ML12170B104: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).  
{{#Wiki_filter:Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).
 
Your TEAM assignment
Your TEAM assignment
* After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
* After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
* Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.}}
* Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.}}

Latest revision as of 03:01, 12 November 2019

0772 - G105 - Conducting Inspections - Workshop #4 Scenario
ML12170B104
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/18/2012
From:
Office of the Chief Human Capital Officer
To:
References
Download: ML12170B104 (1)


Text

Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).

Your TEAM assignment

  • After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
  • Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.