Line 3: Line 3:
| issue date = 02/06/2014
| issue date = 02/06/2014
| title = IR 05000134-13-001, on 8/22/13 - 1/16/14, Worcester Polytechnic Institute, Worcester, Ma, Site. Cover Letter
| title = IR 05000134-13-001, on 8/22/13 - 1/16/14, Worcester Polytechnic Institute, Worcester, Ma, Site. Cover Letter
| author name = Ferdas M S
| author name = Ferdas M
| author affiliation = NRC/RGN-I/DNMS/NMSB3
| author affiliation = NRC/RGN-I/DNMS/NMSB3
| addressee name = Curley M J
| addressee name = Curley M
| addressee affiliation = Worcester Polytechnic Institute
| addressee affiliation = Worcester Polytechnic Institute
| docket = 05000134
| docket = 05000134
Line 15: Line 15:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000134/2013001]]
See also: [[see also::IR 05000134/2013001]]


=Text=
=Text=

Revision as of 16:46, 21 June 2019

IR 05000134-13-001, on 8/22/13 - 1/16/14, Worcester Polytechnic Institute, Worcester, Ma, Site. Cover Letter
ML14037A365
Person / Time
Site: 05000134
Issue date: 02/06/2014
From: Marc Ferdas
NRC/RGN-I/DNMS/NMSB3
To: Curley M
Worcester Polytechnic Institute
Shared Package
ML14024A421 List:
References
IR-13-001
Download: ML14037A365 (3)


See also: IR 05000134/2013001

Text

February 6, 2014

Docket No. 05000134License No. R-61

Michael J. Curley

University Compliance Officer

Worcester Polytechnic Institute

100 Institute Road

Worcester, MA 01609-2280

SUBJECT: NRC INSPECTION REPORT NO. 05000134/2013001, WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MASSACHUSETTS SITE

Dear Mr. Curley:

On August 22, 2013, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety inspection at the Worcester Polytechnic Institute (WPI) Leslie C. Wilbur Nuclear Reactor Facility

in Worcester, Massachusetts. The inspection was an examination of your licensed activities as

they relate to radiation safety and to compliance with the Commission's regulations and the

license conditions. The inspection consisted of observations by the inspectors, interviews with WPI and contractor personnel, a review of procedures and records, and acquisition of split samples. The NRC contracted with Oak Ridge Associated Universities (ORAU) to perform

analysis of samples obtained by the inspectors. ORAU provided the results of the sample

analysis in a report, "Letter Report for Analytical Results for Two Concrete and Three Soil

Samples Associated with the Worcester Polytechnic Institute, in Worcester, Massachusetts,"

dated October 7, 2013, (Agencywide Document Access and Management System (ADAMS) Accession No. ML13309B020). Additional inform

ation in documents provided by WPI dated August 22, August 26, October 29, and December 6, 2013, were also examined as part of the

inspection. On January 16, 2014, the inspectors held a telephone conference call exit with you

and other members of your staff. The enclosed report presents the results of this inspection.

No health and safety concerns were identified.

The enclosed inspection report will be provided to the NRC Division of Waste Management and Environmental Protection (DWMEP) Project Manager for WPI for consideration for action on any request to terminate the WPI license and release the site for unrestricted use. Please note that

this report does not release the site for unrestricted use nor does it terminate the license.

Current NRC regulations and guidance are included on the NRC's website at

www.nrc.gov

select Nuclear Materials; Med, Ind, & Academic Uses;

then Regulations, Guidance and

Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov

select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents;

then Enforcement Policy (Under 'Related Information').

You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday

(except Federal holidays).

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713

M. Curley 2

No reply to this letter is required. Please contact Mark C. Roberts at (610) 337-5094 if you have any questions regarding this matter.

Sincerely,

Original signed by Marc S. Ferdas

Marc S. Ferdas, Chief Decommissioning and Technical

Support Branch

Division of Nuclear Materials Safety

Enclosure: Inspection Report No. 05000134/2013001

cc: Commonwealth of Massachusetts

M. Curley 2

No reply to this letter is required. Please contact Mark C. Roberts at (610) 337-5094 if you have any questions regarding this matter.

Sincerely,

Original signed by Marc S. Ferdas

Marc S. Ferdas, Chief Decommissioning and Technical

Support Branch

Division of Nuclear Materials Safety

Enclosure: Inspection Report No. 05000134/2013001

cc: Commonwealth of Massachusetts

DISTRIBUTION

T. Smith, FSME, DWMEP

DOCUMENT NAME: G:\WordDocs\Current\Insp Letter\

L00-00000-61.

2013001.doc

ML14037A365 SUNSI Review Complete:

MRoberts

After declaring this document

AAn Official Agency Record

@ it will be released to the Public.

To receive a copy of this document, indicate in the box:

A C@ = Copy w/o attach/encl

A E@ = Copy w/ attach/encl

A N@ = No copy

OFFICE DNMS/RI

N DNMS/RI DNMS/RI E

NAME KModes\mcr f\ MRoberts\mcr MFerdas\msf

DATE 1/31/14 2/6/14 2/6/14

OFFICIAL RECORD COPY