ML112440204: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity PlanPage 1 of 209/01/201108:53:19Report 2209/01/2011
{{#Wiki_filter:Page 1 of 2                                                                                Watts Bar 09/01/2011    08:53:19                                                          Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit          Planned Dates                                                                                                                                    No. of Staff Number        Start      End    Inspection Activity                                                            Title                                            on Site OL EXAM       - INITIAL EXAM PREP                                                                                                     5 1          09/19/2011  09/23/2011      V23362              WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                                                 5 1          10/17/2011  10/21/2011      V23362              WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES PSB1EP        - EMERGENCY PREPAREDNESS EXERCISE                                                                                        2 1          10/17/2011  10/21/2011  IP 7111401              Exercise Evaluation 1          10/17/2011  10/21/2011  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          10/17/2011  10/21/2011  IP 7111406              Drill Evaluation OL EXAM       - INITIAL EXAM - WEEK 2                                                                                                 4 1          10/24/2011  10/28/2011      V23362              WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES TI-177         - TI-177 GAS INTRUSION                                                                                                   3 1          12/12/2011  12/16/2011  IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System CDBI          - COMPONENT DESIGN BASES INSPECTION                                                                                     6 1          01/09/2012  01/13/2012  IP 7111121              Component Design Bases Inspection 1          01/30/2012  02/03/2012  IP 7111121              Component Design Bases Inspection 1          02/13/2012  02/17/2012  IP 7111121              Component Design Bases Inspection 1          02/27/2012  03/02/2012  IP 7111121              Component Design Bases Inspection MODS          - MODIFICATIONS INSPECTION                                                                                               3 1          05/21/2012  05/25/2012  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1          06/04/2012  06/08/2012  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EB3 HS         - TRIENNIAL HEAT SINK INSPECTION                                                                                         1 1          06/04/2012  06/08/2012  IP 7111107T            Heat Sink Performance PSB1-RP       - PUBLIC RADIATION SAFETY BASELINE                                                                                       3 1          09/10/2012  09/14/2012  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          09/10/2012  09/14/2012  IP 71124.07            Radiological Environmental Monitoring Program 1          09/10/2012  09/14/2012  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1          09/10/2012  09/14/2012  IP 71151                Performance Indicator Verification PSB1-RP       - RADIOLOGICAL HAZARD ANALYSIS                                                                                           1 1          09/10/2012  09/14/2012  IP 71124.01            Radiological Hazard Assessment and Exposure Controls PI&R           - PROBLEM IDENTIFICATION AND RESOLUTION                                                                                 5 1          10/09/2012  10/12/2012  IP 71152B              Problem Identification and Resolution 1          10/22/2012  10/26/2012  IP 71152B              Problem Identification and Resolution PSB1EP        - EMERGENCY PREPAREDNESS INSPECTION                                                                                     1 1          10/15/2012  10/19/2012  IP 7111402              Alert and Notification System Testing This report does not include INPO and OUTAGE activities.
-12/31/2012UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteWatts BarOL EXAM-INITIAL EXAM PREP 51 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIESV2336209/19/201109/23/2011OL EXAM-INITIAL EXAM - WEEK 1 51 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIESV2336210/17/201110/21/2011PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 21 IPExercise Evaluation711140110/17/201110/21/20111 IPEmergency Action Level and Emergency Plan Changes711140410/17/201110/21/20111 IPDrill Evaluation711140610/17/201110/21/2011OL EXAM-INITIAL EXAM - WEEK 2 41 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIESV2336210/24/201110/28/2011TI-177-TI-177 GAS INTRUSION 31 IPManaging Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System2515/17712/12/201112/16/2011CDBI-COMPONENT DESIGN BASES INSPECTION 61 IPComponent Design Bases Inspection711112101/09/201201/13/20121 IPComponent Design Bases Inspection711112101/30/201202/03/20121 IPComponent Design Bases Inspection711112102/13/201202/17/20121 IPComponent Design Bases Inspection711112102/27/201203/02/2012MODS-MODIFICATIONS INSPECTION 31 IPEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications7111117T05/21/201205/25/20121 IPEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications7111117T06/04/201206/08/2012EB3 HS-TRIENNIAL HEAT SINK INSPECTION 11 IPHeat Sink Performance7111107T06/04/201206/08/2012PSB1-RP-PUBLIC RADIATION SAFETY BASELINE 31 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/10/201209/14/20121 IPRadiological Environmental Monitoring Program71124.0709/10/201209/14/20121 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/10/201209/14/20121 IPPerformance Indicator Verification7115109/10/201209/14/2012PSB1-RP-RADIOLOGICAL HAZARD ANALYSIS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/10/201209/14/2012PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51 IPProblem Identification and Resolution71152B10/09/201210/12/20121 IPProblem Identification and Resolution71152B10/22/201210/26/2012PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 11 IPAlert and Notification System Testing711140210/15/201210/19/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.                                             Enclosure
Inspection / Activity PlanPage 2 of 209/01/201108:53:19Report 2209/01/2011
 
-12/31/2012UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteWatts BarPSB1EP-EMERGENCY PREPAREDNESS INSPECTION 11 IPEmergency Preparedness Organization Staffing and Augmentation System711140310/15/201210/19/20121 IPEmergency Action Level and Emergency Plan Changes711140410/15/201210/19/20121 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140510/15/201210/19/20121 IPPerformance Indicator Verification7115110/15/201210/19/2012OL RQ-REQUAL INSPECTION 21 IPLicensed Operator Requalification Program7111111B11/19/201211/23/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
Page 2 of 2                                                                              Watts Bar 09/01/2011    08:53:19                                                        Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit          Planned Dates                                                                                                      No. of Staff Number        Start      End    Inspection Activity                                                            Title              on Site PSB1EP        - EMERGENCY PREPAREDNESS INSPECTION                                                         1 1          10/15/2012  10/19/2012  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          10/15/2012  10/19/2012  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          10/15/2012  10/19/2012  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          10/15/2012  10/19/2012  IP 71151                Performance Indicator Verification OL RQ         - REQUAL INSPECTION                                                                         2 1          11/19/2012  11/23/2012  IP 7111111B            Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.               Enclosure}}

Latest revision as of 16:20, 12 November 2019

Report 22 - Watts Bar
ML112440204
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2011
From:
Reactor Projects Region 2 Branch 6
To:
Shared Package
ML112440204 List:
References
IR-11-006
Download: ML112440204 (2)


Text

Page 1 of 2 Watts Bar 09/01/2011 08:53:19 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP 5 1 09/19/2011 09/23/2011 V23362 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 5 1 10/17/2011 10/21/2011 V23362 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 2 1 10/17/2011 10/21/2011 IP 7111401 Exercise Evaluation 1 10/17/2011 10/21/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 10/17/2011 10/21/2011 IP 7111406 Drill Evaluation OL EXAM - INITIAL EXAM - WEEK 2 4 1 10/24/2011 10/28/2011 V23362 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES TI-177 - TI-177 GAS INTRUSION 3 1 12/12/2011 12/16/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System CDBI - COMPONENT DESIGN BASES INSPECTION 6 1 01/09/2012 01/13/2012 IP 7111121 Component Design Bases Inspection 1 01/30/2012 02/03/2012 IP 7111121 Component Design Bases Inspection 1 02/13/2012 02/17/2012 IP 7111121 Component Design Bases Inspection 1 02/27/2012 03/02/2012 IP 7111121 Component Design Bases Inspection MODS - MODIFICATIONS INSPECTION 3 1 05/21/2012 05/25/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 06/04/2012 06/08/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 1 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance PSB1-RP - PUBLIC RADIATION SAFETY BASELINE 3 1 09/10/2012 09/14/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 09/10/2012 09/14/2012 IP 71124.07 Radiological Environmental Monitoring Program 1 09/10/2012 09/14/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 09/10/2012 09/14/2012 IP 71151 Performance Indicator Verification PSB1-RP - RADIOLOGICAL HAZARD ANALYSIS 1 1 09/10/2012 09/14/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 10/09/2012 10/12/2012 IP 71152B Problem Identification and Resolution 1 10/22/2012 10/26/2012 IP 71152B Problem Identification and Resolution PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1 10/15/2012 10/19/2012 IP 7111402 Alert and Notification System Testing This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Watts Bar 09/01/2011 08:53:19 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1 10/15/2012 10/19/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 10/15/2012 10/19/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 10/15/2012 10/19/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 10/15/2012 10/19/2012 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1 11/19/2012 11/23/2012 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure