NRC Public Meeting on 50_55a(b)(2)(xxvi) Condition - Final
ML20155K882
Person / Time
Issue date: 06/03/2020
From: David Rudland
NRC/NRR/DNRL
To:
David Rudland-NRR/DNRL 301-415-1896
References
Download: ML20155K882 (6)


Text

NRC Public Meeting on 10 CFR 50.55a(b)(2)(xxvi) Section XI Condition: Pressure Testing Class 1, 2 and 3 Mechanical Joints

©2018 Nuclear Energy Institute 2 Introduction and Opening Remarks NEI ASME EPRI Entergy Statement of Problem Examples Agenda

©2018 Nuclear Energy Institute 3 Section XI condition: Pressure testing Class 1, 2, and 3 mechanical joints.

The repair and replacement activity provisions in IWA-4540(c) of the 1998 Edition of Section XI for pressure testing Class 1, 2, and 3 mechanical joints must be applied when using the 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section.

IWA-4540(c) from the 1998 Edition of ASME Section XI also states:

Mechanical joints made in the installation of pressure retaining items shall be pressure tested in accordance with IWA-5211(a). Mechanical joints for component connections, piping, tubing (except heat exchanger tubing),

valves, and fittings, NPS-1 and smaller, are exempt from the pressure test.

10CFR50.55a(b)(2)(xxvi) Condition prior to June 3, 2020

©2018 Nuclear Energy Institute 4 Section XI condition: Pressure testing Class 1, 2, and 3 mechanical joints. When using the 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, licensees shall pressure test in accordance with IWA-5211(a) mechanical joints in Class 1, 2, and 3 piping and components greater than NPS-1 which are disassembled and reassembled during the performance of a Section XI repair/ replacement activity requiring documentation on a Form NIS-2. The system pressure test and NDE examiners shall meet the requirements of the licensees/applicants current ISI code of record.

10CFR50.55a(b)(2)(xxvi) Condition after June 3, 2020

©2018 Nuclear Energy Institute 5 The revised condition wording clarifies how the required pressure test shall be performed by removing reference to the 1998 edition of Section XI, however, it also introduces confusion as to when these pressure tests are intended to be required with the removal of the reference to IWA-4540(c). As worded, the condition prevents Owners from applying the exemptions provided by IWA-4540(b) when a mechanical joint is disassembled and assembled as part of a Repair/Replacement activity (RRA).

Problem Statement

©2018 Nuclear Energy Institute 6 VT-2 will be required at mechanical joints that were not involved in the RRA (Repair/Replacement Activity) but disassembled to facilitate the RRA VT-2 will be required for RRAs that are specifically exempted by IWA-4540(b) exemptions from pressure test Disassembled and reassembled (including seal weld) of threaded and seal welded valve body-bonnet connection for internal valve inspection Component (valve or pump) disassembly/reassembly for inspection or internal repair and an individual bolt replaced Examples of Impacts Created by Condition Revision