disclosure, WCAP-16038-P, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: St. Lucie Unit 2. ML0312806442003-05-0808 May 2003 Westinghouse Electric Co., Llc. (Wec), Request for Withholding Information from Public Disclosure for St. Lucie, Units 1 & 2 (TAC Nos. MB3406 & MB3412), Request Granted ML0301608932003-01-16016 January 2003 Holtec International Request for Holding Information from Public Disclosure ML0301607982003-01-16016 January 2003 Withholding from Public Disclosure, WCAP-15945-P, MB5917 ML0232603672002-11-22022 November 2002 Withholding from Public Disclosure, Holtec Report HI-2022882, MB6627 & MB6628 2024-10-07
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 4, 2009 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 ST. LUCIE UNIT 2 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME1883)
Dear Mr. Nazar:
By letter dated November 13, 2009, Eric S. Katzman of your staff submitted an affidavit (CAW-09-2675) dated September 17,2009, executed by Michael J. Gancarz, Product Manager, Systems and Equipment Engineering
/I in Nuclear Services, Westinghouse Electric Company LLC requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Florida Power & Light Company, L-2009-208, "Data for !\IRC [Nuclear Regulatory Commission]
Confirmatory EPU [Extended Power Uprate] Analyses," Attachment 2 A nonproprietary copy of this document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavit, in conjunction with the annotations of the document in question, stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4).
M. -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2788.
Sincerely, Tracy J. Orf, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC P.O. Box Pittsburgh, Pennsylvania Additional distribution via Listserv M. -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2788.
Sincerely, IRA! Tracy J. Orf, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 Additional distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl2-2 TOrf, NRR LPL2-2 RlF RidsNrrLABClayton RidsOgcMailCenter RidsAcrsAcnw MailCTR RidsNrrPMStLucie RidsRgn2MailCenter ADAMS Accession No NRR-084. OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-2/PM NAME TOrf BClayton TBoyce TOrf DATE 12/01/09 11/27/09 12/03/09 12/04/09 OFFICIAL RECORD