ML13248A111: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


Admin-130  Perform Manual RCS Leakage Calculation and TS Determination (SRO Only)
Admin-130  Perform Manual RCS Leakage Calculation and TS Determination (SRO Only)
CANDIDATE EXAMINER Admin-130 2.1S Page 2 of 12  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Perform Manual RCS Leakage Calculation and T S Determination Alternate Path:
CANDIDATE     EXAMINER Admin-130 2.1S Page 2 of 12  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Perform Manual RCS Leakage Calculation and T S Determination Alternate Path:


N/A  Facility JPM #:
N/A  Facility JPM #:
Line 27: Line 27:
TS 3.4.13 Condition B entered. Preferred Evaluation Location:
TS 3.4.13 Condition B entered. Preferred Evaluation Location:
Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator _____ In-Plant __ ___ Classroom __X___  Perform __X___ Simulate
Simulator _____ In-Plant __ ___ Classroom __X___  Perform __X___ Simulate __ __   
__ __   


==References:==
==References:==


PT/O/A/0600/001A (Loss Of Computer
PT/O/A/0600/001A (Loss Of Computer
) PT/1/A/0600/010 (Reactor Coolant Leakage
) PT/1/A/0 600/010 (Reactor Coolant Leakage
) TS 3.4.13 (RCS Operational LEAKAGE
) TS 3.4.13 (RCS Operational LEAKAGE
)  Validation Time:
)  Validation Time:
Line 44: Line 43:
SAT ______ UNSAT ______
SAT ______ UNSAT ______
Performance Time ___________
Performance Time ___________
Examiner:
Examiner: ______________________________          ____________________________________/_________    NAME      SIGNATURE                            DATE
______________________________          ____________________________________/_________    NAME      SIGNATURE                            DATE
  =====================================================================================
  =====================================================================================
COMMENTS Admin-130 2.1S Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-130 2.1S Page 4 of 12 Tools/Equipment/Procedures Needed:
COMMENTS Admin-130 2.1S Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-130 2.1S Page 4 of 12 Tools/Equipment/Procedures Needed:
PT/1/A/0600/010 (Reactor Coolant Leakage)
PT/1/A/0600/0 10 (Reactor Coolant Leakage)
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)
Technical Specifications  
Technical Specifications  
Line 60: Line 58:
INITIATING CUES
INITIATING CUES


The OSM directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage)
The OSM directs you to perform a manual RCS leakage calculation per PT/1 A/0 600/0 10 (Reactor Coolant Leakage)
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.


Evaluate leakage and determine if a ny Tech Spec Conditions that apply. Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 75.2 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Evaluate leakage and determine if a ny Tech S pec Conditions that apply. Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 7 5.2 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%
Admin-130 2.1S Page 5 of 12  START TIME: _______
Admin-130 2.1S Page 5 of 12  START TIME: _______
STEP 1: Step 2.1 Record Initial Data in "Table #1".
STEP 1: Step 2.1 Record Initial Data in "Table #1".
____Sat  ____Unsat Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches -  =  RCS Temp 579.0°F -  =  QT Level 86.5 inches -  =  LDST Level 76.7 inches -  =  Rx Power 100.0% -  =  RCS Press 2150 psig -  =  CR Pos 92.7% -  =  STANDARD: Candidate enters initial set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.
____Sat  ____Unsat     Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches -  =  RCS Temp 579.0°F -  =  QT Level 86.5 inches -  =  LDST Level 76.7 inches -  =  Rx Power 100.0% -  =  RCS Press 2150 psig -  =  CR Pos 92.7% -  =  STANDARD: Candidate enters initial set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________
STANDARD: Candidate enters 0015 (from initiating cue)
STANDARD: Candidate enters 0015 (from initiating cue)
COMMENTS
COMMENTS
____Sat  ____Unsat
____Sat  ____Unsat Admin-130 2.1S Page 6 of 12  STEP 3: Step 2.3 After 1 hour, record Final Data in "Table
 
  #1". ____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
Admin-130 2.1S Page 6 of 12  STEP 3: Step 2.3 After 1 hour, record Final Data in "Table
  #1". ____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
  - 219.5 inches
  - 219.5 inches
  =  RCS Temp 579.0°F - 579.1°F =  QT Level 86.5 inches - 86.5 inches =  LDST Level 76.7 inches - 75.2 inches =  Rx Power 100.0% - 100.1% =  RCS Press 2150 psig
  =  RCS Temp 579.0°F - 579.1°F =  QT Level 86.5 inches - 86.5 inches =  LDST Level 76.7 inches - 7 5.2 inches =  Rx Power 100.0% - 100.1% =  RCS Press 2150 psig - 2150 psig =  CR Pos 92.7% - 92.7% =  STANDARD: Candidate enters final set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)
- 2150 psig
COMMENTS    STEP 4: Step 2.4 Record time Fi n al Data recorded: ____________
=  CR Pos 92.7% - 92.7% =  STANDARD: Candidate enters final set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)
STANDARD: Candidate enters 0115 COMMENTS    ____Sat  ____Unsat STEP 5: Step 2.5 Record time elapsed time: ____________ minutes STANDARD: Candidate enters 60 minutes COMMENTS    CRITICAL STEP
COMMENTS    STEP 4: Step 2.4 Record time Final Data recorded: ____________
____Sat  ____Unsat Admin-130 2.1S Page 7 of 12  STEP 6: Step 2.6 Calculate and record "Change" values in "Table # 1"..
STANDARD: Candidate enters 0115 COMMENTS    ____Sat  ____Unsat STEP 5: Step 2.5 Record time elapsed time: ____________ minutes STANDARD: Candidate enters 60 minutes COMMENTS    CRITICAL STEP
____Sat  ____Unsat
 
Admin-130 2.1S Page 7 of 12  STEP 6: Step 2.6 Calculate and record "Change" values in "Table # 1"..
CRITICAL STEP
CRITICAL STEP


____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
  - 219.5 inches
  - 219.5 inches
  = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 75.2 inches = +1.5 inches Rx Power 100.0% - 100.1% = -.1% RCS Press 2150 psig
  = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 7 5.2 inches = +1.5 inches Rx Power 100.0% - 100.1% = -.1% RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0 %  STANDARD: Candidate calculates the change in data and fills in Table 1 change column. COMMENTS    STEP :7 Step 2.7 Calculate Corrected Pzr Level Change:
- 2150 psig
= 0 psig CR Pos 92.7% - 92.7% = 0 %  STANDARD: Candidate calculates the change in data and fills in Table 1 change column. COMMENTS    STEP :7 Step 2.7 Calculate Corrected Pzr Level Change:
STANDARD: -0.5 inches - (6.831 inches/°F X  
STANDARD: -0.5 inches - (6.831 inches/°F X  
-.1°F) = +.1831 inches
-.1°F) = +.1831 inches
         (+.18 to +.2)  COMMENTS CRITICAL STEP
         (+.18 to +.2)  COMMENTS CRITICAL STEP
____Sat  ____Unsat STEP :8 Step 2.8 Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch =  
____Sat  ____Unsat STEP :8 Step 2.8 Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch =  
+2.63 gallons  (+.18 to +.2)    ( 2.585 to 2.873)  COMMENTS    CRITICAL STEP
+2.63 gallons  (+.18 to +.2)    ( 2.585 to 2.873)  COMMENTS    CRITICAL STEP
____Sat  ____Unsat
____Sat  ____Unsat Admin-130 2.1S Page 8 of 12  STEP :9 Step 2.9 Convert QT Level Change to gallons:
 
Admin-130 2.1S Page 8 of 12  STEP :9 Step 2.9 Convert QT Level Change to gallons:
STANDARD: No change COMMENTS    CRITICAL STEP
STANDARD: No change COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +1.5 inches X 30.956 gallons / inch =  
____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +1.5 inches X 30.956 gallons / inch =  
+46.434 gallons              (+46.4 to +46.5)  COMMENTS    CRITICAL STEP
+46.434 gallons              (+46.4 to +46.5)  COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 46.434 gallons = 49.064 gallons  ( 2.585 to 2.873)    (+46.4 to +46.5) (48.98 to 49.37)  COMMENTS    CRITICAL STEP
____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 46.434 gallons = 49.064 gallons  ( 2.585 to 2.873)    (+46.4 to +46.5) (48.98 to 49.37)  COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 49.064 gallons / 60 minutes = .818 gpm  (48.98 to 49.37)  (.816 to .823)  COMMENTS    CRITICAL STEP
____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 49.064 gallons / 60 minutes = .818 gpm  (48.98 to 49.37)  (.816 to .823)  COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat
____Unsat Admin-130 2.1S Page 9 of 12  STEP :13 Refer to TS 3.4.13 RCS Operational LEAKAGE STANDARD: Candidate determines that the Tech Spec limit for Unidentified Leakage is 1 gpm therefore entry into the Actions Table is NOT required
 
Admin-130 2.1S Page 9 of 12  STEP :13 Refer to TS 3.4.13 RCS Operational LEAKAGE STANDARD: Candidate determines that the Tech Spec limit for Unidentified Leakage is 1 gpm therefore entry into the Actions Table is NOT required
. COMMENTS      ____Sat
. COMMENTS      ____Sat
____Unsat STEP :14 Refer to TS 3.4.13 RCS Operational LEAKAGE EXAMINER CUE:  Hand the candidate Cue sheet #2 STANDARD:  NOTE:  After second cue sheet handed to candidate, he/she determines the leakage is pressure boundary leakage (see below)
____Unsat STEP :1 4 Refer to TS 3.4.13 RCS Operational LEAKAGE EXAMINER CUE:  Hand the candidate Cue sheet #2 STANDARD:  NOTE:  After second cue sheet handed to candidate, he/she determines the leakage is pressure boundary leakage (see below)
Pressure Boundary: Determine that leakage exceeds the 0 gpm Pressure Boundary leakage limit and TS 3.4.13 Condition B applies. This required Mode 3 in 12 hours and Mode 5 in 36 hours.
Pressure Boundary: Determine that leakage exceeds the 0 gpm Pressure Boundary leakage limit and TS 3.4.13 Condition B applies. This required Mode 3 in 12 hours and Mode 5 in 36 hours.
COMMENTS  END TASK CRITICAL STEP
COMMENTS  END TASK CRITICAL STEP
____Sat  ____Unsat STOP TIME: ____________
____Sat  ____Unsat   STOP TIME: ____________


Admin-130 2.1S Page 10 of 12  CRITICAL STEP EXPLANATIONS STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate.
Admin-130 2.1S Page 10 of 12  CRITICAL STEP EXPLANATIONS STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate.
Line 124: Line 110:
11 Necessary data calculation to properly determine manual RCS leakage rate.
11 Necessary data calculation to properly determine manual RCS leakage rate.
12 Necessary data calculation to properly determine manual RCS leakage rate.
12 Necessary data calculation to properly determine manual RCS leakage rate.
13 Necessary to refer to correct TS and conclude limits are not exceeded. 14 Necessary to refer to correct TS and conclude limits are exceeded
13 Necessary to refer to correct TS and conclude limits are not exceeded. 1 4 Necessary to refer to correct TS and conclude limits are exceeded
.
.
1.1S  CANDIDATE CUE SHEET
1.1S  CANDIDATE CUE SHEET
Line 134: Line 120:


Evaluate leakage and determine if any Tech Spec Conditions that apply.
Evaluate leakage and determine if any Tech Spec Conditions that apply.
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 75.2 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 7 5.2 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%
1.1S  CANDIDATE CUE SHEET #2 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)    INITIATING CUES Since completing the RCS Manual Leakage calculation, the RCS leak rate has increased to 2.17 gpm and the location of the leak has been determined to be the weld that connects the 1A1 HPI injection nozzle to the RCS piping.
1.1S  CANDIDATE CUE SHEET #2 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)    INITIATING CUES Since completing the RCS Manual Leakage calculation, the RCS leak rate has increased to 2.17 gpm and the location of the leak has been determined to be the weld that connects the 1A1 HPI injection nozzle to the RCS piping.
Indicate below what (if any) Tech Spec Conditions, Required Actions, and Completion Times that apply.
Indicate below what (if any) Tech Spec Conditions, Required Actions, and Completion Times that apply.
Line 140: Line 126:
Admin-131 1.1R Page 1 of 10    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
Admin-131 1.1R Page 1 of 10    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


Admin-131  Perform Manual RCS Leakage Calculation (RO Only)
Admin-131  Perform Manual RCS Leakage Calculation (RO Only)        


CANDIDATE EXAMINER   
CANDIDATE     EXAMINER   


Admin-131 1.1R Page 2 of 10  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Perform Manual RCS Leakage Calculation Alternate Path:
Admin-131 1.1R Page 2 of 10  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Perform Manual RCS Leakage Calculation Alternate Path:
Line 152: Line 138:
Preferred Evaluation Location:
Preferred Evaluation Location:
Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator _____ In-Plant __ ___ Classroom __X___  Perform __X___ Simulate
Simulator _____ In-Plant __ ___ Classroom __X___  Perform __X___ Simulate __ __   
__ __   


==References:==
==References:==


PT/O/A/0600/001A (Loss Of Computer
PT/O/A/0600/001A (Loss Of Computer
) PT/1/A/0600/010 (Reactor Coolant Leakage
) PT/1/A/0 600/010 (Reactor Coolant Leakage
)  Validation Time:
)  Validation Time:
18 minutes Time Critical:
18 minutes Time Critical: NO =====================================================================================
NO =====================================================================================
Candidate:
Candidate:
_______________________________________
_______________________________________
Line 168: Line 152:
SAT ______ UNSAT ______
SAT ______ UNSAT ______
Performance Time ___________
Performance Time ___________
Examiner:
Examiner: ______________________________          ____________________________________/___
______________________________          ____________________________________/___
______    NAME      SIGNATURE                            DATE
______    NAME      SIGNATURE                            DATE
  =====================================================================================
  =====================================================================================
COMMENTS Admin-131 1.1R Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-131 1.1R Page 4 of 10 Tools/Equipment/Procedures Needed PT/1/A/0600/010 (Reactor Coolant Leakage)
COMMENTS Admin-131 1.1R Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-131 1.1R Page 4 of 10 Tools/Equipment/Procedures Needed PT/1/A/0600/0 10 (Reactor Coolant Leakage)
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)


Line 183: Line 166:
INITIATING CUES
INITIATING CUES


The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage)
The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1 A/0 600/010 (Reactor Coolant Leakage)
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.


Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%
Admin-131 1.1R Page 5 of 10  START TIME: _______
Admin-131 1.1R Page 5 of 10  START TIME: _______
STEP 1: Step 2.1 Record Initial Data in "Table #1".
STEP 1: Step 2.1 Record Initial Data in "Table #1".
____Sat  ____Unsat Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches -  =  RCS Temp 579.0°F -  =  QT Level 86.5 inches -  =  LDST Level 76.7 inches -  =  Rx Power 100.0% -  =  RCS Press 2150 psig -  =  CR Pos 92.7% -  =  STANDARD: Student enters initial set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.
____Sat  ____Unsat     Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches -  =  RCS Temp 579.0°F -  =  QT Level 86.5 inches -  =  LDST Level 76.7 inches -  =  Rx Power 100.0% -  =  RCS Press 2150 psig -  =  CR Pos 92.7% -  =  STANDARD: Student enters initial set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________
COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________
STANDARD: Student enters 0015 (from initiating cue)
STANDARD: Student enters 0015 (from initiating cue)
COMMENTS
COMMENTS
____Sat  ____Unsat
____Sat  ____Unsat Admin-131 1.1R Page 6 of 10  STEP 3: Step 2.3 After 1 hour, record Final Data in "Table #1".
 
____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
Admin-131 1.1R Page 6 of 10  STEP 3: Step 2.3 After 1 hour, record Final Data in "Table #1".
____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
  - 219.5 inches
  - 219.5 inches
  =  RCS Temp 579.0°F - 579.1°F =  QT Level 86.5 inches - 86.5 inches =  LDST Level 76.7 inches - 74.0 inches
  =  RCS Temp 579.0°F - 579.1°F =  QT Level 86.5 inches - 86.5 inches =  LDST Level 76.7 inches - 74.0 inches
  =  Rx Power 100.0% - 100.1% =  RCS Press 2150 psig
  =  Rx Power 100.0% - 100.1% =  RCS Press 2150 psig - 2150 psig =  CR Pos 92.7% - 92.7% =  STANDARD: Student enters final set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)
- 2150 psig
COMMENTS    STEP 4: Step 2.4 Record time Fi n al Data recorded: ____________
=  CR Pos 92.7% - 92.7% =  STANDARD: Student enters final set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)
COMMENTS    STEP 4: Step 2.4 Record time Fi nal Data recorded: ____________
STANDARD: Student enters 0115 COMMENTS
STANDARD: Student enters 0115 COMMENTS
____Sat  ____Unsat STEP 5: Step 2.5 Record time elapsed time: ____________ minutes STANDARD: Student enters 60 minutes COMMENTS    CRITICAL STEP
____Sat  ____Unsat STEP 5: Step 2.5 Record time elapsed time: ____________ minutes STANDARD: Student enters 60 minutes COMMENTS    CRITICAL STEP
____Sat  ____Unsat
____Sat  ____Unsat Admin-131 1.1R Page 7 of 10  STEP 6: Step 2.6 Calculate and record "Change" values in "Table # 1"..
 
Admin-131 1.1R Page 7 of 10  STEP 6: Step 2.6 Calculate and record "Change" values in "Table # 1"..
CRITICAL STEP
CRITICAL STEP


____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
____Sat  ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches
  - 219.5 inches
  - 219.5 inches
  = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches
  = -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches
  - 74.0 inches
  - 74.0 inches
  = +2.7 inches Rx Power 100.0% - 100.1% = -.1% RCS Press 2150 psig
  = +2.7 inches Rx Power 100.0% - 100.1% = -.1% RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0 %  STANDARD: Student calculates the change in data and fills in Table 1 change column.
- 2150 psig
= 0 psig CR Pos 92.7% - 92.7% = 0 %  STANDARD: Student calculates the change in data and fills in Table 1 change column.
COMMENTS    STEP :7 Step 2.7 Calculate Corrected Pzr Level Change:
COMMENTS    STEP :7 Step 2.7 Calculate Corrected Pzr Level Change:
STANDARD: -0.5 inches - (6.831 inches/°F X  
STANDARD: -0.5 inches - (6.831 inches/°F X  
Line 222: Line 197:
       (+.18 to +.2)  COMMENTS CRITICAL STEP
       (+.18 to +.2)  COMMENTS CRITICAL STEP
____Sat
____Sat
____Unsat STEP :8 Step 2.8 Convert Corrected Pzr Level Change to gallons STANDARD:  +.1831 inches X 14.364 gallons / inch = +2.63 gallons  (+.18 to +.2)    ( 2.585 to 2.873)  COMMENTS    CRITICAL STEP
____Unsat STEP :8 Step 2.8 Convert Corrected Pzr Level Change to gallons STANDARD:  +.1831 inches X 14.364 gallons / inch = +2.63 gallons  (+.18 to +.2)    ( 2.585 to 2.873)  COMMENTS    CRITICAL STEP
____Sat  ____Unsat
____Sat  ____Unsat Admin-131 1.1R Page 8 of 10  STEP :9 Step 2.9 Convert QT Level Change to gallons:
 
Admin-131 1.1R Page 8 of 10  STEP :9 Step 2.9 Convert QT Level Change to gallons:
STANDARD: No change COMMENTS    CRITICAL STEP
STANDARD: No change COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +2.7 inches X 30.956 gallons / inch = +83.5812 gallons
____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +2.7 inches X 30.956 gallons / inch = +83.5812 gallons
               (+83.5 to +83.6)
               (+83.5 to +83.6)
COMMENTS    CRITICAL STEP
COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 83.5812 gallons =
____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 83.5812 gallons =
86.2112 gallons  (2.585 to 2.873)    (+83.5 to +83.6)
8 6.2112 gallons  (2.585 to 2.873)    (+83.5 to +83.6)
  (86.08 to 86.47) COMMENTS    CRITICAL STEP
  (86.08 to 86.47) COMMENTS    CRITICAL STEP
____Sat
____Sat
____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 86.2112 gallons / 60 minutes =
____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 86.2112 gallons / 60 minutes =
1.437 gpm  (86.08 to 86.47
1.437 gpm  (86.08 to 86.47
)  (1.434 to 1.441)  COMMENTS    END TASK CRITICAL STEP
)  (1.434 to 1.44 1)  COMMENTS    END TASK CRITICAL STEP
____Sat
____Sat
____Unsat STOP TIME: ____________
____Unsat   STOP TIME: ____________


Admin-131 1.1R Page 9 of 10  CRITICAL STEP EXPLANATIONS:
Admin-131 1.1R Page 9 of 10  CRITICAL STEP EXPLANATIONS:
Line 258: Line 231:
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.
Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.


Manual RCS Leakage Data  Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 86.5 inches 86.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 92.7% 92.7%
Manual RCS Leakage Data  Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%
Admin-142 - 1.2B Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
Admin-142 - 1.2B Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


Admin-142  Determine Time for SFP to reach 180
Admin-142  Determine Time for SFP to reach 180
ºF CANDIDATE EXAMINER Admin-142 - 1.2B Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Determine Time for SFP to reach 180ºF  Alternate Path:
ºF CANDIDATE     EXAMINER Admin-142 - 1.2B Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Determine Time for SFP to reach 180ºF  Alternate Path:
N/A  Facility JPM #:
N/A  Facility JPM #:
New  K/A Rating(s):  
New  K/A Rating(s):  
Line 273: Line 246:
Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator _____ In-Plant _____ Classroom
Simulator _____ In-Plant _____ Classroom
__ X ___  Perform __X___ Simulate
__ X ___  Perform __X___ Simulate ____   
____   


==References:==
==References:==
Line 289: Line 261:
Performance Time
Performance Time
: _________
: _________
Examiner:
Examiner: ______________________________          ____________________________________/________
______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
NAME      SIGNATURE                            DATE
  ====================================================================================
  ====================================================================================
Line 315: Line 286:
___ SAT   
___ SAT   


___ UNSAT
___ UNSAT Admin-142 - 1.2B Page 6 of 9  STEP 2:  Determine the Time (in days) row based on direction from page 5 of 63 STANDARD:  Candidate selects the lower EFPD unit and adds 20 which results in 67 days. Determine that 67 days is between 60 and 70 days on the far left column of Table 10 Based on guidance in Step 7 on Page 7 of 63, elects to use 60 days (the shorter time).
 
Admin-142 - 1.2B Page 6 of 9  STEP 2:  Determine the Time (in days) row based on direction from page 5 of 63 STANDARD:  Candidate selects the lower EFPD unit and adds 20 which results in 67 days. Determine that 67 days is between 60 and 70 days on the far left column of Table 10 Based on guidance in Step 7 on Page 7 of 63, elects to use 60 days (the shorter time).


Note: Step 2 and Step 3 can be performed in any order COMMENTS:     
Note: Step 2 and Step 3 can be performed in any order COMMENTS:     
Line 325: Line 294:
___ SAT   
___ SAT   


___ UNSAT STEP 3:  Determine initial Spent Fuel Pool Temperature column based on directions from page 7 of 63 Step 6
___ UNSAT   STEP 3:  Determine initial Spent Fuel Pool Temperature column based on directions from page 7 of 63 Step 6
. STANDARD:  Actual SFP temp = 102
. STANDARD:  Actual SFP temp = 102
ºF  Temperature columns available are 100 and 105 Based on directions in step 6, elects to use the 105 (higher) column Note: Step 2 and Step 3 can be performed in any order COMMENTS:
ºF  Temperature columns available are 100 and 105 Based on directions in step 6, elects to use the 105 (higher) column Note: Step 2 and Step 3 can be performed in any order COMMENTS:
Line 331: Line 300:
___ SAT   
___ SAT   


___ UNSAT
___ UNSAT Admin-142 - 1.2B Page 7 of 9  STEP 4:  Find the Time in hours based on the intersection of the 60 day row and the 105 degree column.
 
STANDARD: Based on the intersection of the 60 day row and the 105 degree column, determine that 16.4 hours is the time to reach 180ºF  COMMENTS:    END TASK  CRITICAL STEP
Admin-142 - 1.2B Page 7 of 9  STEP 4:  Find the Time in hours based on the intersection of the 60 day row and the 105 degree column.
STANDARD: Based on the intersection of the 60 day row and the 105 degree column, determine that 16.4 hours is the time to reach 180
ºF  COMMENTS:    END TASK  CRITICAL STEP


___ SAT   
___ SAT   


___ UNSAT
___ UNSAT STOP TIME: ____________
 
STOP TIME: ____________


Admin-142 - 1.2B Page 8 of 9  CRITICAL STEP EXPLANATIONS:
Admin-142 - 1.2B Page 8 of 9  CRITICAL STEP EXPLANATIONS:
Line 359: Line 323:
Admin-240 2R Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
Admin-240 2R Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


Admin-240 Perform SG Downcomer Temperature Surveillance
Admin-2 40 Perform SG Downcomer Temperature Surveillance


CANDIDATE EXAMINER Admin-240 2R Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Perform SG Downcomer Temperature Surveillance Alternate Path:
CANDIDATE     EXAMINER Admin-240 2R Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Perform SG Downcomer Temperature Surveillance Alternate Path:
N/A  Facility JPM #:
N/A  Facility JPM #:


Admin-237 K/A Rating(s):
Admin-23 7 K/A Rating(s):
System: Gen K/A:  2.2.12 Rating:    3.7/4.1  Task Standard:
System: Gen K/A:  2.2.12 Rating:    3.7/4.1  Task Standard:
Perform SG Downcomer Temperature Surveillance by procedure for the 1A (ONLY) SG and determine that the surveillance requirement is NOT met for either of the specified computer points
Perform SG Downcomer Temperature Surveillance by procedure for the 1A (ONLY) SG and determine that the surveillance requirement is NOT met for either of the specified computer points
Line 370: Line 334:
Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator
Simulator
___ __ In-Plant __ ___ Classroom __X__  Perform __X__ Simulate
___ __ In-Plant __ ___ Classroom __X__  Perform __X__ Simulate _____   
_____   


==References:==
==References:==
Line 379: Line 342:
  & 2) OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 9 (Channel Check Of OTSG Downcomer Temperatures)
  & 2) OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 9 (Channel Check Of OTSG Downcomer Temperatures)
Validation Time:
Validation Time:
18 minutes Time Critical:
18 minutes       Time Critical:
NO ====================================================================================
NO ====================================================================================


Line 390: Line 353:
Performance Time
Performance Time
: _________
: _________
Examiner:
Examiner: ______________________________          ____________________________________/________
______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
NAME      SIGNATURE                            DATE
  ====================================================================================
  ====================================================================================
Line 412: Line 374:
Verify All SG Downcomer Temperature computer points agree within 3°F of each other.
Verify All SG Downcomer Temperature computer points agree within 3°F of each other.
IF All SG Downcomer Temperatures DO NOT agree within 3°F of each other, then perform Enclosure "Channel Check Of OTSG Downcomer Temperatures".
IF All SG Downcomer Temperatures DO NOT agree within 3°F of each other, then perform Enclosure "Channel Check Of OTSG Downcomer Temperatures".
O1E2008 - 528.87°F O1E2009 - 538.97°F O1E2012 - 532.78°F O1E2013 - 533.65°F  STANDARD: Determine that the above OAC point s do NOT agree within 3°F of each other, and perform Enclosure 4.19 "Channel Check of OTSG Downcomer Temperatures".
O1E2008 - 5 28.8 7°F O1E2009 - 53 8.97°F O1E2012 - 532.78°F O1E2013 - 53 3.65°F  STANDARD: Determine that the above OAC point s do NOT agree within 3°F of each other, and perform Enclosure 4.19 "Channel Check of OTSG Downcomer Temperatures".
COMMENTS:
COMMENTS:
CRITICAL STEP
CRITICAL STEP
Line 418: Line 380:
___ SAT   
___ SAT   


___ UNSAT STEP 2:  Step 3.1 (Enclosure 4.19) Determine saturation temperature for 1A OTSG based on power level and 1A OTSG outlet pressure as follows:
___ UNSAT   STEP 2:  Step 3.1 (Enclosure 4.19) Determine saturation temperature for 1A OTSG based on power level and 1A OTSG outlet pressure as follows:
Step 3.1.1  Determine 1A OTSG outlet pressure using any one of the following computer points:  O1E2281 - 888.5 psig  O1E2283 - 888.5 psig  O1E2031 - 888.5 psig  O1E2032 - 888.5 psig  STANDARD: Using the OAC determine that 1A OTSG pressure is 888.5. COMMENTS:
Step 3.1.1  Determine 1A OTSG outlet pressure using any one of the following computer points:  O1E2281 - 88 8.5 psig  O1E2283 - 88 8.5 psig  O1E2031 - 88 8.5 psig  O1E2032 - 88 8.5 psig  STANDARD: Using the OAC determine that 1A OTSG pressure is 888.5. COMMENTS:
___ SAT
___ SAT
___ UNSAT
___ UNSAT Admin-240 2R Page 6 of 9  STEP 3:  Step 3.1.2 Using table in Section 4, determine the 1A OTSG saturation temperature based on power level and 1A OTSG Outlet Pressure obtained in step 3.1.1. ____________ 1A OTSG saturation temperature STANDARD: Determine that 1A OTSG saturation temperature is  53 3.9ºF (533.8 - 534.0) by using the table in section 4.
 
Admin-240 2R Page 6 of 9  STEP 3:  Step 3.1.2 Using table in Section 4, determine the 1A OTSG saturation temperature based on power level and 1A OTSG Outlet Pressure obtained in step 3.1.1. ____________ 1A OTSG saturation temperature STANDARD: Determine that 1A OTSG saturation temperature is  533.9ºF (533.8 - 534.0) by using the table in section 4.
COMMENTS:     
COMMENTS:     


Line 430: Line 390:
___ SAT   
___ SAT   


___ UNSAT STEP 4:  Step 3.1.3 Compare O1E2008 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:
___ UNSAT   STEP 4:  Step 3.1.3 Compare O1E2008 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:
Step 3.1.4 IF O1E2008 SG Lower Downcomer Temperature Loop A is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable.
Step 3.1.4 IF O1E2008 SG Lower Downcomer Temperature Loop A is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable.
STANDARD: Determine that O1E2008 SG Lower Downcomer Temperature Loop A (528.87°F) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°F)
STANDARD: Determine that O1E2008 SG Lower Downcomer Temperature Loop A (528.87°F) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°F), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required
, and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required
. COMMENTS:
. COMMENTS:
CRITICAL STEP
CRITICAL STEP
___ SAT        ___ UNSAT
___ SAT        ___ UNSAT Admin-240 2R Page 7 of 9  STEP 5:  Step 3.1.5 Compare O1E2009 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:
 
Admin-240 2R Page 7 of 9  STEP 5:  Step 3.1.5 Compare O1E2009 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:
Step 3.1.6 IF O1E2009 SG Lower Downcomer Temperature Loop A is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable.
Step 3.1.6 IF O1E2009 SG Lower Downcomer Temperature Loop A is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable.
STANDARD: Determine that O1E2009 SG Lower Downcomer Temperature Loop A (538.97) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required
STANDARD: Determine that O1E2009 SG Lower Downcomer Temperature Loop A (538.97) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required
Line 447: Line 404:
___ SAT   
___ SAT   


___ UNSAT STOP TIME: ____________
___ UNSAT   STOP TIME: ____________


Admin-237 Page 8 of 9  CRITICAL STEP EXPLANATIONS:
Admin-237 Page 8 of 9  CRITICAL STEP EXPLANATIONS:
Line 467: Line 424:
4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature.
4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature.


ADMIN-241 2S  Page 1 of 9      REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
ADM IN-241 2S  Page 1 of 9      REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


ADMIN-241  Complete a Surveillance Evaluation (SRO ONLY)
ADMIN-241  Complete a Surveillance Evaluation (SRO ONLY)
CANDIDATE EXAMINER ADMIN-241 2S  Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
CANDIDATE   EXAMINER ADM IN-241 2S  Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Alternate Path
Alternate Path
:
:
Line 483: Line 440:
__  ___ In-Plant ___  ___ Classroom __ X___  Perform __ X__ Simulate_    __  References
__  ___ In-Plant ___  ___ Classroom __ X___  Perform __ X__ Simulate_    __  References
:
:
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 2 5 of 2 6 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Validation Time
Validation Time
Line 496: Line 453:
Performance Time
Performance Time
: _________
: _________
Examiner:
Examiner: ______________________________          ___________________________________/____
______________________________          ___________________________________/____
_____    NAME      SIGNATURE DATE =================================================================================
_____    NAME      SIGNATURE DATE =================================================================================
==== Comments ADMIN-241 2S  Page 3 of 9  SIMULATOR OPERATOR INSTRUCTIONS NONE ADMIN-241 2S  Page 4 of 9  Tools/Equipment/Procedures Needed
==== Comments ADM IN-241 2S  Page 3 of 9  SIMULATOR OPERATOR INSTRUCTIONS NONE ADM IN-241 2S  Page 4 of 9  Tools/Equipment/Procedures Needed
: PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 25 of 26 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.
: PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 2 5 of 2 6 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.
9 (RCP Power Supply Verification)
9 (RCP Power Supply Verification)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Line 508: Line 464:
0830 on Saturday, June 8. RCS Temperature = 298  
0830 on Saturday, June 8. RCS Temperature = 298  
°F. 1/0 RCP operation in progress (1A1 RCP in operation).
°F. 1/0 RCP operation in progress (1A1 RCP in operation).
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress.
PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress. SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed.
SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed.
Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available.
Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available.


Line 515: Line 470:
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)


ADMIN-241 2S  Page 5 of 9  START TIME: _______
ADM IN-241 2S  Page 5 of 9  START TIME: _______           STEP 1: Surveillance
STEP 1: Surveillance


== Description:==
== Description:==


STANDARD: Documents that this is a Tech Spec required verification of correct RCP breaker alignment of power available to the required pump this is not in operation COMMENTS:              ___ SAT
STANDARD: Documents that this is a Tech Spec required verification of correct RCP breaker alignment of power available to the required pump this is not in operation     COMMENTS:              ___ SAT
___ UNSAT STEP 2: Applicable TS(s)/SLC(s)/Site Directive(s), etc.:
___ UNSAT   STEP 2: Applicable TS(s)/SLC(s)/Site Directive(s), etc.:
STANDARD: Determines that Tech Spec 3.4.5 (RCS Loops Mode 3) is applicable and documents in Step 2 COMMENTS:        CRITICAL STEP
STANDARD: Determines that Tech Spec 3.4.5 (RCS Loops Mode 3) is applicable and documents in Step 2 COMMENTS:        CRITICAL STEP
___ SAT        ___ UNSAT STEP 3: Description of discrepancy/deficiency:
___ SAT        ___ UNSAT   STEP 3: Description of discrepancy/deficiency:
STANDARD: Documents that the required RCP Breaker alignment does not exist.
STANDARD: Documents that the required RCP Breaker alignment does not exist.
NOTE: TS 3.4.5 requires that either the 1B1 or 1B2 have power available COMMENTS:              ___ SAT
NOTE: TS 3.4.5 requires that either the 1B1 or 1B2 have power available COMMENTS:              ___ SAT
___ UNSAT STEP 4: Is surveillance applicable for present plant condit ions?  STANDARD: Marks "yes" COMMENTS:
___ UNSAT   STEP 4: Is surveillance applicable for present plant condit ions?  STANDARD: Marks "yes" COMMENTS:
CRITICAL STEP
CRITICAL STEP


___ SAT   
___ SAT   


___ UNSAT
___ UNSAT ADM IN-241 2S  Page 6 of 9  STEP 5: If surveillance is applicable, what is the latest due date for surveillance OR applicable LCO?
 
STANDARD: Documents that the latest due date is 0830 on Tuesday , June 11 (72 hours from discovery) per Condition A of TS 3.4.5 COMMENTS:
ADMIN-241 2S  Page 6 of 9  STEP 5: If surveillance is applicable, what is the latest due date for surveillance OR applicable LCO?
STANDARD: Documents that the latest due date is 0830 on Tuesday
, June 11 (72 hours from discovery) per Condition A of TS 3.4.5 COMMENTS:
CRITICAL STEP
CRITICAL STEP


___ SAT
___ SAT
___ UNSAT
___ UNSAT STEP 6: Is applicable TS(s)/SLC(s)/Site Directive(s), etc. satisfied with existing discrepancy/deficiency?
 
STEP 6: Is applicable TS(s)/SLC(s)/Site Directive(s), etc. satisfied with existing discrepancy/deficiency?
STANDARD:  *Marks "no" Explains in justification that TS 3.4.5 requires both RCS loops be Operable and with no power available to the 1B1 and 1B2 RCP's, the B RCS loop is NOT operable COMMENTS:      *CRITICAL STEP
STANDARD:  *Marks "no" Explains in justification that TS 3.4.5 requires both RCS loops be Operable and with no power available to the 1B1 and 1B2 RCP's, the B RCS loop is NOT operable COMMENTS:      *CRITICAL STEP


___ SAT        ___ UNSAT STEP 7: Support personnel/groups contacted (if any) AND information provided:
___ SAT        ___ UNSAT   STEP 7: Support personnel/groups contacted (if any) AND information provided:
STANDARD: Candidate may indicate requesting SPOC assistance to determine why neither of the required RCP breakers are racked in however since there is no indication of mechanical failures it would not be required.
STANDARD: Candidate may indicate requesting SPOC assistance to determine why neither of the required RCP breakers are racked in however since there is no indication of mechanical failures it would not be required.


COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT
___ SAT        ___ UNSAT ADM IN-241 2S  Page 7 of 9  STEP 8: Describe corrective/compensatory actions being taken (procedure change, WR, PIP, etc.), and resolution date for those actions.
 
ADMIN-241 2S  Page 7 of 9  STEP 8: Describe corrective/compensatory actions being taken (procedure change, WR, PIP, etc.), and resolution date for those actions.
STANDARD:  *Corrective/Compensatory Action:
STANDARD:  *Corrective/Compensatory Action:
Candidate should indicate that actions will commence to establish the required breaker alignment. This could be by issuing a Work Request, writing a PIP, or dispatching personnel to determine why the breakers are open and if the breakers could be racked in.
Candidate should indicate that actions will commence to establish the required breaker alignment. This could be by issuing a Work Request, writing a PIP, or dispatching personnel to determine why the breakers are open and if the breakers could be racked in.
Line 556: Line 503:
This blank may be left open at this time since the investigation is just beginning however in no case should a date and time that would result in exceeding the 72 hour completion time be entered.
This blank may be left open at this time since the investigation is just beginning however in no case should a date and time that would result in exceeding the 72 hour completion time be entered.
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT STEP 9: Approval:
___ SAT        ___ UNSAT   STEP 9: Approval:   STANDARD: Signs and Dates either of the blanks provided COMMENTS:    END OF TASK
STANDARD: Signs and Dates either of the blanks provided COMMENTS:    END OF TASK
___ SAT   
___ SAT   


___ UNSAT
___ UNSAT ADM IN-241 2S  Page 8 of 9  CRITICAL STEP EXPLANATIONS STEP # Explanation 2  Required to determine the applicable Tech Spec 4 Required to determine if this Tech Spec is applicable in Mode 3 5 Incorrect documentation could lead to exceeding allowed time to complete Tech Spec Required Actions.
 
ADMIN-241 2S  Page 8 of 9  CRITICAL STEP EXPLANATIONS STEP # Explanation 2  Required to determine the applicable Tech Spec 4 Required to determine if this Tech Spec is applicable in Mode 3 5 Incorrect documentation could lead to exceeding allowed time to complete Tech Spec Required Actions.
6 Required to determine if the LCO is met
6 Required to determine if the LCO is met


Line 575: Line 519:
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)
Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)


Admin-306 3B Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
Admin-30 6 3B Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


Admin-306 Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (EDL)
Admin-30 6 Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (EDL)
CANDIDATE EXAMINER Admin-306 3B Page 2 of 8  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits. Alternate Path
CANDIDATE     EXAMINER Admin-30 6 3B Page 2 of 8  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits. Alternate Path
:  N/A  Facility JPM #
:  N/A  Facility JPM #
:
:
Admin 305 K/A Rating(s)
Admin 305 K/A Rating(s)
:  System: Gen  K/A:    2.3.4  Rating:  3.2/3.7  Task Standard
:  System: Gen  K/A:    2.3.4  Rating:  3.2/3.7  Task Standard
:  Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits.
:  Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits.
Line 593: Line 537:
)  Validation Time
)  Validation Time
: 20 min.      Time Critical
: 20 min.      Time Critical
No =====================================================================================
N o =====================================================================================
Candidate
Candidate: _______________________________________
: _______________________________________
Time Start: _____
Time Start: _____
____    NAME      Time Finish: ________
____    NAME      Time Finish: ________
Line 605: Line 548:
______    NAME      SIGNATURE                            DATE
______    NAME      SIGNATURE                            DATE
  =====================================================================================
  =====================================================================================
= COMMENTS Admin-306 3B Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-306 3B Page 4 of 8 Tools/Equipment/Procedures Needed
= COMMENTS Admin-30 6 3B Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-30 6 3B Page 4 of 8 Tools/Equipment/Procedures Needed
:  Calculator Note tablet READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
:  Calculator Note tablet READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO "A" has received 1.26 R em TEDE this year The following tasks are required to be performed:
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO "A" has received 1.26 R em TEDE this year The following tasks are required to be performed:
0B# 1BTASK 2BTIME REQUIRED 3BDOSE RATE 4B1 5BClose 3C-573    6B11 min 7B6.15 R/hr 8B2 9BOpen 3FDW
0B# 1BTASK 2BTIME REQUIRED 3BDOSE RATE 4B 1 5BClose 3C-573    6B11 min 7B6.15 R/hr 8B 2 9BOpen 3FDW-313 10B6 min 11B18.25 R/hr 12B 3 13BOpen all Unit 3's ADVs 14B4.65 R/hr Note:  Assume no dose is received while traveling between tasks.
-313 10B6 min 11B18.25 R/hr 12B3 13BOpen all Unit 3's ADVs 14B4.65 R/hr Note:  Assume no dose is received while traveling between tasks.


INITIATING CUE Refer to the above information. NEO "A" has completed tasks 1 and 2 in the time required.
INITIATING CUE Refer to the above information. NEO "A" has completed tasks 1 and 2 in the time required.


Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.
Admin-306 3B Page 5 of 8  START TIME: _______
Admin-30 6 3B Page 5 of 8  START TIME: _______
Examiner Note:    Candidate may perform these steps in a different order
Examiner Note:    Candidate may perform these steps in a different order
; however, the calculated stay time must be correct. EDL is 5 R em per event (LOCA or SGTR).
; however , the calculated stay time must be correct. EDL is 5 R em per event (LOCA or SGTR).
Current exposure for the year is not counted toward the Emergency Dose Limit s (EDL). STEP 1: Determine dose received while performing task 1.
Current exposure for the year is not counted toward the Emergency Dose Limit s (EDL). STEP 1: Determine dose received while performing task 1.
STANDARD: Determine dose received while performing task 1.
STANDARD: Determine dose received while performing task 1.
6.15 R/hr X 1hr/60 min X 11 min = 1.1275 R (1.12 to 1.13 R)
6.15 R/hr X 1hr/60 min X 11 min = 1.1275 R (1.12 to 1.13 R)
COMMENTS:        CRITICAL STEP
COMMENTS:        CRITICAL STEP
___ SAT        ___ UNSAT STEP 2: Determine dose received while performing task 2.
___ SAT        ___ UNSAT   STEP 2: Determine dose received while performing task 2.


STANDARD: Determine dose received while performing task 2.
STANDARD: Determine dose received while performing task 2.
18.25 R/hr X 1hr/60 min X 6 min = 1.825 R  (1.82 to 1.83 R)
18.2 5 R/hr X 1hr/60 min X 6 min = 1.8 25 R  (1.82 to 1.83 R)
COMMENTS:          CRITICAL STEP
COMMENTS:          CRITICAL STEP


___ SAT        ___ UNSAT STEP 3: Determine dose remaining from EDLs.
___ SAT        ___ UNSAT   STEP 3: Determine dose remaining from EDLs.


STANDARD: Determine dose remaining from EDLs.
STANDARD: Determine dose remaining from EDLs.
5R - 1.1275R - 1.825R = 2.0475 R  (2.04 to 2.06 R)
5R - 1.1275 R - 1.8 25R = 2.04 75 R  (2.04 to 2.06 R)
COMMENTS:
COMMENTS:
CRITICAL STEP
CRITICAL STEP
___ SAT        ___ UNSAT
___ SAT        ___ UNSAT Admin-30 6 3B Page 6 of 8  STEP 4: Determine time available for the NEO to complete task 3 without exceeding EDL
 
Admin-306 3B Page 6 of 8  STEP 4: Determine time available for the NEO to complete task 3 without exceeding EDL
. STANDARD: Stay time is calculated to be:
. STANDARD: Stay time is calculated to be:
Available Dose
Available Dose
   =  2.0475 R    = .44 hr X 60 min = 26.42 min      Dose Rate 4.65 R/hr      1hr        (26 to 27 Minutes
   =  2.04 75 R    = .44 hr X 60 min = 26.4 2 min      Dose Rate 4.65 R/hr      1hr        (26 to 27 Minutes
)  COMMENTS:      END OF TASK CRITICAL STEP
)  COMMENTS:      END OF TASK CRITICAL STEP
___ SAT
___ SAT
___ UNSAT STOP TIME: ________
___ UNSAT   STOP TIME: ________


Admin-306 3B Page 7 of 8  CRITICAL STEP EXPLANATIONS STEP # Explanation 1  Required to calculate stay time. 2 Required to calculate stay time.
Admin-30 6 3B Page 7 of 8  CRITICAL STEP EXPLANATIONS STEP # Explanation 1  Required to calculate stay time. 2 Required to calculate stay time.
3 Required to calculate stay time.
3 Required to calculate stay time.
4 Required to calculate stay time.
4 Required to calculate stay time.
Line 650: Line 590:
3B  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
3B  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO "A" has received 1.26 R em TEDE this year The following tasks are required to be performed:
INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO "A" has received 1.26 R em TEDE this year The following tasks are required to be performed:
15B# 16BTASK 17BTIME REQUIRED 18BDOSE RATE 19B1 20BClose 3C-573    21B11 min 22B6.15 R/hr 23B2 24BOpen 3FDW
15B# 16BTASK 17BTIME REQUIRED 18BDOSE RATE 19B 1 20BClose 3C-573    21B11 min 22B6.15 R/hr 23B 2 24BOpen 3FDW-313 25B6 min 26B18.25 R/hr 27B 3 28BOpen all Unit 3's ADVs 29B4.65 R/hr Note:  Assume no dose is received while traveling between tasks.
-313 25B6 min 26B18.25 R/hr 27B3 28BOpen all Unit 3's ADVs 29B4.65 R/hr Note:  Assume no dose is received while traveling between tasks.


INITIATING CUE Refer to the above information. NEO "A" has completed tasks 1 and 2 in the time required.
INITIATING CUE Refer to the above information. NEO "A" has completed tasks 1 and 2 in the time required.
Line 657: Line 596:
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.     
Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.     


ADMIN-412 4S    Page 1 of 11      REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
ADM IN-412 4S    Page 1 of 11      REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


ADMIN-412 Determine Emergency Classification and complete the initial Emergency Notification form (SRO Only)
ADMIN-4 12 Determine Emergency Classification and complete the initial Emergency Notification form (SRO Only)


CANDIDATE EXAMINER ADMIN-412 4S    Page 2 of 11    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Determine Emergency Classification and complete the initial Emergency Notification form Alternate Path
CANDIDATE   EXAMINER ADM IN-412 4S    Page 2 of 11    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Determine Emergency Classification and complete the initial Emergency Notification form Alternate Path
:  N/A          Facility JPM #
:  N/A          Facility JPM #
: N/A  K/A Rating(s)
: N/A  K/A Rating(s)
Line 671: Line 610:
__  ___ In-Plant ___  ___ Classroom __ X___  Perform __ X__ Simulate_    __  References
__  ___ In-Plant ___  ___ Classroom __ X___  Perform __ X__ Simulate_    __  References
:
:
RP/0/B/1000/0 01 (Emergency Classification
RP/0/B/1000/0 0 1 (Emergency Classification
) RP/0/B/1000/0 02 (Control Room Emergency Coordinator Procedure
) RP/0/B/1000/0 0 2 (Control Room Emergency Coordinator Procedure
) Nuclear Power Plant Emergency Notification Form 4.1.A.1  Validation Time
) Nuclear Power Plant Emergency Notification Form 4.1.A.1  Validation Time
: 20 min.      Time Critical
: 20 min.      Time Critical
Line 686: Line 625:
Performance Time
Performance Time
: _________
: _________
Examiner:
Examiner: ______________________________          ___________________________________/____
______________________________          ___________________________________/____
_____    NAME      SIGNATURE                            DATE
_____    NAME      SIGNATURE                            DATE
  =================================================================================
  =================================================================================
==== Comments ADMIN-412 4S    Page 3 of 11  SIMULATOR OPERATOR INSTRUCTIONS NONE ADMIN-412 4S    Page 4 of 11  Tools/Equipment/Procedures Needed
==== Comments ADM IN-412 4S    Page 3 of 11  SIMULATOR OPERATOR INSTRUCTIONS NONE ADM IN-412 4S    Page 4 of 11  Tools/Equipment/Procedures Needed
: RP/0/B/1000/0 01 (Emergency Classification)
: RP/0/B/1000/0 0 1 (Emergency Classification)
RP/0/B/1000/0 02 (Control Room Emergency Coordinator Procedure)
RP/0/B/1000/0 0 2 (Control Room Emergency Coordinator Procedure)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Line 704: Line 642:
INITIATING CUE:
INITIATING CUE:
Perform the required actions of the Emergency Coordinator:
Perform the required actions of the Emergency Coordinator:
: 1. Determine Emergency Classification at Time = 0816 2. Complete appropriate Emergency Notification Form
: 1. Determine Emergency Classification at Time = 0816 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. When required, other operator s will maintain the Emergency Coordinator's Log and perform the duties of the Control Room Offsite Communicator.
 
THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. When required, other operators will maintain the Emergency Coordinator's Log and perform the duties of the Control Room Offsite Communicator.


ADMIN-412 4S    Page 5 of 11  START TIME: _______
ADM IN-412 4S    Page 5 of 11  START TIME: _______         (Actual time)
        (Actual time)
STEP 1: Classify the Event STANDARD: Refer to RP/0/B/1000/01 (Emergency Classification) Enclosure 4.
STEP 1: Classify the Event STANDARD: Refer to RP/0/B/1000/01 (Emergency Classification) Enclosure 4.
1 (Fission Product Barrier Matrix)
1 (Fission Product Barrier Matrix)
Classify as an ALERT due to:
Classify as an ALERT due to:
Line 719: Line 654:
___ SAT   
___ SAT   


___ UNSAT STEP 2: Commence the Off-Site Notification Form
___ UNSAT   STEP 2: Commence the Off-Site Notification Form
. STANDARD: Go to RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure) and initiate procedure by determining symptoms for entry exist and check Step 1.1  COMMENTS:              ___ SAT
. STANDARD: Go to RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure) and initiate procedure by determining symptoms for entry exist and check Step 1.1  COMMENTS:              ___ SAT
___ UNSAT STEP 3: Step 2.1.
___ UNSAT   STEP 3: Step 2.1. STANDARD: Determine step 2.1 does not apply COMMENTS:              ___ SAT        ___ UNSAT ADM IN-412 4S    Page 6 of 11  NOTE: State and County agencies shall be notified within 15 minutes of E
STANDARD: Determine step 2.1 does not apply COMMENTS:              ___ SAT        ___ UNSAT
 
ADMIN-412 4S    Page 6 of 11  NOTE: State and County agencies shall be notified within 15 minutes of E
-plan declaration, Classification upgrades, and Protective Action Recommendations.
-plan declaration, Classification upgrades, and Protective Action Recommendations.
STEP 4: Step 2.2 Declare the appropriate Emergency Classification level.
STEP 4: Step 2.2 Declare the appropriate Emergency Classification level.
Classification __ALERT_____ (UE, ALERT, SAE, GE)
Classification __ALERT_____ (UE, ALERT, SAE, GE)
Time Declared: _________
Time Declared: _________
STANDARD: Declare an ALERT due to:  1A SGTR > 160 gpm ( 4 pts.) and the SG with an open path to the environment (1B SG) is NOT being fed by the affected unit nor does it contain a SG Tube Leak Time ALERT Declared documented in Step 1 (SAT is < Start Time + 15 minutes)
STANDARD: Declare an ALERT due to:  1A SGTR > 160 gpm ( 4 pts.) and the SG with an open path to the environment (1B SG) is NOT being fed by the affected unit nor does it contain a SG Tube Leak Time ALERT Declar ed documented in Step 1 (SAT is < Start Time + 15 minutes)
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT STEP 5: Step 2.3 & 2.4 STANDARD: Determine Steps 2.3 and 2.4 do not apply COMMENTS:
___ SAT        ___ UNSAT   STEP 5: Step 2.3 & 2.4 STANDARD: Determine Steps 2.3 and 2.4 do not apply COMMENTS:
___ SAT
___ SAT
___ UNSAT STEP 6: Step 2.5 Appoint Control Room Offsite Communicator(s) and perform the following:  N/A  STANDARD: Any name (real or imaginary) is acceptable.
___ UNSAT   STEP 6: Step 2.5 Appoint Control Room Offsite Communicator(s) and perform the following:  N/A  STANDARD: Any name (real or imaginary) is acceptable.
Note: Initiating Cue indicates these actions will be performed by another operator.
Note: Initiating Cue indicates these actions will be performed by another operator.
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT
___ SAT        ___ UNSAT ADM IN-412 4S    Page 7 of 11  STEP 7: Step 2.6 IAAT Changing plant conditions require an emergency classification upgrade, THEN Notify Offsite Communicator to complete the in
 
ADMIN-412 4S    Page 7 of 11  STEP 7: Step 2.6 IAAT Changing plant conditions require an emergency classification upgrade, THEN Notify Offsite Communicator to complete the in
-progress notifications per RP/0/B/1000/15A, (Offsite Communications From The CR) AND Re-initiate a clean copy of this procedure for the upgraded classification and stop this procedure.
-progress notifications per RP/0/B/1000/15A, (Offsite Communications From The CR) AND Re-initiate a clean copy of this procedure for the upgraded classification and stop this procedure.
STANDARD: An Upgrade is not expected.
STANDARD: An Upgrade is not expected.
Line 746: Line 676:
___ SAT   
___ SAT   


___ UNSAT STEP 8: Step 2.7 Obtain the appropriate Offsite Notification form from the Emergency Plan cart.
___ UNSAT   STEP 8: Step 2.7 Obtain the appropriate Offsite Notification form from the Emergency Plan cart.
STANDARD: Initial ALERT form # 4.1.A.1 is selected and candidate continues to fill
STANDARD: Initial ALERT form # 4.1.A.1 is selected and candidate continues to fill
-out form per the Step 2.7 substeps.
-out form per the Step 2.7 substeps.
Line 753: Line 683:
___ SAT   
___ SAT   


___ UNSAT
___ UNSAT ADM IN-412 4S    Page 8 of 11  STEP 9: Step 2.7 (continued) 2.7.1. Ensure EAL # as determined by RP/0/B/1000/001 matches Line 4. (4.1.A.1) 2.7.2. Line 1 - Mark appropriate box "Drill" or "Actual Event" (DRILL) 2.7.3. *Line 1 - Enter Message #  
 
(#1) 2.7.4. *Line 2 - Mark Initial (INITIAL marked) 2.7.5. *Line 6 - ('Is Occurring' marked) A. Mark "Is Occurring" if any of the following are true:
ADMIN-412 4S    Page 8 of 11  STEP 9: Step 2.7 (continued) 2.7.1. Ensure EAL # as determined by RP/0/B/1000/001 matches Line 4. (4.1.A.1) 2.7.2. Line 1 - Mark appropriate box "Drill" or "Actual Event" (DRILL) 2.7.3. *Line 1 - Enter Message #  
(#1) 2.7.4. *Line 2 - Mark Initial (INITIAL marked) 2.7.5. *Line 6 - ('Is Occurring' marked)
A. Mark "Is Occurring" if any of the following are true:
RIAs 40, 45, or 46 are increasing or in alarm If containment is breached Containment pressure
RIAs 40, 45, or 46 are increasing or in alarm If containment is breached Containment pressure
  > 1 psig B. Mark "None" if none of the above is applicable.
  > 1 psig B. Mark "None" if none of the above is applicable.
2.7.6. *Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A ('D' marked) 2.7.7. *Line 8 - Mark "Stable" unless an upgrade or additional PARs are anticipated within an hour.
2.7.6. *Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A ('D' mark ed) 2.7.7. *Line 8 - Mark "Stable" unless an upgrade or additional PARs are anticipated within an hour.
Refer to Enclosure 4.9, (Event Prognosis Definitions) 2.7.8. *Line 10 - Military time and date of declaration (Refer to date/time in Step 2.2)  (Insert time from STEP 1 and today's date
Refer to Enclosure 4.9, (Event Prognosis Definitions) 2.7.8. *Line 10 - Military time and date of declaration (Refer to date/time in Step 2.2)  (Inser t time from STEP 1 and today's date
, military time is not critical as long as time is specific and accurate.)
, military time is not critical as long as time is specific and accurate.)
2.7.9. Line 11 - If more than one unit affected, mark "All" (Unit 1 marked) 2.7.10. Line 12 - Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown (Unit 1 - 0% power, Shutdown at 0800 with today's date.)
2.7.9. Line 11 - If more than one unit affected, mark "All" (Unit 1 marked) 2.7.10. Line 12 - Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown (Unit 1 - 0% power, Shutdown at 0800 with today's date.)
Line 768: Line 695:
  (Condition A does not exist. No PAR required)
  (Condition A does not exist. No PAR required)
STANDARD: Correctly fills out Emergency Notification Form in accordance with Key. COMMENTS:      *CRITICAL STEP
STANDARD: Correctly fills out Emergency Notification Form in accordance with Key. COMMENTS:      *CRITICAL STEP
___ SAT    ___ UNSAT
___ SAT    ___ UNSAT ADM IN-412 4S    Page 9 of 11  STEP 10: Step 2.7 (Continued)  2.7.13. Line 17 - OSM signature, CURRENT Time/Date (MUST SIGN)
 
ADMIN-412 4S    Page 9 of 11  STEP 10: Step 2.7 (Continued
)  2.7.13. Line 17 - OSM signature, CURRENT Time/Date (MUST SIGN)
STANDARD: Indicate that OSM signature will be obtained on the completed Emergency Notification Form within 15 minutes of classification time recorded in step 1.
STANDARD: Indicate that OSM signature will be obtained on the completed Emergency Notification Form within 15 minutes of classification time recorded in step 1.
STOP TIME #2: Time for Notification __________  
STOP TIME #2: Time for Notification __________  
Line 777: Line 701:
COMMENTS:      END OF TASK CRITICAL STEP
COMMENTS:      END OF TASK CRITICAL STEP


ADMIN-412 4S    Page 10 of 11  CRITICAL STEP EXPLANATIONS STEP # Explanation 1  The candidate needs to be able to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes
ADM IN-412 4S    Page 10 of 11  CRITICAL STEP EXPLANATIONS STEP # Explanation 1  The candidate needs to be able to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes
. 8 The correct form that matches the EAL # is selected.
. 8 The correct form that matches the EAL # is selected.
9 The emergency notification form is filled-out with each line entry identified as 'critical' complete and accurate.
9 The emergency notification form is filled-out with each line entry identified as 'critical' complete and accurate.
Line 789: Line 713:
. 0806 1B SG has been isolated and RCS Temperature stabilized at 520F CETCs. 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring
. 0806 1B SG has been isolated and RCS Temperature stabilized at 520F CETCs. 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring
. 1RIA-40 = 1,245 cps and increasing.
. 1RIA-40 = 1,245 cps and increasing.
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. INITIATING CUE:
INITIATING CUE:
Perform the required actions of the Emergency Coordinator:
Perform the required actions of the Emergency Coordinator:
: 1. Determine Emergency Classification at Time = 0816
: 1. Determine Emergency Classification at Time = 0816
: 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. When required, other operators will maintain the Emergency Coordinator's Log and perform the duties of the Control Room Offsite Communicator.}}
: 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. When required, other operator s will maintain the Emergency Coordinator's Log and perform the duties of the Control Room Offsite Communicator.}}

Revision as of 01:08, 14 July 2018

Oconee Initial Exam 2013-301 Final Administrative JPMs
ML13248A111
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/04/2013
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-269/13-301, 50-270/13-301, 50-287/13-301
Download: ML13248A111 (68)


Text

Admin-130 2.1S Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

Admin-130 Perform Manual RCS Leakage Calculation and TS Determination (SRO Only)

CANDIDATE EXAMINER Admin-130 2.1S Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform Manual RCS Leakage Calculation and T S Determination Alternate Path:

N/A Facility JPM #:

CRO-43 K/A Rating(s):

System: Gen K/A: 2.1.7 Rating: 4.4/4.7 Task Standard:

RCS Leakage is calculated per the attached key.

TS 3.4.13 Condition B entered. Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator _____ In-Plant __ ___ Classroom __X___ Perform __X___ Simulate __ __

References:

PT/O/A/0600/001A (Loss Of Computer

) PT/1/A/0 600/010 (Reactor Coolant Leakage

) TS 3.4.13 (RCS Operational LEAKAGE

) Validation Time:

18 minutes Time Critical:

NO =====================================================================================

Candidate:

_______________________________________

Time Start: ____________ NAME Time Finish: ___

________ Performance Rating:

SAT ______ UNSAT ______

Performance Time ___________

Examiner: ______________________________ ____________________________________/_________ NAME SIGNATURE DATE

=========================================================================

COMMENTS Admin-130 2.1S Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-130 2.1S Page 4 of 12 Tools/Equipment/Procedures Needed:

PT/1/A/0600/0 10 (Reactor Coolant Leakage)

Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)

Technical Specifications

READ TO OPERATOR DIRECTION TO TRAINEE

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES

The OSM directs you to perform a manual RCS leakage calculation per PT/1 A/0 600/0 10 (Reactor Coolant Leakage)

Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.

Evaluate leakage and determine if a ny Tech S pec Conditions that apply. Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 7 5.2 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%

Admin-130 2.1S Page 5 of 12 START TIME: _______

STEP 1: Step 2.1 Record Initial Data in "Table #1".

____Sat ____Unsat Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches - = RCS Temp 579.0°F - = QT Level 86.5 inches - = LDST Level 76.7 inches - = Rx Power 100.0% - = RCS Press 2150 psig - = CR Pos 92.7% - = STANDARD: Candidate enters initial set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.

COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________

STANDARD: Candidate enters 0015 (from initiating cue)

COMMENTS

____Sat ____Unsat Admin-130 2.1S Page 6 of 12 STEP 3: Step 2.3 After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, record Final Data in "Table

  1. 1". ____Sat ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches

- 219.5 inches

= RCS Temp 579.0°F - 579.1°F = QT Level 86.5 inches - 86.5 inches = LDST Level 76.7 inches - 7 5.2 inches = Rx Power 100.0% - 100.1% = RCS Press 2150 psig - 2150 psig = CR Pos 92.7% - 92.7% = STANDARD: Candidate enters final set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)

COMMENTS STEP 4: Step 2.4 Record time Fi n al Data recorded: ____________

STANDARD: Candidate enters 0115 COMMENTS ____Sat ____Unsat STEP 5: Step 2.5 Record time elapsed time: ____________ minutes STANDARD: Candidate enters 60 minutes COMMENTS CRITICAL STEP

____Sat ____Unsat Admin-130 2.1S Page 7 of 12 STEP 6: Step 2.6 Calculate and record "Change" values in "Table # 1"..

CRITICAL STEP

____Sat ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches

- 219.5 inches

= -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches - 7 5.2 inches = +1.5 inches Rx Power 100.0% - 100.1% = -.1% RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0 % STANDARD: Candidate calculates the change in data and fills in Table 1 change column. COMMENTS STEP :7 Step 2.7 Calculate Corrected Pzr Level Change:

STANDARD: -0.5 inches - (6.831 inches/°F X

-.1°F) = +.1831 inches

(+.18 to +.2) COMMENTS CRITICAL STEP

____Sat ____Unsat STEP :8 Step 2.8 Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch =

+2.63 gallons (+.18 to +.2) ( 2.585 to 2.873) COMMENTS CRITICAL STEP

____Sat ____Unsat Admin-130 2.1S Page 8 of 12 STEP :9 Step 2.9 Convert QT Level Change to gallons:

STANDARD: No change COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +1.5 inches X 30.956 gallons / inch =

+46.434 gallons (+46.4 to +46.5) COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 46.434 gallons = 49.064 gallons ( 2.585 to 2.873) (+46.4 to +46.5) (48.98 to 49.37) COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 49.064 gallons / 60 minutes = .818 gpm (48.98 to 49.37) (.816 to .823) COMMENTS CRITICAL STEP

____Sat

____Unsat Admin-130 2.1S Page 9 of 12 STEP :13 Refer to TS 3.4.13 RCS Operational LEAKAGE STANDARD: Candidate determines that the Tech Spec limit for Unidentified Leakage is 1 gpm therefore entry into the Actions Table is NOT required

. COMMENTS ____Sat

____Unsat STEP :1 4 Refer to TS 3.4.13 RCS Operational LEAKAGE EXAMINER CUE: Hand the candidate Cue sheet #2 STANDARD: NOTE: After second cue sheet handed to candidate, he/she determines the leakage is pressure boundary leakage (see below)

Pressure Boundary: Determine that leakage exceeds the 0 gpm Pressure Boundary leakage limit and TS 3.4.13 Condition B applies. This required Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

COMMENTS END TASK CRITICAL STEP

____Sat ____Unsat STOP TIME: ____________

Admin-130 2.1S Page 10 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate.

6 Necessary data calculation to properly determine manual RCS leakage rate.

7 Necessary data calculation to properly determine manual RCS leakage rate.

8 Necessary data calculation to properly determine manual RCS leakage rate.

9 Necessary data calculation to properly determine manual RCS leakage rate.

10 Necessary data calculation to properly determine manual RCS leakage rate.

11 Necessary data calculation to properly determine manual RCS leakage rate.

12 Necessary data calculation to properly determine manual RCS leakage rate.

13 Necessary to refer to correct TS and conclude limits are not exceeded. 1 4 Necessary to refer to correct TS and conclude limits are exceeded

.

1.1S CANDIDATE CUE SHEET

  1. 1 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress; however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES

The OSM directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage) Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.

Evaluate leakage and determine if any Tech Spec Conditions that apply.

Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 7 5.2 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%

1.1S CANDIDATE CUE SHEET #2 (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIATING CUES Since completing the RCS Manual Leakage calculation, the RCS leak rate has increased to 2.17 gpm and the location of the leak has been determined to be the weld that connects the 1A1 HPI injection nozzle to the RCS piping.

Indicate below what (if any) Tech Spec Conditions, Required Actions, and Completion Times that apply.

Admin-131 1.1R Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

Admin-131 Perform Manual RCS Leakage Calculation (RO Only)

CANDIDATE EXAMINER

Admin-131 1.1R Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform Manual RCS Leakage Calculation Alternate Path:

N/A Facility JPM #:

CRO-43 K/A Rating(s):

System: Gen K/A: 2.1.7 Rating: 4.4/4.7 Task Standard:

RCS Leakage is calculated per the attached key.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator _____ In-Plant __ ___ Classroom __X___ Perform __X___ Simulate __ __

References:

PT/O/A/0600/001A (Loss Of Computer

) PT/1/A/0 600/010 (Reactor Coolant Leakage

) Validation Time:

18 minutes Time Critical: NO =====================================================================================

Candidate:

_______________________________________

Time Start: ____________ NAME Time Finish: ___

________ Performance Rating:

SAT ______ UNSAT ______

Performance Time ___________

Examiner: ______________________________ ____________________________________/___

______ NAME SIGNATURE DATE

=========================================================================

COMMENTS Admin-131 1.1R Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-131 1.1R Page 4 of 10 Tools/Equipment/Procedures Needed PT/1/A/0600/0 10 (Reactor Coolant Leakage)

Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet)

READ TO OPERATOR DIRECTION TO TRAINEE

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS

Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift.

INITIATING CUES

The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1 A/0 600/010 (Reactor Coolant Leakage)

Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.

Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%

Admin-131 1.1R Page 5 of 10 START TIME: _______

STEP 1: Step 2.1 Record Initial Data in "Table #1".

____Sat ____Unsat Value Initial Data Minus Final Data Equals Change PZR Level 219.0 inches - = RCS Temp 579.0°F - = QT Level 86.5 inches - = LDST Level 76.7 inches - = Rx Power 100.0% - = RCS Press 2150 psig - = CR Pos 92.7% - = STANDARD: Student enters initial set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) from the initiating cue.

COMMENTS STEP 2: Step 2.2 Record time Initial Data recorded: ____________

STANDARD: Student enters 0015 (from initiating cue)

COMMENTS

____Sat ____Unsat Admin-131 1.1R Page 6 of 10 STEP 3: Step 2.3 After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, record Final Data in "Table #1".

____Sat ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches

- 219.5 inches

= RCS Temp 579.0°F - 579.1°F = QT Level 86.5 inches - 86.5 inches = LDST Level 76.7 inches - 74.0 inches

= Rx Power 100.0% - 100.1% = RCS Press 2150 psig - 2150 psig = CR Pos 92.7% - 92.7% = STANDARD: Student enters final set of data into "Table #1" of Enclosure 13.3 (Manual Leakage Calculation Data Sheet) (from initiating cue)

COMMENTS STEP 4: Step 2.4 Record time Fi n al Data recorded: ____________

STANDARD: Student enters 0115 COMMENTS

____Sat ____Unsat STEP 5: Step 2.5 Record time elapsed time: ____________ minutes STANDARD: Student enters 60 minutes COMMENTS CRITICAL STEP

____Sat ____Unsat Admin-131 1.1R Page 7 of 10 STEP 6: Step 2.6 Calculate and record "Change" values in "Table # 1"..

CRITICAL STEP

____Sat ____Unsat Value Initial Data Minus Final Data Equal Change PZR Level 219.0 inches

- 219.5 inches

= -.5 inches RCS Temp 579.0°F - 579.1°F = -.1°F QT Level 86.5 inches - 86.5 inches = 0 inches LDST Level 76.7 inches

- 74.0 inches

= +2.7 inches Rx Power 100.0% - 100.1% = -.1% RCS Press 2150 psig - 2150 psig = 0 psig CR Pos 92.7% - 92.7% = 0 % STANDARD: Student calculates the change in data and fills in Table 1 change column.

COMMENTS STEP :7 Step 2.7 Calculate Corrected Pzr Level Change:

STANDARD: -0.5 inches - (6.831 inches/°F X

-.1°F) = +.1831 inches

(+.18 to +.2) COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :8 Step 2.8 Convert Corrected Pzr Level Change to gallons STANDARD: +.1831 inches X 14.364 gallons / inch = +2.63 gallons (+.18 to +.2) ( 2.585 to 2.873) COMMENTS CRITICAL STEP

____Sat ____Unsat Admin-131 1.1R Page 8 of 10 STEP :9 Step 2.9 Convert QT Level Change to gallons:

STANDARD: No change COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :10 Step 2.10 Convert LDST Level Change to gallons STANDARD: +2.7 inches X 30.956 gallons / inch = +83.5812 gallons

(+83.5 to +83.6)

COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :11 Step 2.11 Calculate Total Volume Change STANDARD: 2.63 gallons + 0 gallons + 83.5812 gallons =

8 6.2112 gallons (2.585 to 2.873) (+83.5 to +83.6)

(86.08 to 86.47) COMMENTS CRITICAL STEP

____Sat

____Unsat STEP :12 Step 2.12 Calculate "RCS Unidentified Leakage Rate" STANDARD: 86.2112 gallons / 60 minutes =

1.437 gpm (86.08 to 86.47

) (1.434 to 1.44 1) COMMENTS END TASK CRITICAL STEP

____Sat

____Unsat STOP TIME: ____________

Admin-131 1.1R Page 9 of 10 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 5 Necessary data calculation to properly determine manual RCS leakage rate.

6 Necessary data calculation to properly determine manual RCS leakage rate.

7 Necessary data calculation to properly determine manual RCS leakage rate.

8 Necessary data calculation to properly determine manual RCS leakage rate.

9 Necessary data calculation to properly determine manual RCS leakage rate.

10 Necessary data calculation to properly determine manual RCS leakage rate.

11 Necessary data calculation to properly determine manual RCS leakage rate.

12 Necessary data calculation to properly determine manual RCS leakage rate.

1.1R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Oconee Unit 1 computer repairs are expected to be extended through turnover for hardware replacement. The Loss of Computer procedure PT/O/A/0600/001A, Loss of Computer, is in progress, however an RCS Leakage Calculation has not been performed during this shift. INITIATING CUES

The Control Room SRO directs you to perform a manual RCS leakage calculation per PT/1A/0600/010 (Reactor Coolant Leakage)

Encl. 13.3 (Manual RCS Leakage Calculation Data Sheet) using the data collected below.

Manual RCS Leakage Data Parameter Initial Final Time 0015 0115 Pzr level 219.0 inches 219.5 inches Tave Indication 579.0°F 579.1°F Quench Tank Level 8 6.5 inches 8 6.5 inches LDST Level 76.7 inches 74.0 inches Power Range NI 100.0% 100.1% RCS NR Pressure 2150 psig 2150 psig Group 7 Control Rod Position 9 2.7% 9 2.7%

Admin-142 - 1.2B Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

Admin-142 Determine Time for SFP to reach 180

ºF CANDIDATE EXAMINER Admin-142 - 1.2B Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Determine Time for SFP to reach 180ºF Alternate Path:

N/A Facility JPM #:

New K/A Rating(s):

System: GEN K/A: 2.1.25 Rating: 3.9/4.2 Task Standard:

Tables in AP/1

-2/A/1700/035 (Loss of SF P Cooling And/Or Level) are used to determine total time required for SFP temperature to reach 180

ºF Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator _____ In-Plant _____ Classroom

__ X ___ Perform __X___ Simulate ____

References:

AP/1-2/A/1700/035 (Loss of SF P Cooling And/Or Level) Validation Time

15 minutes Time Critical
NO ====================================================================================

Candidate:

_______________________________________

Time Start: _____

____ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS Admin-142 - 1.2B Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

NONE Admin-142 - 1.2B Page 4 of 9 Tools/Equipment/Procedures Needed:

AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is at 100% stable Unit 1 EFPD = 278 Unit 2 EFPD = 47 Unit 2 was operating at 100% when it experienced a Unit blackout SSF has been activated for Unit 2 Unit 2 RCMUP is aligned and operating 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25 AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated Unit 1 & 2 SFP level = 0" stable Unit 1 & 2 SFP temperature = 102 ºF INITIATING CUES:

CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF

Admin-142 - 1.2B Page 5 of 9 START TIME: _______

STEP 1: 1. Refer to tables A, B, and C below.

2. ONLY one row from one table below applies
3. Check the row in Table A, B, or C that applies to current conditions, and then use Tables listed on subsequent pages of Encl 5.4, as directed, to calculate SFP heat up times. STANDARD: Candidate selects Table B and then chooses to use Table 10 based on
1. SSF Event in progress for U1 or U2 with Unit letdown going to SFP AND 2. U1 and U2 each have 177 Fuel Assemblies in RB Candidate proceeds to Table 10 (page 33 of 63)

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT Admin-142 - 1.2B Page 6 of 9 STEP 2: Determine the Time (in days) row based on direction from page 5 of 63 STANDARD: Candidate selects the lower EFPD unit and adds 20 which results in 67 days. Determine that 67 days is between 60 and 70 days on the far left column of Table 10 Based on guidance in Step 7 on Page 7 of 63, elects to use 60 days (the shorter time).

Note: Step 2 and Step 3 can be performed in any order COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 3: Determine initial Spent Fuel Pool Temperature column based on directions from page 7 of 63 Step 6

. STANDARD: Actual SFP temp = 102

ºF Temperature columns available are 100 and 105 Based on directions in step 6, elects to use the 105 (higher) column Note: Step 2 and Step 3 can be performed in any order COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT Admin-142 - 1.2B Page 7 of 9 STEP 4: Find the Time in hours based on the intersection of the 60 day row and the 105 degree column.

STANDARD: Based on the intersection of the 60 day row and the 105 degree column, determine that 16.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is the time to reach 180ºF COMMENTS: END TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME: ____________

Admin-142 - 1.2B Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Required to determine the time to reach 180

ºF 2 Required to determine the time to reach 180

ºF 3 Required to determine the time to reach 180

ºF 4 Required to determine the time to reach 180

ºF

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 is at 100% stable Unit 1 EFPD =

278 Unit 2 EFPD = 47 Unit 2 was operating at 100% when it experienced a Unit blackout SSF has been activated for Unit 2 Unit 2 RCMUP is aligned and operating 2HP-426 is being cycled to maintain Pressurizer Level as directed by AP/25 AP/1-2/A/1700/035 (Loss of SFP Cooling And/Or Level) has been initiated Unit 1 & 2 SFP level = 0" stable Unit 1 & 2 SFP temperature = 102 ºF INITIATING CUES:

CRS has directed you to utilize AP/35 Enclosure 5.4 and determine the time for Unit 1&2 SFP to reach 180 ºF

Admin-240 2R Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

Admin-2 40 Perform SG Downcomer Temperature Surveillance

CANDIDATE EXAMINER Admin-240 2R Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform SG Downcomer Temperature Surveillance Alternate Path:

N/A Facility JPM #:

Admin-23 7 K/A Rating(s):

System: Gen K/A: 2.2.12 Rating: 3.7/4.1 Task Standard:

Perform SG Downcomer Temperature Surveillance by procedure for the 1A (ONLY) SG and determine that the surveillance requirement is NOT met for either of the specified computer points

. Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator

___ __ In-Plant __ ___ Classroom __X__ Perform __X__ Simulate _____

References:

OP/1/A/1105/014 (Control Room Instrumentation Operation And Information)

Encl 4.1 (Mode 1

& 2) OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl. 4.1 9 (Channel Check Of OTSG Downcomer Temperatures)

Validation Time:

18 minutes Time Critical:

NO ====================================================================================

Candidate:

_______________________________________

Time Start: __

_______ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS Admin-240 2R Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-240 2R Page 4 of 9 Tools/Equipment/Procedures Needed:

OP/1/A/1105/014 (Control Room Instrumentation Operation And Information)

OAC Screen capture image for SG information READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Reactor power =

75%

OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl.

4.1 (Mode 1 & 2) in progress.

INITIATING CUES:

CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl.

4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature.

Admin-240 2R Page 5 of 9 START TIME: _______

STEP 1: Enclosure 4.1 (page 6 of 15)

Verify All SG Downcomer Temperature computer points agree within 3°F of each other.

IF All SG Downcomer Temperatures DO NOT agree within 3°F of each other, then perform Enclosure "Channel Check Of OTSG Downcomer Temperatures".

O1E2008 - 5 28.8 7°F O1E2009 - 53 8.97°F O1E2012 - 532.78°F O1E2013 - 53 3.65°F STANDARD: Determine that the above OAC point s do NOT agree within 3°F of each other, and perform Enclosure 4.19 "Channel Check of OTSG Downcomer Temperatures".

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 2: Step 3.1 (Enclosure 4.19) Determine saturation temperature for 1A OTSG based on power level and 1A OTSG outlet pressure as follows:

Step 3.1.1 Determine 1A OTSG outlet pressure using any one of the following computer points: O1E2281 - 88 8.5 psig O1E2283 - 88 8.5 psig O1E2031 - 88 8.5 psig O1E2032 - 88 8.5 psig STANDARD: Using the OAC determine that 1A OTSG pressure is 888.5. COMMENTS:

___ SAT

___ UNSAT Admin-240 2R Page 6 of 9 STEP 3: Step 3.1.2 Using table in Section 4, determine the 1A OTSG saturation temperature based on power level and 1A OTSG Outlet Pressure obtained in step 3.1.1. ____________ 1A OTSG saturation temperature STANDARD: Determine that 1A OTSG saturation temperature is 53 3.9ºF (533.8 - 534.0) by using the table in section 4.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4: Step 3.1.3 Compare O1E2008 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:

Step 3.1.4 IF O1E2008 SG Lower Downcomer Temperature Loop A is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable.

STANDARD: Determine that O1E2008 SG Lower Downcomer Temperature Loop A (528.87°F) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°F), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required

. COMMENTS:

CRITICAL STEP

___ SAT ___ UNSAT Admin-240 2R Page 7 of 9 STEP 5: Step 3.1.5 Compare O1E2009 SG Lower Downcomer Temperature Loop A to the 1A OTSG saturation temperature determined in step 3.1.2:

Step 3.1.6 IF O1E2009 SG Lower Downcomer Temperature Loop A is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature, then enter Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable.

STANDARD: Determine that O1E2009 SG Lower Downcomer Temperature Loop A (538.97) is NOT within +/- 4.9 °F of the 1A OTSG saturation temperature (533.9°), and entry Condition A of SLC 16.7.5 for OTSG overfill protection system inoperable is required

.

Cue: Inform the candidate that another operator will complete this procedure

. COMMENTS: END TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME: ____________

Admin-237 Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Step is required to complete the surveillance.

3 Step is required to complete the surveillance.

4 Determining that the computer points in both Step 4 and Step 5 are out of the allowable band is critical to ensure that SLC 16.7.5 Condition A is not exited prior to BOTH computer points being repaired.

5 Determining that the computer points in both Step 4 and Step 5 are out of the allowable band is critical to ensure that SLC 16.7.5 Condition A is not exited prior to BOTH computer points being repaired.

2R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Reactor power =

75% OP/1/A/1105/014 (Control Room Instrumentation Operation And Information) Encl.

4.1 (Mode 1 & 2) in progress.

INITIATING CUES:

CR SRO directs you to perform OP/1/A/1105/014 (Control Room Instrumentation Operation And

Information) Encl.

4.1 (Mode 1 & 2) on page 6 of 15 component check for the 1A SG Downcomer Temperature.

ADM IN-241 2S Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

ADMIN-241 Complete a Surveillance Evaluation (SRO ONLY)

CANDIDATE EXAMINER ADM IN-241 2S Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)

Alternate Path

N/A Facility JPM #

New K/A Rating(s)
System: G en K/A: 2.2.12 Rating: 3.7/4.1 Task Standard

Complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)

Preferred Evaluation Location

Preferred Evaluation Method
Simulator

__ ___ In-Plant ___ ___ Classroom __ X___ Perform __ X__ Simulate_ __ References

PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 2 5 of 2 6 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.9 (RCP Power Supply Verification)

PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)

Validation Time

20 min. Time Critical
No ===================================================================================

== Candidate:

_______________________________________

Time Start: ____

_____ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner: ______________________________ ___________________________________/____

_____ NAME SIGNATURE DATE =================================================================================

==== Comments ADM IN-241 2S Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS NONE ADM IN-241 2S Page 4 of 9 Tools/Equipment/Procedures Needed

PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) page 2 5 of 2 6 PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.

9 (RCP Power Supply Verification)

PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)

Surveillance Frequency List READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Time/Date =

0830 on Saturday, June 8. RCS Temperature = 298

°F. 1/0 RCP operation in progress (1A1 RCP in operation).

PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress. SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed.

Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfied because neither the 1B1 nor the 1B2 RCP has power available.

INITIATING CUE:

Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)

ADM IN-241 2S Page 5 of 9 START TIME: _______ STEP 1: Surveillance

Description:

STANDARD: Documents that this is a Tech Spec required verification of correct RCP breaker alignment of power available to the required pump this is not in operation COMMENTS: ___ SAT

___ UNSAT STEP 2: Applicable TS(s)/SLC(s)/Site Directive(s), etc.:

STANDARD: Determines that Tech Spec 3.4.5 (RCS Loops Mode 3) is applicable and documents in Step 2 COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 3: Description of discrepancy/deficiency:

STANDARD: Documents that the required RCP Breaker alignment does not exist.

NOTE: TS 3.4.5 requires that either the 1B1 or 1B2 have power available COMMENTS: ___ SAT

___ UNSAT STEP 4: Is surveillance applicable for present plant condit ions? STANDARD: Marks "yes" COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT ADM IN-241 2S Page 6 of 9 STEP 5: If surveillance is applicable, what is the latest due date for surveillance OR applicable LCO?

STANDARD: Documents that the latest due date is 0830 on Tuesday , June 11 (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from discovery) per Condition A of TS 3.4.5 COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 6: Is applicable TS(s)/SLC(s)/Site Directive(s), etc. satisfied with existing discrepancy/deficiency?

STANDARD: *Marks "no" Explains in justification that TS 3.4.5 requires both RCS loops be Operable and with no power available to the 1B1 and 1B2 RCP's, the B RCS loop is NOT operable COMMENTS: *CRITICAL STEP

___ SAT ___ UNSAT STEP 7: Support personnel/groups contacted (if any) AND information provided:

STANDARD: Candidate may indicate requesting SPOC assistance to determine why neither of the required RCP breakers are racked in however since there is no indication of mechanical failures it would not be required.

COMMENTS:

___ SAT ___ UNSAT ADM IN-241 2S Page 7 of 9 STEP 8: Describe corrective/compensatory actions being taken (procedure change, WR, PIP, etc.), and resolution date for those actions.

STANDARD: *Corrective/Compensatory Action:

Candidate should indicate that actions will commence to establish the required breaker alignment. This could be by issuing a Work Request, writing a PIP, or dispatching personnel to determine why the breakers are open and if the breakers could be racked in.

Resolution Date:

This blank may be left open at this time since the investigation is just beginning however in no case should a date and time that would result in exceeding the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time be entered.

COMMENTS:

___ SAT ___ UNSAT STEP 9: Approval: STANDARD: Signs and Dates either of the blanks provided COMMENTS: END OF TASK

___ SAT

___ UNSAT ADM IN-241 2S Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Required to determine the applicable Tech Spec 4 Required to determine if this Tech Spec is applicable in Mode 3 5 Incorrect documentation could lead to exceeding allowed time to complete Tech Spec Required Actions.

6 Required to determine if the LCO is met

2S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Time/Date = 0830 on Saturday, June 8. RCS Temperature = 298

°F. 1/0 RCP operation in progress (1A1 RCP in operation).

PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) in progress.

SR 3.4.5.2 on page 25 of 26 of PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.2 (Mode 3) is being performed.

Step 2.2 of Encl. 13.9 (RCP Power Supply Verification) is determined to NOT be satisfie d because neither the 1B1 nor the 1B2 RCP has power available.

INITIATING CUE:

Based on the above conditions, complete PT/1/A/0600/001 (Periodic Instrument Surveillance) Encl. 13.12 (Surveillance Evaluation)

Admin-30 6 3B Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

Admin-30 6 Calculate the Maximum Permissible Stay Time Within Emergency Dose Limits (EDL)

CANDIDATE EXAMINER Admin-30 6 3B Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits. Alternate Path

N/A Facility JPM #

Admin 305 K/A Rating(s)

System: Gen K/A: 2.3.4 Rating: 3.2/3.7 Task Standard
Calculate the Maximum Permissible Stay Time Within the Emergency Dose Limits.

Preferred Evaluation Location

Preferred Evaluation Method
Simulator _____ In-Plant ______ Classroom _ _X_ Perform __X__ Simulate _____ References

NSD-507 (Radiation Protection

) OMP 1-18 (Implementation Standard During Abnormal And Emergency Events

) Validation Time

20 min. Time Critical
N o =====================================================================================

Candidate: _______________________________________

Time Start: _____

____ NAME Time Finish: ________

Performance Rating

SAT ______ UNSAT ______

Performance Time __

_______

Examiner: ______________________________ ____________________________________/___

______ NAME SIGNATURE DATE

=========================================================================

= COMMENTS Admin-30 6 3B Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS NONE Admin-30 6 3B Page 4 of 8 Tools/Equipment/Procedures Needed

Calculator Note tablet READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO "A" has received 1.26 R em TEDE this year The following tasks are required to be performed:

0B# 1BTASK 2BTIME REQUIRED 3BDOSE RATE 4B 1 5BClose 3C-573 6B11 min 7B6.15 R/hr 8B 2 9BOpen 3FDW-313 10B6 min 11B18.25 R/hr 12B 3 13BOpen all Unit 3's ADVs 14B4.65 R/hr Note: Assume no dose is received while traveling between tasks.

INITIATING CUE Refer to the above information. NEO "A" has completed tasks 1 and 2 in the time required.

Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.

Admin-30 6 3B Page 5 of 8 START TIME: _______

Examiner Note: Candidate may perform these steps in a different order

however , the calculated stay time must be correct. EDL is 5 R em per event (LOCA or SGTR).

Current exposure for the year is not counted toward the Emergency Dose Limit s (EDL). STEP 1: Determine dose received while performing task 1.

STANDARD: Determine dose received while performing task 1.

6.15 R/hr X 1hr/60 min X 11 min = 1.1275 R (1.12 to 1.13 R)

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 2: Determine dose received while performing task 2.

STANDARD: Determine dose received while performing task 2.

18.2 5 R/hr X 1hr/60 min X 6 min = 1.8 25 R (1.82 to 1.83 R)

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 3: Determine dose remaining from EDLs.

STANDARD: Determine dose remaining from EDLs.

5R - 1.1275 R - 1.8 25R = 2.04 75 R (2.04 to 2.06 R)

COMMENTS:

CRITICAL STEP

___ SAT ___ UNSAT Admin-30 6 3B Page 6 of 8 STEP 4: Determine time available for the NEO to complete task 3 without exceeding EDL

. STANDARD: Stay time is calculated to be:

Available Dose

= 2.04 75 R = .44 hr X 60 min = 26.4 2 min Dose Rate 4.65 R/hr 1hr (26 to 27 Minutes

) COMMENTS: END OF TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME: ________

Admin-30 6 3B Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 Required to calculate stay time. 2 Required to calculate stay time.

3 Required to calculate stay time.

4 Required to calculate stay time.

3B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Steam Generator Tube Rupture has occurred on Unit 3 Emergency Dose Limits are in effect NEO "A" has received 1.26 R em TEDE this year The following tasks are required to be performed:

15B# 16BTASK 17BTIME REQUIRED 18BDOSE RATE 19B 1 20BClose 3C-573 21B11 min 22B6.15 R/hr 23B 2 24BOpen 3FDW-313 25B6 min 26B18.25 R/hr 27B 3 28BOpen all Unit 3's ADVs 29B4.65 R/hr Note: Assume no dose is received while traveling between tasks.

INITIATING CUE Refer to the above information. NEO "A" has completed tasks 1 and 2 in the time required.

Determine how long the NEO has to complete task 3 without exceeding his/her Emergency Dose Limits.

ADM IN-412 4S Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

ADMIN-4 12 Determine Emergency Classification and complete the initial Emergency Notification form (SRO Only)

CANDIDATE EXAMINER ADM IN-412 4S Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Determine Emergency Classification and complete the initial Emergency Notification form Alternate Path

N/A Facility JPM #
N/A K/A Rating(s)
System: G en K/A: 2.4.38 Rating: 2.4/4.4 Task Standard
Appropriate classification is determined and associated Emergency Notification Form is completed with the time critical criteria.

Preferred Evaluation Location

Preferred Evaluation Method
Simulator

__ ___ In-Plant ___ ___ Classroom __ X___ Perform __ X__ Simulate_ __ References

RP/0/B/1000/0 0 1 (Emergency Classification

) RP/0/B/1000/0 0 2 (Control Room Emergency Coordinator Procedure

) Nuclear Power Plant Emergency Notification Form 4.1.A.1 Validation Time

20 min. Time Critical
Yes ===================================================================================

==

Candidate:

_______________________________________

Time Start: ____

_____ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner: ______________________________ ___________________________________/____

_____ NAME SIGNATURE DATE

=====================================================================

==== Comments ADM IN-412 4S Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS NONE ADM IN-412 4S Page 4 of 11 Tools/Equipment/Procedures Needed

RP/0/B/1000/0 0 1 (Emergency Classification)

RP/0/B/1000/0 0 2 (Control Room Emergency Coordinator Procedure)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.

0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam

. 0806 1B SG has been isolated and RCS Temperature stabilized at 520F CETCs. 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring

. 1RIA-40 = 1,245 cps and increasing.

0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.

INITIATING CUE:

Perform the required actions of the Emergency Coordinator:

1. Determine Emergency Classification at Time = 0816 2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. When required, other operator s will maintain the Emergency Coordinator's Log and perform the duties of the Control Room Offsite Communicator.

ADM IN-412 4S Page 5 of 11 START TIME: _______ (Actual time)

STEP 1: Classify the Event STANDARD: Refer to RP/0/B/1000/01 (Emergency Classification) Enclosure 4.

1 (Fission Product Barrier Matrix)

Classify as an ALERT due to:

RCS Barriers - 4 points due to SGTR

>160 gpm Time of Classification: _________________

Examiner Note: The criteria for getting 3 points for a SGTL in one S/G and the other S/G faulted is not met because the faulted S/G (1B) has been isolated.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 2: Commence the Off-Site Notification Form

. STANDARD: Go to RP/0/B/1000/002 (Control Room Emergency Coordinator Procedure) and initiate procedure by determining symptoms for entry exist and check Step 1.1 COMMENTS: ___ SAT

___ UNSAT STEP 3: Step 2.1. STANDARD: Determine step 2.1 does not apply COMMENTS: ___ SAT ___ UNSAT ADM IN-412 4S Page 6 of 11 NOTE: State and County agencies shall be notified within 15 minutes of E

-plan declaration, Classification upgrades, and Protective Action Recommendations.

STEP 4: Step 2.2 Declare the appropriate Emergency Classification level.

Classification __ALERT_____ (UE, ALERT, SAE, GE)

Time Declared: _________

STANDARD: Declare an ALERT due to: 1A SGTR > 160 gpm ( 4 pts.) and the SG with an open path to the environment (1B SG) is NOT being fed by the affected unit nor does it contain a SG Tube Leak Time ALERT Declar ed documented in Step 1 (SAT is < Start Time + 15 minutes)

COMMENTS:

___ SAT ___ UNSAT STEP 5: Step 2.3 & 2.4 STANDARD: Determine Steps 2.3 and 2.4 do not apply COMMENTS:

___ SAT

___ UNSAT STEP 6: Step 2.5 Appoint Control Room Offsite Communicator(s) and perform the following: N/A STANDARD: Any name (real or imaginary) is acceptable.

Note: Initiating Cue indicates these actions will be performed by another operator.

COMMENTS:

___ SAT ___ UNSAT ADM IN-412 4S Page 7 of 11 STEP 7: Step 2.6 IAAT Changing plant conditions require an emergency classification upgrade, THEN Notify Offsite Communicator to complete the in

-progress notifications per RP/0/B/1000/15A, (Offsite Communications From The CR) AND Re-initiate a clean copy of this procedure for the upgraded classification and stop this procedure.

STANDARD: An Upgrade is not expected.

COMMENTS:

___ SAT

___ UNSAT STEP 8: Step 2.7 Obtain the appropriate Offsite Notification form from the Emergency Plan cart.

STANDARD: Initial ALERT form # 4.1.A.1 is selected and candidate continues to fill

-out form per the Step 2.7 substeps.

COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT ADM IN-412 4S Page 8 of 11 STEP 9: Step 2.7 (continued) 2.7.1. Ensure EAL # as determined by RP/0/B/1000/001 matches Line 4. (4.1.A.1) 2.7.2. Line 1 - Mark appropriate box "Drill" or "Actual Event" (DRILL) 2.7.3. *Line 1 - Enter Message #

(#1) 2.7.4. *Line 2 - Mark Initial (INITIAL marked) 2.7.5. *Line 6 - ('Is Occurring' marked) A. Mark "Is Occurring" if any of the following are true:

RIAs 40, 45, or 46 are increasing or in alarm If containment is breached Containment pressure

> 1 psig B. Mark "None" if none of the above is applicable.

2.7.6. *Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A ('D' mark ed) 2.7.7. *Line 8 - Mark "Stable" unless an upgrade or additional PARs are anticipated within an hour.

Refer to Enclosure 4.9, (Event Prognosis Definitions) 2.7.8. *Line 10 - Military time and date of declaration (Refer to date/time in Step 2.2) (Inser t time from STEP 1 and today's date

, military time is not critical as long as time is specific and accurate.)

2.7.9. Line 11 - If more than one unit affected, mark "All" (Unit 1 marked) 2.7.10. Line 12 - Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown (Unit 1 - 0% power, Shutdown at 0800 with today's date.)

2.7.11. Line 13 - If the OSM has no remarks, write "None" (indicate NONE) 2.7.12. If Condition "A" exists ensure following PARs are included Line 5.

A. Evacuate: Move residents living downstream of the Keowee Hydro Project dams to higher ground B. Other: Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed.

(Condition A does not exist. No PAR required)

STANDARD: Correctly fills out Emergency Notification Form in accordance with Key. COMMENTS: *CRITICAL STEP

___ SAT ___ UNSAT ADM IN-412 4S Page 9 of 11 STEP 10: Step 2.7 (Continued) 2.7.13. Line 17 - OSM signature, CURRENT Time/Date (MUST SIGN)

STANDARD: Indicate that OSM signature will be obtained on the completed Emergency Notification Form within 15 minutes of classification time recorded in step 1.

STOP TIME #2: Time for Notification __________

(SAT is < Step 1 Time + 15 minutes)

COMMENTS: END OF TASK CRITICAL STEP

ADM IN-412 4S Page 10 of 11 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 The candidate needs to be able to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes

. 8 The correct form that matches the EAL # is selected.

9 The emergency notification form is filled-out with each line entry identified as 'critical' complete and accurate.

10 This is a time critical step. The Candidate needs to complete the notification form within 15 minutes from the time the EAL was declared. (Declaration time is the time recorded in JPM step 4)

4S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.

0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1B SG appears to have two MSRVs damaged and still passing steam

. 0806 1B SG has been isolated and RCS Temperature stabilized at 520F CETCs. 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring

. 1RIA-40 = 1,245 cps and increasing.

0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. INITIATING CUE:

Perform the required actions of the Emergency Coordinator:

1. Determine Emergency Classification at Time = 0816
2. Complete appropriate Emergency Notification Form THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. When required, other operator s will maintain the Emergency Coordinator's Log and perform the duties of the Control Room Offsite Communicator.