{{#Wiki_filter:Alexander, Ryanmý::.From: Haire, Mark Sent: Tuesday, July 12, 2011 7:46 AM To: ' Kennedy, Kriss; Clark, Jeff; Vegel1 Anton; Caldwell, Robert; Howell, Linda; Alexander, Ryan;Kirkland, John;, Az ua,, Ray Cc: Farnholtz, Thomas
==Subject:==
FYI: FW: Incident Commander Report Att:achments:.
7-12-11 Nights.docx...
From: WEAVERDAVID E [mailto:d eaveraDOd.cdml Sent,:Tuesday, July 12, 2011 5:03 AM To, FCS:Flood Incident Commander Reports; R4 IRC; Haire, Mark
==Subject:==
Incident Commander Report IC Report for 7-12-2011 (night5) attached.Thaniks, Dayid E. Weaver Work Week Manager Forlt Calhoun Nuclear:Station Sail Stop: :FC.1-2 Omaha fPublic.Power District 961,10 Power.Lane:
Blair NE. 68008 (work) 402-533-6848.
~'(Cell)F(fax, 40?-533-6940 7I..ae~-... ... ...()()' .... ;',~ ~~~~~ ~~~ ~~~~ .. ......
.. .: .! i.[i~.Týis e-mail c Omaha Public Power D' c fidential and proprictary n aind is for use:only bylthe in ed recipi t. Unless explici stated othe *se, this e-mail is n a contract:oe amnendmeint, :nor accep nce. If you are n the intend recipient you are n ified that d osing, copying, distri ting ortaking any ction in reliance on t ents of this information is str rohibited.
information in this record was deleted in accordance with the Fr dom of Information , e x e m pi ORAM Color: Green SPPP Shutdown Condition:
1 but elevated risk due: to Time to Boil -Cavity: 40 hours______ Station flooding T t 8 o ln~dustrial:
Safet,:......:
: 1) The two person rule is in effect for working or traversing in high flood: Waters.2) Contact Mike Godfrey and Brian Kramer for all non-routine dayshift switchyard entries.3) Maintenance Shop cross path secured with red tape due to column sinking. Requires bypassing through:the Machine Shop. Safety Glasses required for passage. Safety glasses staged at both doors to the Machine Shop.4) Do not park in or block reserved parking locations in the parking lot..Also, only on shift staff andpersonnel directly supporting the flooding efforts/priorities are to park in new:parking lot at the top:of the hill:.:All others are to park at Blair High School and use the shuttle bus.5) PA Clean-up Spray Team members: Long sleeve shirs and. goggles required as designated by supervisor.
Normal PPE for all other workers.Radiological Safety: The portal radiation monitor at the southRsecurity exit point has-been restored ti6service.
Please ensure you:stop and pause in the monitor on your way out of the Protected Area._________
LANJTITATUS
~ ~ ~3,45 kV Status: Available I161 kV:Status; Available DG1 Status: Available DG2 Status:ý Available:.
Significant Bus / MCC Outages: Buses 1B4A __:_______:_:_____________
Containment Closure Status: Still set for heavy loads .Containment Tempi 80 OF Reactor/Cavity Water Level: 1036' 6.5' River Level: 1005' 11" (AOCP-01)Significant Equipment Unavalable:
AC-3B, VA-64B, Swit c.I hgear RIoo A/C VA-89 .*...Areas and Equipment protected for Spent Fuel Pool, Shutdown Cooling, and Containment Closure'.: Room5.5.4Spent Fiuel Pool Cooling components" Room:13 & 14, -, Shutdown Cooling Components
* Room 15A- Shutdown Cooling Comiiponents." Room 18- Raw:Water/CCW Heat exchanger AC-D '" Room 69 -Component Cooling Water Pump AC-3C* East & West Switchgear:Room
-:Bus 1A3 DG-1 Room:63 -:Emergency Generator DG-1 Intake Structure
-Raw Water Pump AC-10D, "E" gate/screen, AC-12B RW Strainer, FP-1 B, Diesel Fire Pump, CW-16B VA-3A, Containment Filtering Unit Room 21 -Shutdown Cooling Corridor 26 by Boric Acid Tanks -Boric Acid and Makeup Flow paths (includes MCCs)Corridor 4 -Boric Acid and Makeup Flow paths (includes MCCs)" Containment
-Boric Acid and Makeup Flow paths Upper Electrical Penetration Room -Boric Acid and Makeup Flow paths (includes MCCs)* Switchyard 345 KV Breakers 5 and 6" Transformers T1A-1 and T1A-2 9 Aqua Dam Protected to 6'- Spotter required within 6'. Pump crews and inspections are exempt. IC and SM approval required.
0 U U a 0 Continued pump down of the prot -ected area.Continued pump down of therailroad siding. Placed electric pump in PA outside of railroad siding door.Continued cleanup activities.
Concentrated on south side of Service Building.Added another pump to the 161:*kVberm (east side).Monitored water intrusion inside the securit building.
Moved hoses inside PA to connect to green 6 inch pump. Was not able to get suction established for the pump.Installed water proof enclosure boxes around 13.8 kV transformers in PA. I.Place VA-89 in service. (EMIOPS)a.Continue pump down of the protected area. (NPS)SContinue pump down of the railroad siding. (CY/RP/OPS)
Continue cleanup activities. (NPS/SFM)Monitor:water intrusion inside the security building. (NPS)Finalize plan/schedulelfor remaining Bus 1B4A RCA extent of condition inspections. (Eng)Waterproofing of :conduits and restore:CKT.
121 .(13.8KV to the plant) (S~ub.station)
Complete sandbagging f water prf enclosure boxes aroundd 13.8 kVtransformers in PA. (SFM)V LEAD WORK EXPECTED ..........
TASK GROUP COMPLETION COMMENTS____ ___ ___ ____ ___ ___ ___ ____ ___ ___ ___DATE Finalize plan/schedule for remaining Bus (Eng) July 12 Time frames need further 1B4A RCA extent of condition inspections.
review and approval.(Eng)Restore CKT 121 (13.8KV to the plant) Sub Station July 12 Requires a colvert installed/__ _ to allow sealing a conduit.Rbmove 2" diameter sample vessel that CY/Maint/Ops TBD dropped into FO-1 R eseal North Cable Tray Chase in Security Eng/Bill July 14 WR 166763 Need 100 Sand Building Phillips/Maint bags filled and Furmanite-material.
Prereq work to start on July 11 In ;stall Temp. Mod. for MCC 4A2 EM July 19 EC#. Parts hold. Breaker scheduled arrival is 7/15 VA-89/90:
Remove, restore and elevate SFM July 22 EC 53400 being processed by DEN for the elevated stands.Jim Shores needs EM support for pulling new Comm/EM TBD WR 166809/parts are on phone cable into the Security Building order Transition Plan for Aqua Dam monitoring and TBD July 21 Transition aqua dam filling, monitoring and filling....._ ..operations to support.___ ....._.___,'_:
..._. .::::::: : ::;...,personnel
.. ..-j'='- .'ýFl6od:barriers installdýeDper::
PE-RR-AE-1 001, with thefollowing
:eviaitions:..
AE 1007-1 door to Radwaste Building (power door) is removed. NOTE: NO POWER from MCC-4A2.AE 1007-9 door from RCA to Chemistry is removed.AE 1007-19 door -normal RP access point is removed.AE 1011-1 door from Turbine Mezzanine to Coordinator 52 is removed.AE-28-1 011-4 south door switchgear room for emergency switchgear exit AE Intake structure "trash rack" outlet is removed for cell cleaning work.SD-127, 128 -Maintenance Shop drains to Lift Station #1 -open VD-681, 682 -Switchgear Room HVAC drains to TB Sump -open Other 1007' barriers can be removed to allow work access with authorization from SM. All 1007' barriers wifI be re-installed when river level reaches 1006' 9" and rising, or when directed by the SM.
*Level A R21-44 Loss of 1 14A -Owner: Steve Clayton. RCA in progress.* Intake Sicreen sand in issues -HIT formed under CR 2011-5750
-Ken Erdman lead.Steve Gebers has the lead to transition from Coops to Bartlett personnel for Pump/Berm Watch Team members." Maintenance on failed pumps/generators appears to be due to sand or dirt in the gas. Be cautious that gas cans do not become con with dirt and ssand." Spare B.5.b Fire Truck from Fort Calhoun Volunteer Fire Dept located onsitel. Supply hose in rack along walkway to:King Tut blocks. n~,i~is lEo httk V91,ul fis isected y TianspoitatiohýDepa iment.e iBottled 'water is stored in asealand container.at the top of the hill. Bring into PA as needed.* Shift Manager and IC will continue to monitorn river levels and utilize AOP-1, EPIP-TSC-2 and PE-RR-AE-1 001 as the:.principle governing documents.
NOTE: New Revision to EPIP-TSC-2 issued on 7-01-11 for alternate filling of D/G fuel oil.If communications or ERDS is lost in the. Control Room or TSC; Incident Commander is to call NRC Senior Resident Inspector and the NRC operations center:(per AOP).Use controls in place for boat safety -Need supervisor brief before getti-ng::
boat keys from Incident Commander.
* Spare gas generators are ýstaged on theTurbine Deck. Spare gas pumps: are' in the Maintenance .Shop.}}

Revision as of 20:49, 30 July 2018

Email from Mark Haire to Kriss Kennedy... Ray Azua, Subject: Fyi: FW: Incident Commander Report
ML12019A333
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/12/2011
From: Haire M S
NRC Region 4
To: Alexander R L, Azua R V, Caldwell R K, Clark J A, Kennedy K M, Kirkland J C, Anton Vegel
NRC Region 4
References
FOIA/PA-2011-0339
Download: ML12019A333 (4)


Text

Alexander, Ryanmý::.From: Haire, Mark Sent: Tuesday, July 12, 2011 7:46 AM To: ' Kennedy, Kriss; Clark, Jeff; Vegel1 Anton; Caldwell, Robert; Howell, Linda; Alexander, Ryan;Kirkland, John;, Az ua,, Ray Cc: Farnholtz, Thomas

Subject:

FYI: FW: Incident Commander Report Att:achments:.

7-12-11 Nights.docx...

From: WEAVERDAVID E [mailto:d eaveraDOd.cdml Sent,:Tuesday, July 12, 2011 5:03 AM To, FCS:Flood Incident Commander Reports; R4 IRC; Haire, Mark

Subject:

Incident Commander Report IC Report for 7-12-2011 (night5) attached.Thaniks, Dayid E. Weaver Work Week Manager Forlt Calhoun Nuclear:Station Sail Stop: :FC.1-2 Omaha fPublic.Power District 961,10 Power.Lane:

Blair NE. 68008 (work) 402-533-6848.

~'(Cell)F(fax, 40?-533-6940 7I..ae~-... ... ...()()' .... ;',~ ~~~~~ ~~~ ~~~~ .. ......

.. .: .! i.[i~.Týis e-mail c Omaha Public Power D' c fidential and proprictary n aind is for use:only bylthe in ed recipi t. Unless explici stated othe *se, this e-mail is n a contract:oe amnendmeint, :nor accep nce. If you are n the intend recipient you are n ified that d osing, copying, distri ting ortaking any ction in reliance on t ents of this information is str rohibited.

information in this record was deleted in accordance with the Fr dom of Information , e x e m pi ORAM Color: Green SPPP Shutdown Condition:

1 but elevated risk due: to Time to Boil -Cavity: 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />s______ Station flooding T t 8 o ln~dustrial:

Safet,:......:

1) The two person rule is in effect for working or traversing in high flood: Waters.2) Contact Mike Godfrey and Brian Kramer for all non-routine dayshift switchyard entries.3) Maintenance Shop cross path secured with red tape due to column sinking. Requires bypassing through:the Machine Shop. Safety Glasses required for passage. Safety glasses staged at both doors to the Machine Shop.4) Do not park in or block reserved parking locations in the parking lot..Also, only on shift staff andpersonnel directly supporting the flooding efforts/priorities are to park in new:parking lot at the top:of the hill:.:All others are to park at Blair High School and use the shuttle bus.5) PA Clean-up Spray Team members: Long sleeve shirs and. goggles required as designated by supervisor.

Normal PPE for all other workers.Radiological Safety: The portal radiation monitor at the southRsecurity exit point has-been restored ti6service.

Please ensure you:stop and pause in the monitor on your way out of the Protected Area._________

LANJTITATUS

~ ~ ~3,45 kV Status: Available I161 kV:Status; Available DG1 Status: Available DG2 Status:ý Available:.

Significant Bus / MCC Outages: Buses 1B4A __:_______:_:_____________

Containment Closure Status: Still set for heavy loads .Containment Tempi 80 OF Reactor/Cavity Water Level: 1036' 6.5' River Level: 1005' 11" (AOCP-01)Significant Equipment Unavalable:

AC-3B, VA-64B, Swit c.I hgear RIoo A/C VA-89 .*...Areas and Equipment protected for Spent Fuel Pool, Shutdown Cooling, and Containment Closure'.: Room5.5.4Spent Fiuel Pool Cooling components" Room:13 & 14, -, Shutdown Cooling Components

  • Room 15A- Shutdown Cooling Comiiponents." Room 18- Raw:Water/CCW Heat exchanger AC-D '" Room 69 -Component Cooling Water Pump AC-3C* East & West Switchgear:Room

-:Bus 1A3 DG-1 Room:63 -:Emergency Generator DG-1 Intake Structure

-Raw Water Pump AC-10D, "E" gate/screen, AC-12B RW Strainer, FP-1 B, Diesel Fire Pump, CW-16B VA-3A, Containment Filtering Unit Room 21 -Shutdown Cooling Corridor 26 by Boric Acid Tanks -Boric Acid and Makeup Flow paths (includes MCCs)Corridor 4 -Boric Acid and Makeup Flow paths (includes MCCs)" Containment

-Boric Acid and Makeup Flow paths Upper Electrical Penetration Room -Boric Acid and Makeup Flow paths (includes MCCs)* Switchyard 345 KV Breakers 5 and 6" Transformers T1A-1 and T1A-2 9 Aqua Dam Protected to 6'- Spotter required within 6'. Pump crews and inspections are exempt. IC and SM approval required.

0 U U a 0 Continued pump down of the prot -ected area.Continued pump down of therailroad siding. Placed electric pump in PA outside of railroad siding door.Continued cleanup activities.

Concentrated on south side of Service Building.Added another pump to the 161:*kVberm (east side).Monitored water intrusion inside the securit building.

Moved hoses inside PA to connect to green 6 inch pump. Was not able to get suction established for the pump.Installed water proof enclosure boxes around 13.8 kV transformers in PA. I.Place VA-89 in service. (EMIOPS)a.Continue pump down of the protected area. (NPS)SContinue pump down of the railroad siding. (CY/RP/OPS)

Continue cleanup activities. (NPS/SFM)Monitor:water intrusion inside the security building. (NPS)Finalize plan/schedulelfor remaining Bus 1B4A RCA extent of condition inspections. (Eng)Waterproofing of :conduits and restore:CKT.

121 .(13.8KV to the plant) (S~ub.station)

Complete sandbagging f water prf enclosure boxes aroundd 13.8 kVtransformers in PA. (SFM)V LEAD WORK EXPECTED ..........

TASK GROUP COMPLETION COMMENTS____ ___ ___ ____ ___ ___ ___ ____ ___ ___ ___DATE Finalize plan/schedule for remaining Bus (Eng) July 12 Time frames need further 1B4A RCA extent of condition inspections.

review and approval.(Eng)Restore CKT 121 (13.8KV to the plant) Sub Station July 12 Requires a colvert installed/__ _ to allow sealing a conduit.Rbmove 2" diameter sample vessel that CY/Maint/Ops TBD dropped into FO-1 R eseal North Cable Tray Chase in Security Eng/Bill July 14 WR 166763 Need 100 Sand Building Phillips/Maint bags filled and Furmanite-material.

Prereq work to start on July 11 In ;stall Temp. Mod. for MCC 4A2 EM July 19 EC#. Parts hold. Breaker scheduled arrival is 7/15 VA-89/90:

Remove, restore and elevate SFM July 22 EC 53400 being processed by DEN for the elevated stands.Jim Shores needs EM support for pulling new Comm/EM TBD WR 166809/parts are on phone cable into the Security Building order Transition Plan for Aqua Dam monitoring and TBD July 21 Transition aqua dam filling, monitoring and filling....._ ..operations to support.___ ....._.___,'_:

..._. .::::::: : ::;...,personnel

.. ..-j'='- .'ýFl6od:barriers installdýeDper::

PE-RR-AE-1 001, with thefollowing

eviaitions:..

AE 1007-1 door to Radwaste Building (power door) is removed. NOTE: NO POWER from MCC-4A2.AE 1007-9 door from RCA to Chemistry is removed.AE 1007-19 door -normal RP access point is removed.AE 1011-1 door from Turbine Mezzanine to Coordinator 52 is removed.AE-28-1 011-4 south door switchgear room for emergency switchgear exit AE Intake structure "trash rack" outlet is removed for cell cleaning work.SD-127, 128 -Maintenance Shop drains to Lift Station #1 -open VD-681, 682 -Switchgear Room HVAC drains to TB Sump -open Other 1007' barriers can be removed to allow work access with authorization from SM. All 1007' barriers wifI be re-installed when river level reaches 1006' 9" and rising, or when directed by the SM.

  • Level A R21-44 Loss of 1 14A -Owner: Steve Clayton. RCA in progress.* Intake Sicreen sand in issues -HIT formed under CR 2011-5750

-Ken Erdman lead.Steve Gebers has the lead to transition from Coops to Bartlett personnel for Pump/Berm Watch Team members." Maintenance on failed pumps/generators appears to be due to sand or dirt in the gas. Be cautious that gas cans do not become con with dirt and ssand." Spare B.5.b Fire Truck from Fort Calhoun Volunteer Fire Dept located onsitel. Supply hose in rack along walkway to:King Tut blocks. n~,i~is lEo httk V91,ul fis isected y TianspoitatiohýDepa iment.e iBottled 'water is stored in asealand container.at the top of the hill. Bring into PA as needed.* Shift Manager and IC will continue to monitorn river levels and utilize AOP-1, EPIP-TSC-2 and PE-RR-AE-1 001 as the:.principle governing documents.

NOTE: New Revision to EPIP-TSC-2 issued on 7-01-11 for alternate filling of D/G fuel oil.If communications or ERDS is lost in the. Control Room or TSC; Incident Commander is to call NRC Senior Resident Inspector and the NRC operations center:(per AOP).Use controls in place for boat safety -Need supervisor brief before getti-ng::

boat keys from Incident Commander.

  • Spare gas generators are ýstaged on theTurbine Deck. Spare gas pumps: are' in the Maintenance .Shop.