| {{#Wiki_filter:1NRR-PMDAPEm Resource From:Richardson, Michael <MJRm@pge.com> | | {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Richardson, Michael <MJRm@pge.com> |
| Sent:Thursday, August 25, 2016 2:59 PM To:Singal, Balwant Cc:Johnson, Andrew; Bailey, Janis; Skov, Jeffrey | | Sent: Thursday, August 25, 2016 2:59 PM To: Singal, Balwant Cc: Johnson, Andrew; Bailey, Janis; Skov, Jeffrey |
|
| |
|
| ==Subject:== | | ==Subject:== |
| [External_Sender] RE: PG&E Letter dat ed May 2, 2016 - 180 Day Steam Generator Report for Diablo Canyon Power Plant, Unit 1, Refueling Outage 1R19 - CAC No. | | [External_Sender] RE: PG&E Letter dat ed May 2, 2016 - 180 Day Steam Generator Report for Diablo Canyon Power Plant, Unit 1, Refueling Outage 1R19 - CAC No. |
|
| |
|
| MF7649Balwant, I received the following input from engineering regarding the clar ification on the 180 day report.
| | MF7649 Balwant, I received the following input from engineering regarding the clar ification on the 180 day report. |
|
| |
|
| The tube count difference you discussed reflects the difference in the number of tubes (16) indicating antivibration bar (AVB) wear as detected using the bobbin probe (termed a "bobbin call") and the number of tubes (15) for which the AVB bobbin call was confirmed using the "+Point" probe. That is, there were a total of 16 tubes with AVB bobbin calls, 8 of which were in steam generator (SG) 12. Each AVB bobbin call was inspected using the +Point probe and one tube, 69-21 in SG 12, was found to be NDF (no degradation found) with +Point. | | The tube count difference you discussed reflects the difference in the number of tubes (16) indicating antivibration bar (AVB) wear as detected using the bobbin probe (termed a "bobbin call") and the number of tubes (15) for which the AVB bobbin call was confirmed using the "+Point" probe. That is, there were a total of 16 tubes with AVB bobbin calls, 8 of which were in steam generator (SG) 12. Each AVB bobbin call was inspected using the +Point probe and one tube, 69-21 in SG 12, was found to be NDF (no degradation found) with +Point. |
|
---|
Category:E-Mail
MONTHYEARML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mother'S for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-21-046, Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System 2024-09-06
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Richardson, Michael <MJRm@pge.com>
Sent: Thursday, August 25, 2016 2:59 PM To: Singal, Balwant Cc: Johnson, Andrew; Bailey, Janis; Skov, Jeffrey
Subject:
[External_Sender] RE: PG&E Letter dat ed May 2, 2016 - 180 Day Steam Generator Report for Diablo Canyon Power Plant, Unit 1, Refueling Outage 1R19 - CAC No.
MF7649 Balwant, I received the following input from engineering regarding the clar ification on the 180 day report.
The tube count difference you discussed reflects the difference in the number of tubes (16) indicating antivibration bar (AVB) wear as detected using the bobbin probe (termed a "bobbin call") and the number of tubes (15) for which the AVB bobbin call was confirmed using the "+Point" probe. That is, there were a total of 16 tubes with AVB bobbin calls, 8 of which were in steam generator (SG) 12. Each AVB bobbin call was inspected using the +Point probe and one tube, 69-21 in SG 12, was found to be NDF (no degradation found) with +Point.
So the bobbin call remained, but the tube was not counted among the tubes with AVB wear.
This explains the "16 tubes" reported on pp. 5 (top of page) and 6 (second full paragraph). The 16 tube count is based on AVB bobbin calls. The tube count numbers in Table 4 are correct based on +Point (15 affected tubes). Table 4 does not include a 5% bobbin call at AV4 in SG 12 tube 69-21 which was NDF with +Point.
Please let me know if you have an y additional questions or concerns.
Michael Richardson Supervisor, Regulatory Services Pacific Gas
& Electric Company Diablo Canyon Power Plant Office: 805.545.4557 l Cell: 805-440-3447 l email: mjrm@pge.com From: Singal, Balwant [mailto:Balwant.Singal@nrc.gov
] Sent: Monday, August 22, 2016 4:47 AM To: Richardson, Michael Cc: Johnson, Andrew
Subject:
PG&E Letter dated May 2, 2016 - 180 Day Steam Generator Report for Diablo Canyon Power Plant, Unit 1, Refueling Outage 1R19 - CAC No. MF7649 This is an EXTERNAL EMAIL. Stop and think before clicking links or opening attachments.
- By letter dated May 2, 2016 (Agencywide Document s Access and Management System (ADAMS) Accession No. ML16123A333), Pacific gas and Electric Company submitted 180 Day Steam Generator (SG) Report for Diablo Canyon Power Plant, Unit 1, Refueling Outage 1R19. The U.S. Nuclear Regulatory Commission (NRC) staff has the following clarifying question:
At various places in the May 2, 2016 letter, references are made to 15 and 16 tubes being found with wear that resulted from interaction with anti-vibration bars (AVBs) (e.g., pages 5 and 6 of the letter).
The SG inspections performed in 1R16 found an AVB wear indication in the tube in row 95 column 57 in SG 1-3. This tube is also included in Table 4 of the report from 1R19, yet Table 4 only lists 15 tubes.
Please clarify the number of tubes found with AVB wear in 1R19.
2Please advise if a conference is needed to discuss this question with the NRC staff. An e-mail response providing the clarifying information will be acceptable for now. We will advise you if the response needed to be submitted on docket.
Your response by August 25, 2016 will be highly appreciated.
Thanks. Balwant K. Singal Senior Project Manager (Diablo Canyon)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222
Hearing Identifier: NRR_PMDA Email Number: 3017 Mail Envelope Properties (926C8F6F197B0D4F99BF6E3D342F5CA79F748AC8)
Subject:
[External_Sender] RE: PG&E Letter dated May 2, 2016 - 180 Day Steam Generator Report for Diablo Canyon Power Plant, Unit 1, Refueling Outage 1R19 - CAC No. MF7649 Sent Date: 8/25/2016 2:59:04 PM Received Date: 8/25/2016 2:59:14 PM From: Richardson, Michael Created By: MJRm@pge.com Recipients: "Johnson, Andrew" <Andrew.Johnson@nrc.gov> Tracking Status: None "Bailey, Janis" <JxDj@pge.com> Tracking Status: None "Skov, Jeffrey" <JMSP@pge.com>