ML13308A656: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:NRC comments on Duane Arnold 2013 Exam outline submittal.
{{#Wiki_filter:NRC comments on Duane Arnold 2013 Exam outline submittal.
Scenario 1 Event 3  
Scenario 1 Event 3 - Only the RO and SRO should receive credit for the APRM component failure. Also add TS - SRO to the Event Type column.
- Only the RO and SRO should receive credit for the APRM component failure. Also add "TS  
Scenario 1 Form ES-D-1 changed to reflect the above clarifications.
- SRO" to the Event Type column.
Scenario 2 Event 5 - Change this event into 2 events to show both the RO and BOP have independent events to respond to separate diagnoses, AOPs, and actions.
Scenario 1 Form ES
Scenario 2 Event 6 - Only the RO and SRO should receive credit for the IRM component failure.
-D-1 changed to reflect the above clarifications.
Scenario 2 Form ES-D-1 changed to reflect the above clarifications.
Scenario 2 Event 5  
Scenario 3 Event 2 - Only the RO and SRO should receive credit for the 5B dump valve component failure.
- Change this event into 2 events to show both the RO and BOP have independent events to respond to separate diagnoses, AOPs, and actions.
Scenario 3 Event 5 - Change this event into 2 events to show both the RO and BOP have independent events to respond to separate diagnoses, AOPs, and actions. If the RO does not have enough actions then only credit the BOP.
Scenario 2 Event 6  
Scenario 3 Form ES-D-1 changed to reflect the above clarifications. Note: Event 5 left as 1 event and changed to only credit the BOP and SRO with the component failure.
- Only the RO and SRO should receive credit for the IRM component failure. Scenario 2 Form ES
Change the ES-301-5 Form for the above changes.
-D-1 changed to reflect the above clarifications.
Form ES-301-5 changed to reflect the above changes.}}
Scenario 3 Event 2  
- Only the RO and SRO should receive credit for the 5B dump valve component failure.
Scenario 3 Event 5  
- Change this event into 2 events to show both the RO and BOP have independent events to respond to separate diagnoses, AOPs, and actions. If the RO does not have enough actions then only credit the BOP.
Scenario 3 Form ES
-D-1 changed to reflect the above clarifications. Note: Event 5 left as 1 event and changed to only credit the BOP and SRO with the component failure. Change the ES
-301-5 Form for the above changes.
Form ES-301-5 changed to reflect the above changes
.}}

Latest revision as of 12:51, 4 November 2019

2013 DAEC Initial License Examination Outline Submittal Comments with Resolutions
ML13308A656
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/08/2013
From:
NRC/RGN-III
To:
Duane Arnold
Randal Baker
Shared Package
ML11354A335 List:
References
Download: ML13308A656 (1)


Text

NRC comments on Duane Arnold 2013 Exam outline submittal.

Scenario 1 Event 3 - Only the RO and SRO should receive credit for the APRM component failure. Also add TS - SRO to the Event Type column.

Scenario 1 Form ES-D-1 changed to reflect the above clarifications.

Scenario 2 Event 5 - Change this event into 2 events to show both the RO and BOP have independent events to respond to separate diagnoses, AOPs, and actions.

Scenario 2 Event 6 - Only the RO and SRO should receive credit for the IRM component failure.

Scenario 2 Form ES-D-1 changed to reflect the above clarifications.

Scenario 3 Event 2 - Only the RO and SRO should receive credit for the 5B dump valve component failure.

Scenario 3 Event 5 - Change this event into 2 events to show both the RO and BOP have independent events to respond to separate diagnoses, AOPs, and actions. If the RO does not have enough actions then only credit the BOP.

Scenario 3 Form ES-D-1 changed to reflect the above clarifications. Note: Event 5 left as 1 event and changed to only credit the BOP and SRO with the component failure.

Change the ES-301-5 Form for the above changes.

Form ES-301-5 changed to reflect the above changes.