ML17223B106: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,ACCELERATED DISTRIBUTION DEMONSTTION SYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9102260040 DOC.DATE:
{{#Wiki_filter:,ACCELERATED DISTRIBUTION DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9102260040 DOC.DATE: 91/02/14 NOTARIZED:
91/02/14NOTARIZED:
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPower6LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION SAGER,D.A.
Florida Power Sr Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
FloridaPowerSrLightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
Forwardsmonthlyoperating reptsforJan1991forStLucieUnits1626revisedreptsforSept-Dec1990.DISTRIBUTION CODE:IE24DCOPIESRECEIVEDLTRENCLSIZE:=.TITLE:MonthlyOperating Report(perTechSpecs)NOTES:DOCKET0500033505000389"RDRECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:
Forwards monthly operating repts for Jan 1991 for St Lucie Units 1 6 2 6 revised repts for Sept-Dec 1990.DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE:=.TITLE: Monthly Operating Report (per Tech Specs)NOTES: DOCKET 05000335 05000389"R D RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DL LPEB10 EXTERNAL EGGG BRYCE i J H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 D D'S R D NOTE TO ALL"RIDS" RECIPIENTS:
ACRSAEOD/DSP/TPAB NRR/DLLPEB10EXTERNALEGGGBRYCEiJHNSICCOPIESLTTRENCL331110101111111111RECIPIENT IDCODE/NAME PD2-2PDAEOD/DOAIRMTECHADVNRR/DOEA/OEAB RGN2NRCPDRCOPIESLTTRENCL111122111111DD'SRDNOTETOALL"RIDS"RECIPIENTS:
~~,~~A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 P.O.Box 128, Ft.Pierce, FL 349544128 4 1991 L-91-47 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
~~,~~ADDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1991 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.There was a calculation error in line 23 in the Unit 1 October Report, which was carried through December.Also the same error was made in the Unit 2 report for the months of September and December.These errors have been corrected and the corrected copies are attached to this report.Very truly yours, D.A.S ger Vice P esident St.ie Plant DAS:JJB:kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL f350 a9102260040 910l31<PDR ADOCK 05000335'R'DR an FPL Group company}}
LTTR26ENCL26 P.O.Box128,Ft.Pierce,FL349544128 41991L-91-4710CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Gentlemen:
Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortAttachedaretheJanuary1991Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Therewasacalculation errorinline23intheUnit1OctoberReport,whichwascarriedthroughDecember.
AlsothesameerrorwasmadeintheUnit2reportforthemonthsofSeptember andDecember.
Theseerrorshavebeencorrected andthecorrected copiesareattachedtothisreport.Verytrulyyours,D.A.SgerVicePesidentSt.iePlantDAS:JJB:kw cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantAttachments DAS/PSLf350a9102260040 910l31<PDRADOCK05000335'R'DRanFPLGroupcompany}}

Revision as of 17:32, 7 July 2018

Forwards Monthly Operating Repts for Jan 1991 for St Lucie Units 1 & 2 & Revised Repts for Sept-Dec 1990
ML17223B106
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/14/1991
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17223B107 List:
References
L-91-47, NUDOCS 9102260040
Download: ML17223B106 (2)


Text

,ACCELERATED DISTRIBUTION DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9102260040 DOC.DATE: 91/02/14 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power Sr Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating repts for Jan 1991 for St Lucie Units 1 6 2 6 revised repts for Sept-Dec 1990.DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE:=.TITLE: Monthly Operating Report (per Tech Specs)NOTES: DOCKET 05000335 05000389"R D RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DL LPEB10 EXTERNAL EGGG BRYCE i J H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 D D'S R D NOTE TO ALL"RIDS" RECIPIENTS:

~~,~~A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 P.O.Box 128, Ft.Pierce, FL 349544128 4 1991 L-91-47 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1991 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.There was a calculation error in line 23 in the Unit 1 October Report, which was carried through December.Also the same error was made in the Unit 2 report for the months of September and December.These errors have been corrected and the corrected copies are attached to this report.Very truly yours, D.A.S ger Vice P esident St.ie Plant DAS:JJB:kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL f350 a9102260040 910l31<PDR ADOCK 05000335'R'DR an FPL Group company