ML17201Q528: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 05/23/2017 | | issue date = 05/23/2017 | ||
| title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1 | | title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1 | ||
| author name = Seymour J | | author name = Seymour J | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = |
Revision as of 10:21, 19 June 2019
ML17201Q528 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/23/2017 |
From: | Jesse Seymour Operations Branch III |
To: | Point Beach |
Shared Package | |
ML16319A342 | List: |
References | |
Download: ML17201Q528 (4) | |
Text
ES-301 Transient and Event Checklist
- Group 1 Form ES-301-5 Facility: Date of Exam: May 8
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T T Y P
E Scenarios 2 3 4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I SRO-U SRO-U 1 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 3, 4, 5 3 4 4 2 MAJ 6 1 2 2 1 TS 3, 4, 5 3 0 2 2 RO SRO-I SRO-U SRO-I 1 RX 2 3 2 3 1 1 0 NOR 1 1 1 1 1 I/C 3, 4, 5 1, 2, 4 3, 5 8 4 4 2 MAJ 6 5, 7 6 4 2 2 1 TS 3, 4 1, 3, 4 5 0 2 2 RO SRO-I SRO-U RO 1 RX 2 1 1 1 0 NOR 3 1, 2 3 1 1 1 I/C 5, 7 1, 2, 4 4, 7 7 4 4 2 MAJ 6 5, 7 6 4 2 2 1 TS 0 0 2 2 RO SRO-I SRO-U RO 2 RX 3 1 1 1 0 NOR 1, 2 2 1 1 1 I/C 3, 4, 8 6, 8 5 4 4 2 MAJ 6 5, 7 3 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
ES-301 Transient and Event Checklist
- Group 2 Form ES-301-5 Facility: Date of Exam: May 8
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T T Y P
E Scenarios 1 2 4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I SRO-U SRO-U 2 RX 0 1 1 0 NOR 4 1 1 1 1 I/C 1, 2, 5 3 4 4 2 MAJ 6 1 2 2 1 TS 1, 3 2 0 2 2 RO SRO-I SRO-U SRO-I 2 RX 2 2 2 1 1 0 NOR 1 1 1 1 1 I/C 5, 7 3, 4, 5 5 4 4 2 MAJ 6 6 2 2 2 1 TS 3, 4, 5 3 0 2 2 RO SRO-I SRO-U SRO-I 3 RX 2 1 1 1 0 NOR 4 1 2 1 1 1 I/C 1 , 2, 7, 8 3, 4, 5 3, 5 9 4 4 2 MAJ 6 6 6 3 2 2 1 TS 3, 4 2 0 2 2 RO SRO-I SRO-U RO 3 RX 4 1 1 1 0 NOR 1, 2 1, 2 4 1 1 1 I/C 5 3, 4, 8 4, 7 6 4 4 2 MAJ 6 6 6 3 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change
ES-301 Transient and Event Checklist
- Group 3 Form ES-301-5 Facility: Date of Exam: May 8
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T T Y P
E Scenarios 1 3 4 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I SRO-U SRO-I 5 RX 4 2 2 1 1 0 NOR 3 1 2 1 1 1 I/C 5 1, 2, 4 3, 4, 5 7 4 4 2 MAJ 6 5, 7 6 4 2 2 1 TS 3, 4, 5 3 0 2 2 RO SRO-I SRO-U SRO-I 6 RX 3 2 2 1 1 0 NOR 4 1 1 1 1 I/C 1 , 2, 7, 8 1, 2, 4 3, 5 9 4 4 2 MAJ 6 5, 7 6 4 2 2 1 TS 1, 3, 4 3 0 2 2 RO SRO-I SRO-U SRO-I 7 RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 I/C 1, 2, 5 6, 8 4, 7 7 4 4 2 MAJ 6 5, 7 6 4 2 2 1 TS 1, 3 2 0 2 2 RO SRO-I SRO-U RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
ES-301 Transient and Event Checklist
- Group 4 Form ES-301-5 Facility: Date of Exam: May 8
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T T Y P
E Scenarios 2 3 T O T A L M I N I M U M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I SRO-U SRO-U 3 RX 3 1 1 1 0 NOR 1, 2 2 1 1 1 I/C 3, 4 , 8 1, 2, 4 6 4 4 2 MAJ 6 5, 7 3 2 2 1 TS 1, 3, 4 3 0 2 2 RO SRO-I SRO-U SRO-I 4 RX 2 3 2 1 1 0 NOR 1 1 1 1 1 I/C 3, 4, 5 6, 8 5 4 4 2 MAJ 6 5, 7 3 2 2 1 TS 3, 4 2 0 2 2 RO SRO-I SRO-U RO 4 RX 2 1 1 1 0 NOR 3 1 1 1 1 I/C 5, 7 1, 2, 4 5 4 4 2 MAJ 6 5, 7 3 2 2 1 TS 0 0 2 2 RO SRO-I SRO-U RX 1 1 0 NOR 1 1 1 I/C 4 4 2 MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.