ML17201Q531

From kanterella
Jump to navigation Jump to search
2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-1
ML17201Q531
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Jesse Seymour
Operations Branch III
To:
Point Beach
Shared Package
ML16319A342 List:
References
Download: ML17201Q531 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach U1/U2 Date of Examination: May 2017 Examination Level: RO SRO Operating Test Number: 2017 Administrative Topic Type Describe activity to be performed (see Note) Code*

Perform an RCS Leak Rate Determination 2.1.20 (4.6/4.6) Ability to interpret and execute procedure Conduct of Operations R steps.

D 2.1.23 (4.3/4.4) Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Perform TS-32 Miscellaneous Equipment Conduct of Operations S Checks (Monthly) Unit 1 (Subcooling Margin Monitor)

D 2.1.19 (3.9/3.8) Ability to use plant computers to evaluate system or component status.

Perform Atmospheric Steam Dump Valve Equipment Control S Train B Unit 1 (IT 90 Unit 1)

N 2.2.12 (3.7/4.1) Knowledge of surveillance procedures.

Radiation Control Not Selected Activate ERDS S

2.4.39 (3.9/3.8) Knowledge of RO responsibilities in Emergency Plan D emergency plan implementation.

P 2015 NRC Exam NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach U1/U2 Date of Examination: May 2017 Examination Level: RO SRO Operating Test Number: 2017 Administrative Topic Type Describe activity to be performed (see Note) Code*

Review an RCS Leak Rate Determination R 2.1.7 (4.4/4.7) Ability to evaluate plant performance and Conduct of Operations S make operational judgment based on operating N characteristics, reactor behavior and instrument interpretations.

Complete a Calculation Review TS-32 R Attachment B (Subcooling Margin Monitor checks)

Conduct of Operations S 2.1.25 (3.9/4.2) Ability to interpret reference materials, such D as graphs, curves, tables, etc.

R Review Atmospheric Steam Dump Valve Train Equipment Control S B Unit 1 (IT 90 Unit 1)

N 2.2.12 (3.7/4.1) Knowledge of surveillance procedures.

R Review a Discharge Calculation Radiation Control S (OI-140B)

N 2.3.6 (2.0/3.8) Ability to approve release permits.

Perform Required Notifications R

S 2.4.29 (3.1/4.4) Knowledge of the emergency plan.

Emergency Plan 2.4.40 (2.7/4.5) Knowledge of SRO responsibilities in D emergency plan implementation.

P 2015 NRC Exam NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)