ML20198E802: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, ,-----_-------------- -_ --_--_-_-- _ _ _ _ _ | {{#Wiki_filter:,,-----_-------------- -_ --_--_-_-- _ _ _ _ _ | ||
? | |||
Dr. Gunter Kegel, Director | Dr. Gunter Kegel, Director July 31, 1997 Radiation Laboratcry University of Massachusetts Lowell One University Avenue Lowell, Massachusetts 01854 | ||
==SUBJECT:== | ==SUBJECT:== | ||
ISSUANCE OF ORDER MODIFYING LICENSE NO. R-125 TO CONVERT FROM | ISSUANCE OF ORDER MODIFYING LICENSE NO. R-125 TO CONVERT FROM J | ||
HIGH T0 LOW-ENRICHED URANIUM (AMENDMENT h0. 12) - UNIVERSITY OF MASSACHUSETTS LOWELL (TAC NO. M86788) | |||
==Dear Dr. Kegel:== | ==Dear Dr. Kegel:== | ||
The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order, Amendment No. 12 to facility Operating License No R-125, to authorize the I | |||
The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order, Amendment No. 12 to facility Operating License No R-125, to authorize the | conversion from high enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. This Order modifies the license in accordance with Section 50.64 of Title 10 of the Code of Federal Reaulations (10 CFR 50.64), which requires that non-p'.,wer reactors, such as the reactor at the University of Massachusetts Lowell, convert to LEU fuel under certain conditions. | ||
The portions of the Order that allow possession of the LEU fuel- [ License Condition 2.B.(2)] and require submission of a startup report within 6 months of achieving initial criticality with LEU fuel (License Condition 2.C.(4)] are l | The Order is bein9 issued in accordance with 10 CFR 50.64(c)(3) and in response to your submittal of May 21, 1903, as supplemented on March 17, 1994, May 16, 1997, 2nd June 6, 1997. | ||
The portions of the Order that allow possession of the LEU fuel- [ License Condition 2.B.(2)] and require submission of a startup report within 6 months of achieving initial criticality with LEU fuel (License Condition 2.C.(4)] are l | |||
to be implemented 30 days after the date of publication of this Order in the i | |||
Federal Reaister. The portions of the Order that change License Condition 2.B.(4) to allow the possession but not the use of the HEU fuel and that change Licence Condition 2.C.(2) and the technical specifications to ap)1y to LEU fuel are to be implemented on the day of receipt of an adequate num)er and type of LEU fuel elements that are necessary to operate the facility as specified in your submittal and supplements. | Federal Reaister. The portions of the Order that change License Condition 2.B.(4) to allow the possession but not the use of the HEU fuel and that change Licence Condition 2.C.(2) and the technical specifications to ap)1y to LEU fuel are to be implemented on the day of receipt of an adequate num)er and type of LEU fuel elements that are necessary to operate the facility as specified in your submittal and supplements. | ||
Copies of replacement pages for the technical specifications and of the NRC staff safety evaluation for the conversion to LEU fuel are also enclosed. The Order is being sent to the f.ederal Reaister for publication. | Copies of replacement pages for the technical specifications and of the NRC staff safety evaluation for the conversion to LEU fuel are also enclosed. | ||
The Order is being sent to the f.ederal Reaister for publication. | |||
Sincerely, Neon re d.N N ebs, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-223 | Sincerely, Neon re d.N N ebs, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-223 | ||
==Enclosures:== | ==Enclosures:== | ||
1. | |||
Order-2. | |||
Replacement pages for Technical Specifications cc w/ enclosures: | |||
Mh M bbbb b See next page | |||
DISTRIBUTION: | ~ | ||
TMichaels | DISTRIBUTION: | ||
(f/ /97 | See next page TECH ED: | ||
MMendonca | PDND:PM $ | ||
P OGC BCalure TMichaels E | |||
on 6/3/97 4//g/97 (f/ /97 | |||
[/#97 W | |||
Ng c, | |||
M[g h) cmp,I v# | |||
cf PDND:(A)D DRPM: | |||
D MS1osson5g MMendonca Mt ins Mn pg | |||
' /$\\/97 g/24/97 97 6 | |||
o.3 )0 0:FICIAL RECORD COPY DOCUMENT NAME: | |||
G:\\SECY\\MICHAELS\\ MASS.ORD F H J | |||
g 7h 9708080214 970731 r,oa aoockosoo== | |||
minggi?ips | |||
C | C | ||
) | |||
& Ethq t | |||
UNITED STATES g | |||
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 July 31, 1997 Dr. Gunter Kegel, Director Radiation Laboratory | |||
-University of Massachusetts Lowell One University Avenue lowell, Massachusetts 01854 | |||
==SUBJECT:== | ==SUBJECT:== | ||
ISSUANCE OF ORDER MODIFYING LICENSE NO. R-125 TO CONVERT FROM HIGH- TO LOW-ENRICHED URANIUM (AMENDMENT NO. 12) - UNIVERSITY OF MASSACHUSETTS LOWELL (TAC NO. M86788) | ISSUANCE OF ORDER MODIFYING LICENSE NO. R-125 TO CONVERT FROM HIGH-TO LOW-ENRICHED URANIUM (AMENDMENT NO. 12) - UNIVERSITY OF MASSACHUSETTS LOWELL (TAC NO. M86788) | ||
==Dear Dr. Kegel:== | ==Dear Dr. Kegel:== | ||
The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order, Amendment No. 12 to Fe-"ity Operating License No. R-125, to authorize the conversion from high-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. | |||
The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order, Amendment No. 12 to Fe-"ity Operating License No. R-125, to authorize the conversion from high-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. This Order modifies the license in accordance with Section 50.64 of Title 10 of the Code of Federal'Reaulations (10 CFR 50.64), which requires that non-power reactors, such as the reactor at the University of Massachusetts Lowell, convert to LEU fuel under certain conditions. The Order is being issued in accordance with 10 CFR 50.64(c)(3) and in response to your submittal of May 21, 1993, as supplemented on March 17, 1994, May 16, 1997, and June 6, 1997. | This Order modifies the license in accordance with Section 50.64 of Title 10 of the Code of Federal'Reaulations (10 CFR 50.64), which requires that non-power reactors, such as the reactor at the University of Massachusetts Lowell, convert to LEU fuel under certain conditions. | ||
The portions of the Order that allow possession of the LEU fuel (License Condition 2.B.(2)] and require submission of a startup report within 6 months of achieving initial criticality with LEU fuel LLicense Conditton 2.C.(4)] are to be implemented 30 days after the date of publication of this Order in the Federal Reaister. The portions of the Order that change License Condition 2.B (4) to allow the possession but not the use of the HEU fuel and that change Licence Condition 2.C.(2) and the technical specifications to apply to LEU fuel are to be implemented on the day of receipt of an adequate number and type of LEU fuel elements that are necessary to operate the facility as specified in your submittal and supplements. | The Order is being issued in accordance with 10 CFR 50.64(c)(3) and in response to your submittal of May 21, 1993, as supplemented on March 17, 1994, May 16, 1997, and June 6, 1997. | ||
The portions of the Order that allow possession of the LEU fuel (License Condition 2.B.(2)] and require submission of a startup report within 6 months of achieving initial criticality with LEU fuel LLicense Conditton 2.C.(4)] are to be implemented 30 days after the date of publication of this Order in the Federal Reaister. | |||
Sin erely, | The portions of the Order that change License Condition 2.B (4) to allow the possession but not the use of the HEU fuel and that change Licence Condition 2.C.(2) and the technical specifications to apply to LEU fuel are to be implemented on the day of receipt of an adequate number and type of LEU fuel elements that are necessary to operate the facility as specified in your submittal and supplements. | ||
J ' b 5~}lLhl-Theodore S. Michaels, Senior. Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-223 | " Copies of replacement pages for tne technical specifications and of the NRC staff safety evaluation for the conversion to LEU fuel are also enclosed. | ||
The Order is being sent to the Federal Reaister for publication. | |||
Sin erely, J ' b 5~}lLhl-Theodore S. Michaels, Senior. Project Manager 4 | |||
Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-223 | |||
==Enclosures:== | ==Enclosures:== | ||
1. | |||
Order 2. | |||
Replacement pages for Technical Specifications 3. | |||
Safety Evaluation cc w/ enclosures: | |||
See next page | See next page | ||
4 University of Massachusetts lowell Docket No. 50-223 cc: | 4 University of Massachusetts lowell Docket No. 50-223 cc: | ||
Mayor of Lowell City Hall Lowell, Massachusetts 08152 Mr. Lee H. Bettenhausen | Mayor of Lowell City Hall Lowell, Massachusetts 08152 Mr. Lee H. Bettenhausen | ||
~ | |||
Nuclear Reactor Supervisor University of Massachusetts Lowell One University Avenue Lowell, Massachusetts 01854 Office of the Attorney General Environmental Protection Division 19th Floor One Ashburton Place Boston, Massachusetts 02108 | Nuclear Reactor Supervisor University of Massachusetts Lowell One University Avenue Lowell, Massachusetts 01854 Office of the Attorney General Environmental Protection Division 19th Floor One Ashburton Place Boston, Massachusetts 02108 | ||
), | ), | ||
July 31, 1997 e | |||
DISTRIBUTION: | |||
DOClNLTT NAME: ~ Gi\\SECY\\MIQlAELSsh\\SS.ORD iDocket File 50'-2231 i TDragoun 0GC (015 B-18) | |||
TMichaels PUBLIC M4endonca Pisaac P0oyle POND r/f EHylton Region I SHolnes SCollins/FMiraglia AAdams WEresian OGC RZimmerman WDean, EDO SECY GHill (2) | |||
MSlosson l | MSlosson l | ||
9'(0i 1 | 9'(0i 1 | ||
-\\ | |||
(/ d w | (/ | ||
d w | |||
.}} |
Latest revision as of 11:24, 10 December 2024
ML20198E802 | |
Person / Time | |
---|---|
Site: | University of Lowell |
Issue date: | 07/31/1997 |
From: | Michaels T NRC (Affiliation Not Assigned) |
To: | Kegel G MASSACHUSETTS, UNIV. OF, LOWELL, MA (FORMERLY LOWELL |
Shared Package | |
ML20198E807 | List: |
References | |
TAC-M86788, NUDOCS 9708080214 | |
Download: ML20198E802 (4) | |
Text
,,-----_-------------- -_ --_--_-_-- _ _ _ _ _
?
Dr. Gunter Kegel, Director July 31, 1997 Radiation Laboratcry University of Massachusetts Lowell One University Avenue Lowell, Massachusetts 01854
SUBJECT:
ISSUANCE OF ORDER MODIFYING LICENSE NO. R-125 TO CONVERT FROM J
HIGH T0 LOW-ENRICHED URANIUM (AMENDMENT h0. 12) - UNIVERSITY OF MASSACHUSETTS LOWELL (TAC NO. M86788)
Dear Dr. Kegel:
The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order, Amendment No. 12 to facility Operating License No R-125, to authorize the I
conversion from high enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. This Order modifies the license in accordance with Section 50.64 of Title 10 of the Code of Federal Reaulations (10 CFR 50.64), which requires that non-p'.,wer reactors, such as the reactor at the University of Massachusetts Lowell, convert to LEU fuel under certain conditions.
The Order is bein9 issued in accordance with 10 CFR 50.64(c)(3) and in response to your submittal of May 21, 1903, as supplemented on March 17, 1994, May 16, 1997, 2nd June 6, 1997.
The portions of the Order that allow possession of the LEU fuel- [ License Condition 2.B.(2)] and require submission of a startup report within 6 months of achieving initial criticality with LEU fuel (License Condition 2.C.(4)] are l
to be implemented 30 days after the date of publication of this Order in the i
Federal Reaister. The portions of the Order that change License Condition 2.B.(4) to allow the possession but not the use of the HEU fuel and that change Licence Condition 2.C.(2) and the technical specifications to ap)1y to LEU fuel are to be implemented on the day of receipt of an adequate num)er and type of LEU fuel elements that are necessary to operate the facility as specified in your submittal and supplements.
Copies of replacement pages for the technical specifications and of the NRC staff safety evaluation for the conversion to LEU fuel are also enclosed.
The Order is being sent to the f.ederal Reaister for publication.
Sincerely, Neon re d.N N ebs, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-223
Enclosures:
1.
Order-2.
Replacement pages for Technical Specifications cc w/ enclosures:
Mh M bbbb b See next page
~
DISTRIBUTION:
See next page TECH ED:
PDND:PM $
P OGC BCalure TMichaels E
on 6/3/97 4//g/97 (f/ /97
[/#97 W
Ng c,
M[g h) cmp,I v#
cf PDND:(A)D DRPM:
D MS1osson5g MMendonca Mt ins Mn pg
' /$\\/97 g/24/97 97 6
o.3 )0 0:FICIAL RECORD COPY DOCUMENT NAME:
G:\\SECY\\MICHAELS\\ MASS.ORD F H J
g 7h 9708080214 970731 r,oa aoockosoo==
minggi?ips
C
)
& Ethq t
UNITED STATES g
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 July 31, 1997 Dr. Gunter Kegel, Director Radiation Laboratory
-University of Massachusetts Lowell One University Avenue lowell, Massachusetts 01854
SUBJECT:
ISSUANCE OF ORDER MODIFYING LICENSE NO. R-125 TO CONVERT FROM HIGH-TO LOW-ENRICHED URANIUM (AMENDMENT NO. 12) - UNIVERSITY OF MASSACHUSETTS LOWELL (TAC NO. M86788)
Dear Dr. Kegel:
The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order, Amendment No. 12 to Fe-"ity Operating License No. R-125, to authorize the conversion from high-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel.
This Order modifies the license in accordance with Section 50.64 of Title 10 of the Code of Federal'Reaulations (10 CFR 50.64), which requires that non-power reactors, such as the reactor at the University of Massachusetts Lowell, convert to LEU fuel under certain conditions.
The Order is being issued in accordance with 10 CFR 50.64(c)(3) and in response to your submittal of May 21, 1993, as supplemented on March 17, 1994, May 16, 1997, and June 6, 1997.
The portions of the Order that allow possession of the LEU fuel (License Condition 2.B.(2)] and require submission of a startup report within 6 months of achieving initial criticality with LEU fuel LLicense Conditton 2.C.(4)] are to be implemented 30 days after the date of publication of this Order in the Federal Reaister.
The portions of the Order that change License Condition 2.B (4) to allow the possession but not the use of the HEU fuel and that change Licence Condition 2.C.(2) and the technical specifications to apply to LEU fuel are to be implemented on the day of receipt of an adequate number and type of LEU fuel elements that are necessary to operate the facility as specified in your submittal and supplements.
" Copies of replacement pages for tne technical specifications and of the NRC staff safety evaluation for the conversion to LEU fuel are also enclosed.
The Order is being sent to the Federal Reaister for publication.
Sin erely, J ' b 5~}lLhl-Theodore S. Michaels, Senior. Project Manager 4
Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-223
Enclosures:
1.
Order 2.
Replacement pages for Technical Specifications 3.
Safety Evaluation cc w/ enclosures:
See next page
4 University of Massachusetts lowell Docket No. 50-223 cc:
Mayor of Lowell City Hall Lowell, Massachusetts 08152 Mr. Lee H. Bettenhausen
~
Nuclear Reactor Supervisor University of Massachusetts Lowell One University Avenue Lowell, Massachusetts 01854 Office of the Attorney General Environmental Protection Division 19th Floor One Ashburton Place Boston, Massachusetts 02108
),
July 31, 1997 e
DISTRIBUTION:
DOClNLTT NAME: ~ Gi\\SECY\\MIQlAELSsh\\SS.ORD iDocket File 50'-2231 i TDragoun 0GC (015 B-18)
TMichaels PUBLIC M4endonca Pisaac P0oyle POND r/f EHylton Region I SHolnes SCollins/FMiraglia AAdams WEresian OGC RZimmerman WDean, EDO SECY GHill (2)
MSlosson l
9'(0i 1
-\\
(/
d w
.