ML21217A262: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Materials Programs Technical Information Exchange Public Meeting Update on High-Energy Line Break Activities Nuclear Regulatory Commission August 11, 2021 Virtual Meeting
{{#Wiki_filter:}}
 
Overview and Timeline June 2019:                                January 2021:
2015:                Public Meeting                          New UNR that focuses User Need Request          ML19214A095                            on recommended option May 2019:                  Fall 2019 - Winter 2020:                  March 2021:
TLR - BTP 3-4                  NRC staff developed                    Public Meeting Background and                recommended option for                  ML21089A005 History                      alternative criteria ML19144A089
 
Revising BTP 3-4: Underlying Philosophy
* Significantly revamp existing BTP o Eliminate stress reduction criteria, relax CUF criterion o Consider other degradation mechanisms o Tailor fatigue evaluations, as needed, to applicable systems/components
* Support operating reactor, new reactor, and advanced reactor applications o Provide identical framework and approach o Require unique evaluations or analysis depending on reactor type
* Approach should be risk-informed o Consider both susceptibility to degradation and failure consequences o Utilize a graded approach consistent with the risk
* Broaden scope beyond classical, LWR welded-piping systems o Include other types of connections (e.g., bolted) o Include other appropriate passive components/systems
* The approach will be similarly applicable for high and moderate-energy level breaks
 
Guidance Approach: Similar Philosophy to SRP 3.6.3 - Leak-Before-Break (LBB)
Screening              Analyses          SRP 3.6.3 - LBB Determination Address consequences of Increasing Risk failure and susceptibility to Screening applicable degradation mechanisms Break Preclusion Demonstration Perform analyses to demonstrate that the Analyses probability of piping failure is extremely low Increasing Rigor
 
Current Status and Path Forward
* NRC staff is developing the framework and associated technical basis
* Future deliverables:
o TLR on the technical basis for the alternative framework (mid 2022) o TLR that documents the alternative framework and associated technical basis (late 2022) o NUREG documenting the technical basis for the alternative framework (2023)}}

Revision as of 01:17, 17 January 2022

13 - NRC - Materials Exchange Public Meeting - HELB
ML21217A262
Person / Time
Issue date: 08/11/2021
From:
NRC/NRR/DNRL
To:
Hiser A
Shared Package
ML21217A247 List:
References
Download: ML21217A262 (5)


Text