|
---|
Category:License-Operator
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 2024-07-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 2024-07-11
[Table view] |
Text
ES-301 Transient and Event Checklist - Group 1 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-U 1 RO RX 2 3 2 3 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 1, 2, 4 3, 5 8 4 4 2 SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 3, 4 1, 3, 4 5 0 2 2 SRO-I 1 RO RX 2 1 1 1 0 NOR 3 1, 2 3 1 1 1 SRO-I 5, 7 1, 2, 4, 7 I/C 7 4 4 2 4
SRO-U 6 5, 7 6 MAJ 4 2 2 1 TS 0 0 2 2 RO 1 RO RX 3 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I 3, 4, 6, 8 I/C 5 4 4 2 8
SRO-U 6 5, 7 MAJ 3 2 2 1 TS 0 0 2 2 RO 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 2 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 1 2 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 0 1 1 0 NOR 4 1 1 1 1 SRO-I I/C 1, 2, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 1, 3 2 0 2 2 SRO-U 2 RO RX 2 2 2 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 5, 7 3, 4, 5 5 4 4 2 SRO-U MAJ 6 6 2 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 2 RO RX 2 1 1 1 0 NOR 4 1 2 1 1 1 SRO-I I/C 1, 2, 7, 8 3, 4, 5 3, 5 9 4 4 2 SRO-U 6 6 6 MAJ 3 2 2 1 TS 3, 4 2 0 2 2 SRO-I 3 RO RX 4 1 1 1 0 NOR 1, 2 1, 2 4 1 1 1 SRO-I 5 3, 4, 4, 7 I/C 6 4 4 2 8
SRO-U 6 6 6 MAJ 3 2 2 1 TS 0 0 2 2 RO 3 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change
ES-301 Transient and Event Checklist - Group 3 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 1 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 4 2 2 1 1 0 NOR 3 1 2 1 1 1 SRO-I I/C 5 1, 2, 3, 4, 5 7 4 4 2 4
SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 5 RO RX 3 2 2 1 1 0 NOR 4 1 1 1 1 SRO-I I/C 1, 2, 1, 2, 4 3, 5 9 4 4 2 7, 8 SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 6 RO RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 1, 2, 5 6, 8 4, 7 7 4 4 2
SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 1, 3 2 0 2 2 SRO-I 7 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 4 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 2 3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 3 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 3, 4, 1, 2, 4 6 4 4 2 8
SRO-U MAJ 6 5, 7 3 2 2 1 1, 3, 4 SRO-U 3 TS 3 0 2 2 RO RX 2 3 2 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 6, 8 5 4 4 2 SRO-U MAJ 6 5, 7 3 2 2 1 TS 3, 4 2 0 2 2 SRO-I 4 RO RX 2 1 1 1 0 NOR 3 1 1 1 1 SRO-I 5, 7 1, 2, I/C 5 4 4 2 4
SRO-U 6 5, 7 MAJ 3 2 2 1 TS 0 0 2 2 RO 4 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.