ML13046A106

From kanterella
Jump to navigation Jump to search
Worcester Polytechnic Institute Reactor, Final Status Survey Plan
ML13046A106
Person / Time
Site: 05000134
Issue date: 01/18/2013
From: Curley M
Worcester Polytechnic Institute
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
Download: ML13046A106 (1)


Text

100 Institute Road Worcester, MA 01609-2280, USA 508-831-5754, Fax 508-831-5064 www.wpi.edu Financial Services January 18, 2013 Attn: Document Control Desk Mail Stop 0-5 C12 Washington, DC 20555-0001 Re: Worcester Polytechnic Institute Reactor, USNRC license R-61, Docket 50-134; Final Status Survey Plan

Dear Sir:

The enclosed Final Status Survey (FSS) Plan (hard copy) fulfills WPI's commitment to develop and submit a FSS Plan for NRC approval, as described in "Proposed Final Status Survey Plan" (Chapter 4.0) of the September 2009 Decommissioning Plan. This Plan has been prepared using project-specific information, relative to post-remediation facility conditions and known characteristics of potential residual radiological contaminants.

Further, this FSS plan was prepared using the guidelines and recommendation presented in NUREG-1757, Consolidated NMSS Decommissioning Guidance, and NUREG-1575, Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).

If you have any technical questions or comments regarding the FSS Plan, or require an electronic version of the plan, please contact Jay Adler at TLG Services, Inc., at 860--355-2300 or (adler@tlgservices.com).

I certify under penalty of perjury that the foregoing is true and correct to the best of our knowledge. Executed on January 18, 2013.

Sincerely, Reactor Director University Compliance Officer Finance and Operations Worcester Polytechnic institute