ML15014A270: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713 January 12, 2015 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA  18603-0467
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713  
 
January 12, 2015 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA  18603-0467  


==SUBJECT:==
==SUBJECT:==
SENIOR REACTOR AND REACTOR OPERATOR RETAKE EXAMINATIONS -  SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
SENIOR REACTOR AND REACTOR OPERATOR RETAKE EXAMINATIONS -  SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2  


==Dear Mr. Rausch:==
==Dear Mr. Rausch:==
In a telephone conversation on December 11, 2014, between Mr. D. Jackson, Chief, Operations Branch, and Mr. C. Goff, Training Manager, arrangements were made for the administration of retake licensing examinations at Susquehanna Steam Electric Station, during the week of January 19, 2015. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff previously furnished the written and operating test outlines, and examination and supporting reference materials on December 19, 2014. 


In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
In a telephone conversation on December 11, 2014, between Mr. D. Jackson, Chief, Operations Branch, and Mr. C. Goff, Training Manager, arrangements were made for the administration of retake licensing examinations at Susquehanna Steam Electric Station, during the week of
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
 
January 19, 2015.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
Your staff previously furnished the written and operating test outlines, and examination and supporting reference materials on December 19, 2014. 
 
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
 
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  
 
T. Rausch 2


T. Rausch 2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.   
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.   


This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by electronic mail to infocollects@nrc.gov
; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC  20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  
Office of Management and Budget, Washington, DC  20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306. Sincerely,  
 
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html
.
Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.
Sincerely,  
 
  /RA/
  /RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-387, 50-388 License Nos.: NPF-14, NPF-22  
Donald E. Jackson, Chief  
 
Operations Branch  
 
Division of Reactor Safety Docket Nos.: 50-387, 50-388 License Nos.: NPF-14, NPF-22  


cc: Distribution via ListServ  
cc: Distribution via ListServ  


T. Rausch 2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.   
T. Rausch 2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.   
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by electronic mail to infocollects@nrc.gov
; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC  20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays
 
a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
 
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html
. Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.
 
Sincerely,
/RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
 
Docket Nos.: 50-387, 50-388 License Nos.: NPF-14, NPF-22 cc: Distribution via ListServ Distribution: See Next Page.
 
DOCUMENT NAME: G:\DRS\Operations Branch\FISH\Susq retake examltr phone conversation Letter.docx ADAMS PKG:  ML 14350A011    ADAMS ACCESSION NO.: ML15014A20  SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB  NAME CBixler/CB TFish/TF DEJackson/DEJ  DATE 01/12/2015 01/12/2015 01/12/2015  OFFICIAL RECORD COPY T. Rausch 3 Distribution w/encl: (via e-mail) D. Dorman, RA (R1ORAMAIL Resource)
D. Lew, DRA (R1ORAMAIL Resource)
H. Nieh, DRP (R1DRPMAIL Resource)
M. Scott, DRP (R1DRPMAIL Resource) R. Lorson, DRS (R1DRSMAIL Resource)
J. Trapp, DRS (R1DRSMAIL Resource)
F. Bower, DRP S. Barber, DRP A. Turilin, DRP 
 
B. Lin, DRP J. Greives, DRP, SRI J. Heinly, DRP, Acting SRI    (10-19-14 to 1-17-15)
T. Daun, DRP, RI A. Gould, DRP, AA
 
K. MorganButler, RI, OEDO
 
C. Bixler, DRS T. Fish, DRS D. Jackson, DRS RidsNrrPMSusquehanna Resource


This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
RidsNrrDorlLpl1-2 Resource ROPreports Resource}}
Office of Management and Budget, Washington, DC  20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html. Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.
Sincerely,  /RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-387, 50-388 License Nos.: NPF-14, NPF-22 cc: Distribution via ListServ Distribution: See Next Page.
DOCUMENT NAME: G:\DRS\Operations Branch\FISH\Susq retake examltr phone conversation Letter.docx ADAMS PKG:  ML 14350A011    ADAMS ACCESSION NO.: ML15014A20  SUNSI Review  Non-Sensitive    Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB  NAME CBixler/CB TFish/TF DEJackson/DEJ  DATE 01/12/2015 01/12/2015 01/12/2015  OFFICIAL RECORD COPY T. Rausch 3  Distribution w/encl: (via e-mail) D. Dorman, RA (R1ORAMAIL Resource) D. Lew, DRA  (R1ORAMAIL Resource) H. Nieh, DRP    (R1DRPMAIL Resource) M. Scott, DRP      (R1DRPMAIL Resource) R. Lorson, DRS    (R1DRSMAIL Resource) J. Trapp, DRS      (R1DRSMAIL Resource) F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP J. Greives, DRP, SRI J. Heinly, DRP, Acting SRI    (10-19-14 to 1-17-15) T. Daun, DRP, RI A. Gould, DRP, AA K. MorganButler, RI, OEDO C. Bixler, DRS T. Fish, DRS D. Jackson, DRS RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource}}

Revision as of 06:25, 1 July 2018

Senior Reactor and Reactor Operator Retake Examinations - Susquehanna Steam Electric Station, Units 1-2
ML15014A270
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/12/2015
From: Jackson D E
Operations Branch I
To: Rausch T S
Susquehanna
Jackson D
Shared Package
ML14350A011 List:
References
3150-0090, NUREG-1021
Download: ML15014A270 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

January 12, 2015 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603-0467

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR RETAKE EXAMINATIONS - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

Dear Mr. Rausch:

In a telephone conversation on December 11, 2014, between Mr. D. Jackson, Chief, Operations Branch, and Mr. C. Goff, Training Manager, arrangements were made for the administration of retake licensing examinations at Susquehanna Steam Electric Station, during the week of

January 19, 2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

Your staff previously furnished the written and operating test outlines, and examination and supporting reference materials on December 19, 2014.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

T. Rausch 2

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html

.

Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief

Operations Branch

Division of Reactor Safety Docket Nos.: 50-387, 50-388 License Nos.: NPF-14, NPF-22

cc: Distribution via ListServ

T. Rausch 2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays

a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html

. Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.

Sincerely,

/RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety

Docket Nos.: 50-387, 50-388 License Nos.: NPF-14, NPF-22 cc: Distribution via ListServ Distribution: See Next Page.

DOCUMENT NAME: G:\DRS\Operations Branch\FISH\Susq retake examltr phone conversation Letter.docx ADAMS PKG: ML 14350A011 ADAMS ACCESSION NO.: ML15014A20 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/CB TFish/TF DEJackson/DEJ DATE 01/12/2015 01/12/2015 01/12/2015 OFFICIAL RECORD COPY T. Rausch 3 Distribution w/encl: (via e-mail) D. Dorman, RA (R1ORAMAIL Resource)

D. Lew, DRA (R1ORAMAIL Resource)

H. Nieh, DRP (R1DRPMAIL Resource)

M. Scott, DRP (R1DRPMAIL Resource) R. Lorson, DRS (R1DRSMAIL Resource)

J. Trapp, DRS (R1DRSMAIL Resource)

F. Bower, DRP S. Barber, DRP A. Turilin, DRP

B. Lin, DRP J. Greives, DRP, SRI J. Heinly, DRP, Acting SRI (10-19-14 to 1-17-15)

T. Daun, DRP, RI A. Gould, DRP, AA

K. MorganButler, RI, OEDO

C. Bixler, DRS T. Fish, DRS D. Jackson, DRS RidsNrrPMSusquehanna Resource

RidsNrrDorlLpl1-2 Resource ROPreports Resource