ML17338A172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50, Safety Evaluation
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50, Safety Evaluation
| page count = 16
| page count = 16
| project = CAC:MF9831, EPID:L-2017-LLA-0235
| project = CAC:MF9831, EPID:L-2017-LLA-0023, EPID:L-2017-LLA-0235
| stage = Approval
| stage = Approval
}}
}}

Revision as of 12:20, 7 November 2018

Fort Calhoun, Unit 1 - Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-023
ML17338A172
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/19/2018
From: Kim J S
Special Projects and Process Branch
To: Fisher M J
Omaha Public Power District
Kim J S
References
CAC MF9831, EPID L-2017-LLA-0235
Download: ML17338A172 (16)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 19, 2018 Ms. Mary J. Fisher Vice President, Energy Production and Nuclear Decommissioning Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC-2-4 Blair, NE 68008

SUBJECT:

FORT CALHOUN STATION, UNIT 1 -ISSUANCE OF AMENDMENT RE: REMOVAL OF DRY CASK LOADING LIMITS (CAC NO. MF9831; EPID L-2017-LLA-0235)

Dear Ms. Fisher:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 296 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit 1 (FCS). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated June 9, 2017, as supplemented by letter dated September 21, 2017. The amendment deletes TS 2.8.3(6), "Spent Fuel Cask Loading," and associated Figure 2-11, "Limiting Burnup Criteria for Acceptable Storage in Spent Fuel Cask"; TS 3.2, Table 3-5, item 24, "Spent Fuel Cask Loading";

TS 4.3.1.3, Design Features associated with spent fuel casks; and portions of TS 3.2, Table 3-4, item 5, footnote (4) on boron concentration associated with cask loading.

M. Fisher A copy of the related Safety Evaluation is also enclosed.

The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285

Enclosures:

1. Amendment No. 296 to DPR-40 2. Safety Evaluation cc: Listserv Sincerely, James Kim, Project Manager Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 296 Renewed License No. DPR-40 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by the Omaha Public Power District (the licensee), dated June 9, 2017, as supplemented by letter dated September 21, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 1 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes as indicated in the attachment to this license amendment, and paragraph 3.8. of Renewed Facility Operating License No. DPR-40 is hereby amended to read as follows: B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 296, are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications.

3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.

Attachment:

Changes to the Renewed Facility Operating License No. DPR-40 and Technical Specifications Date of Issuance:

January 19, 2018 FOR THE NUCLEAR REGULA TORY COMMISSION IRA by Eva Brown for/ Douglas A Broaddus, Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ATTACHMENT TO LICENSE AMENDMENT NO. 296 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-40 FORT CALHOUN STATION, UNIT 1 DOCKET NO. 50-285 Replace the following pages of the Renewed Facility Operating License No. DPR-40 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. Renewed Facility Operating License No. DPR-40 REMOVE INSERT Technical Specifications REMOVE 2.8 -Page 14 2.8-Page 15 2.8-Page 28 2.8-Page 29 3.2-Page 8 3.2 -Page 14 4.0-Page 2 INSERT 2.8 -Page 14 2.8-Page 15 2.8-Page 28 3.2-Page 8 3.2 -Page 14 4.0-Page 2 (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 1 O CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.

3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is, subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A. Maximum Power Level 8. Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power). Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 296 are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications.

C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 1 O CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan," submitted by letter dated May 19, 2006. OPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The OPPD CSP was approved by License Amendment No. 266 and modified by License Amendment No. 284 and Amendment No. 294. Renewed Operating License No. DPR-40 Amendment No. 296 TECHNICAL SPECIFICATIONS

2.0 LIMITING

CONDITIONS FOR OPERATION

2.8 Refueling

2.8.3 Refueling

Operations

-Spent Fuel Pool 2.8.3(6) DELETED 2.8 -Page 14 Amendment No. ~. 296 TECHNICAL SPECIFICATIONS Intentionally Blank 2.8 -Page 15 Amendment No. ~. 296 TECHNICAL SPECIFICATIONS

2.0 LIMITING

CONDITIONS FOR OPERATION

2.8 Refueling

Bases (Continued) 2.8.3(6) DELETED References (1) USAR Section 9.5 (2) USAR Section 9.10 (3) USAR Section 14.18 2.8 -Page 28 Amendment No.--2§+, 296 TSBC 09-001-0 TSBC-09-006-0 TECHNICAL SPECIFICATIONS TABLE 3-4 (Continued)

MINIMUM FREQUENCIES FOR SAMPLING TESTS Type of Measurement Sample and Analysis and Analysis Frequency

1. Reactor Coolant (Continued) (c) Cold Shutdown (1) Chloride 1 per 3 days (Operating Mode 4) (d) Refueling Shutdown (1) Chloride 1 per 3 days (3 l (Operating Mode 5) (2) Boron Concentration 1 per 3 days(3 l (e) Refueling Operation (1) Chloride 1 per 3 days(3> (2) Boron Concentration 1 per 3 daysl 3 l 2. SIRWTank Boron Concentration M 3. Concentrated Boric Boron Concentration w Acid Tanks 4. SI Tanks Boron Concentration M 5. Spent Fuel Pool Boron Concentration See Footnote 4 below 6. Steam Generator Slowdown Isotopic Analysis for Dose Wl5) (Operating Modes 1 and 2) Equivalent 1-131 (1) Until the radioactivity of the reactor coolant is restored to :s;1 µCi/gm DOSE EQUIVALENT 1-131. (2) Sample to be taken after a minimum of 2 EFPD and 20 days of power operation have elapsed since reactor was subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer. (3) Boron and chloride sampling/analyses are not required when the core has been off-loaded.

Reinitiate boron and chloride sampling/analyses prior to reloading fuel into the cavity to assure adequate shutdown margin and allowable chloride levels are met. (4) Prior to placing unirradiated fuel assemblies in the spent fuel pool and weekly when unirradiated fuel assemblies are stored in the spent fuel pool. (5) When Steam Generator Dose Equivalent 1-131 exceeds 50 percent of the limits in Specification 2.20, the sampling and analysis frequency shall be increased to a minimum of 5 times per week. When Steam Generator Dose Equivalent 1-131 exceeds 75 percent of this limit, the sampling and analysis frequency shall be increased to a minimum of once per day. 3.2-Page 8 Amendment No. 28,67,86,124,133,152 172,188,239, 257, 289, 296 TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIES FOR EQUIPMENT TESTS 17. DELETED 18. Shutdown Cooling 19. Refueling Water Level 20. Spent Fuel Pool Level Test 1. Verify required shutdown cooling loops are OPERABLE and one shutdown cooling loop is IN OPERATION.

2. Verify correct breaker alignment and indicated power is available to the required shutdown cooling pump that is not IN OPERATION.

Verify refueling water level is 23 ft. above the top of the reactor vessel flange. Verify spent fuel pool water level is 23 ft. above the top of irradiated fuel assemblies seated in the storage racks. 21. Containment Penetrations Verify each required containment penetration is in the required status. 22. Spent Fuel Assembly Verify by administrative means that initial Storage enrichment and burnup of the fuel assembly is in accordance with Figure 2-10. 23. P-T Limit Curve Verify RCS Pressure, RCS temperature, and RCS heatup and cooldown rates are within the limits specified by the P-T limit Figure(s) shown in the PTLR. 24. DELETED 3.2-Page 14 Frequency S (when shutdown cooling is required by TS 2.8). W (when shutdown cooling is required by TS 2.8). USAR Section Reference Prior to commencing, and daily during CORE ALTERATIONS and/or REFUELING OPERATIONS inside containment.

Prior to commencing, and weekly during REFUELING OPERATIONS in the the spent fuel pool. Prior to commencing, and weekly during CORE ALTERATIONS and/or REFUELING OPERATIONS in containment.

Prior to storing the fuel assembly in Region 2 (including peripheral cells). This test is only required during RCS heatup and cooldown operations and RCS inservice leak and hydrostatic testing. While these operations are occurring, this test shall be performed every 30 minutes. 9 188 246 250 257, 274' Amendment No. 138* 16 * *

  • 2 77'. 289,296 TECHNICAL SPECIFICATIONS

4.0 DESIGN

FEATURES (Continued)

c. A nominal 8.6 inch center to center distance between fuel assemblies placed in Region 2, the high density fuel storage racks, d. A nominal 9.8 inches (East-West) by 10.3 inches (North South) center to center distances between fuel assemblies placed in Region 1, the low density fuel storage racks, e. New or partially spent fuel assemblies with a discharge burnup in the "acceptable domain" of Figure 2-10 for "Region 2 Unrestricted" may be allowed unrestricted storage in any of the Region 2 fuel storage racks in compliance with Reference (1 ). f. Partially spent fuel assemblies with a discharge burnup between the "acceptable domain" and "Peripheral Cells" of Figure 2-10 may be allowed unrestricted storage in the peripheral cells of the Region 2 fuel storage racks in compliance with Reference (1 ). g. New or partially spent fuel assemblies with a discharge burnup in the "unacceptable domain" of Figure 2-10 will be stored in Region 1 in compliance with Reference ( 1 ). 4.3.1.2 The new fuel storage rack is designed and shall be maintained with: a. Fuel assemblies having a maximum U-235 enrichment of 5.0 weight percent, b. A nominal 16 inch center to center distance between fuel assemblies placed in the storage rack. 4.3.1.3 DELETED 4.0 -Page 2 Amendment No. 236,239, 240, 296 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 296 TO RENEWED FACILITY OPERA TING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT 1 DOCKET NO. 50-285

1.0 INTRODUCTION

By application dated June 9, 2017, as supplemented by letter dated September 21, 2017 (Agencywide Documents Access and Management System Accession Nos. ML 17160A405 and ML 17264A750, respectively), Omaha Public Power District (OPPD, the licensee) requested changes to the Technical Specifications (TSs; Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit 1 (FCS). The proposed amendment would delete TS 2.8.3(6), "Spent Fuel Cask Loading," and associated Figure 2-11, "Limiting Burnup Criteria for Acceptable Storage in Spent Fuel Cask"; TS 3.2, Table 3-5, item 24, "Spent Fuel Cask Loading";

TS 4.3.1.3, Design Features associated with spent fuel casks; and portions of TS 3.2, Table 3-4, item 5, footnote (4) on boron concentration associated with cask loading. The supplemental letter dated September 21, 2017, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on August 15, 2017 (82 FR 38718).

2.0 REGULATORY EVALUATION

The requested amendment concerns criticality controls and loading of spent fuel casks. Currently, criticality requirements concerning spent fuel casks are in TS 2.8.3(6), "Spent Fuel Cask Loading," and associated Figure 2-11, "Limiting Burnup Criteria for Acceptable Storage in Spent Fuel Cask"; TS 3.2, Table 3-5, item 24, "Spent Fuel Cask Loading";

TS 4.3.1.3, Design Features associated with spent fuel casks; and portions of TS 3.2, Table 3-4, item 5, footnote (4) on boron concentration associated with cask loading. These requirements were placed into the TS by Amendment No. 239 dated April 10, 2006 (ADAMS Accession No. ML061000597).

The April 10, 2006, license amendment was prompted by Regulatory Issue Summary (RIS} 2005-05, "Regulatory Issues Regarding Criticality Analyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations," dated March 23, 2005 (ADAMS Enclosure 2 Accession No. ML043500532), which had advised reactor licensees that they must meet both the requirements of Section 50.68 of Title 1 O of the Code of Federal Regulations (1 O CFR) and 10 CFR Part 72 with respect to subcriticality during storage cask loading in spent fuel pools. Section 50.68 describes the requirements for maintaining subcriticality of fuel assemblies in the spent fuel pool. However, the Commission later amended 10 CFR 50.68 to state that the criticality accident requirements of 10 CFR 50.68(b) do not apply to fuel within a package or cask in a spent fuel pool. As the Commission explained when amending the rules (71 FR 66648; November 16, 2006, as confirmed by 72 FR 3705; January 26, 2007) (confirming effective date of new rule), the criticality accident requirements of 10 CFR Parts 71 or 72, as applicable, apply to fuel within a package or cask in a spent fuel pool. As a result of the rulemaking, a licensee moving fuel between the spent fuel pool and a package or cask need only analyze fuel within the package or cask according to 10 CFR Parts 71 or 72, as applicable, and is not required to analyze fuel within the package or cask using 10 CFR 50.68(b) requirements.

Section 50.68(c) of 10 CFR eliminated an unnecessary burden of addressing spent fuel criticality analyses for spent fuel pools under 10 CFR 50.68 and Independent Spent Fuel Storage Installations (ISFSI) under 10 CFR Part 72. In light of 50.68(c), there is no need for additional redundant criticality controls in the TS. Through operation of 10 CFR 72.210, a general license is issued for the storage of spent fuel in an ISFSI at power reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR Part 50. Through operation of 10 CFR 71.71(a), a general license is issued to any licensee of the Commission to transport, or to deliver to a carrier for transport, licensed material in a package for which a license, certificate of compliance, or other approval has been issued by the NRC. 3.0 TECHNICAL EVALUATION In reviewing this amendment request, the acceptance criterion used by the NRC staff was that the criticality controls to be eliminated from the TS were, in fact, those controls addressed by 10 CFR 50.68(c).

The NRC staff also considered whether any other licenses would be impacted by determining whether other licenses directly or indirectly takes credit for, or assumed the presence of, some aspect of the 10 CFR Part 50 license. Revising portions of TS 3,2, Table 3-4, item 5, footnote (4) to remove a reference to a normal operations sampling tests of spent fuel casks in the spent fuel pool is acceptable because OPPD is prohibited from operating the reactor or placing fuel in the reactor vessel at FCS pursuant to 10 CFR 50.829a)(2), and is no longer in a configuration or a condition under which the TS apply. On September 21, 2017, the licensee explained that although some station 1 O CFR Part 50 programs (i.e., Radiation Protection, Chemistry, Training, etc.) are credited in the 10 CFR Part 72 general license, there is no overlap between the programs and the requested license amendment.

In addition, the licensee affirmed that deleting these TS sections will not have any adverse impact on its cask loading requirements.

The NRC staff confirmed that the TS sections to be removed address criticality analyses for the casks, and that these analyses are no longer required due to 1 O CFR 50.68(c).

Therefore, the licensee's requested changes to delete TS 2.8.3(6), TS 3.2, Table 3-5, item 24, and Design Feature TS 4.3.1.3 are acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment on January 3, 2018. The State official had no comments.

5.0 ENVIRONMENTAL

CONSIDERATION The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.

The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on August 15, 2017 (82 FR 38718). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 1 O CFR 51.22(c)(9).

Pursua.nt to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:

K. Wood Date: January 19, 2018 M. Fisher

SUBJECT:

FORT CALHOUN STATION, UNIT 1 -ISSUANCE OF AMENDMENT RE: REMOVAL OF DRY CASK LOADING LIMITS (CAC NO. MF9831; EPID L-2017-LLA-0235)

DATED JANUARY 19, 2018 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLspb Resource RidsNrrDssStsb Resource RidsNrrDssSnpb Resource RidsNrrLAIBetts Resource RidsNrrLAJBurkhardt Resource RidsNrrPMFortCalhoun Resource RidsRgn4MailCenter Resource KWood, NRR ADAMS Accession No. ML 17338A172 OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LAiT NAME JKim I Betts DATE 12/22/17 12/18/17 OFFICE NRR/DSS/STSB/BC**

OGC-NLO** NAME VCusumano DRoth DATE 01/03/18 01/10/18 *memo dated **via email NRR/DORL/LSPB/LA NRR/DSS/SNPB/BC*

JBurkhardt Rlukes 12/22/17 11/7/2017 NRR/DORL/LSPB/BC N RR/DORL/LSPB/PM DBroaddus (EBrown for) JKim 01/19/18 01/19/18 OFFICIAL RECORD COPY