Line 14: |
Line 14: |
| | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | | | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS |
| | page count = 5 | | | page count = 5 |
| | project = | | | project = TAC:M96769, TAC:M96770 |
| | stage = Request | | | stage = Request |
| }} | | }} |
Line 23: |
Line 23: |
| J. D. Woodard SoAhern Nucle:r Executive Vice President Operati;g Company. Inc. | | J. D. Woodard SoAhern Nucle:r Executive Vice President Operati;g Company. Inc. |
| 40 Inverness Center Parkway Post Office Box 1295 Birmingham.Nabama 35201 Tel 205.992.5086 SOUTHERNk h COMPANY Energy to Serve YourWorld" May 15, 1998 LCV-lll l-C Docket Nos. 50-424 50-425 TAC Nos. M96769 M96770 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen: | | 40 Inverness Center Parkway Post Office Box 1295 Birmingham.Nabama 35201 Tel 205.992.5086 SOUTHERNk h COMPANY Energy to Serve YourWorld" May 15, 1998 LCV-lll l-C Docket Nos. 50-424 50-425 TAC Nos. M96769 M96770 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen: |
| VOGTLE ELECTRIC GENERATING PLANT REVISION TO REQUEST TO REVISE TECHNICAL l SPECIFICATIONS, "AC SOURCES - OPERATING" EMERGENCY DlESEL GENERATOR EXTENDED AOT REQUEST By letter dated January 22,1998, LCV-1111, Southern Nuclear Operating Company (SNC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications (TS) to extend the emergency diesel generator allowed outage time ( AOT). | | VOGTLE ELECTRIC GENERATING PLANT REVISION TO REQUEST TO REVISE TECHNICAL l SPECIFICATIONS, "AC SOURCES - OPERATING" EMERGENCY DlESEL GENERATOR EXTENDED AOT REQUEST By {{letter dated|date=January 22, 1998|text=letter dated January 22,1998}}, LCV-1111, Southern Nuclear Operating Company (SNC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications (TS) to extend the emergency diesel generator allowed outage time ( AOT). |
| The proposed amendment involved r. revision to Section 5.5 of the TS to include a new program 5.5.18, Conf ~guration Risk Management Program (CRMP). Based on comments from the NRC staff, SNC hereby proposes te revise the new program 5.5.18 to the extent that items b., c., and d. | | The proposed amendment involved r. revision to Section 5.5 of the TS to include a new program 5.5.18, Conf ~guration Risk Management Program (CRMP). Based on comments from the NRC staff, SNC hereby proposes te revise the new program 5.5.18 to the extent that items b., c., and d. |
| refer to the "LCO Action Statement." The words " Action Statement" will be replaced with the ward " Condition" in four places in items b., c., and d. of new program 5.5.18. | | refer to the "LCO Action Statement." The words " Action Statement" will be replaced with the ward " Condition" in four places in items b., c., and d. of new program 5.5.18. |
Letter Sequence Request |
---|
|
|
MONTHYEARML20134H0781996-11-0707 November 1996 Requests Addl Info Re Licensees 960913 Application for License Amend Re Changes to TS That Would Extend Allowed Outage Time for EDGs Up to 14 Days from 3 Days Project stage: Other ML20136J2571997-03-14014 March 1997 Responds to 961107 RAI Re Extended Allowed Outage Times for EDGs Project stage: Other ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days Project stage: Request ML20217G0241998-04-21021 April 1998 Commits to Implement Procedure That Will Prohibit Entry Into Extended EDG Allowed Outage Time,For Scheduled Maint Purposes If Severe Weather Conditions Are Expected Project stage: Other ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 Project stage: Request 1998-01-22
[Table View] |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217G6441999-10-13013 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2.Non-proprietary & Proprietary TS & Info Encl.Proprietary Encl Withheld ML20217B1121999-10-0404 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,to Revise TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 ML20212F3521999-09-22022 September 1999 Supplemental Application for Amend to Licenses NPF-68 & NPF-81,proposing Change to SR 3.8.1.13 to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5441999-08-30030 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,proposing to Raise Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7211999-08-26026 August 1999 Rev to 990413 Application for Amend to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 to Be IAW Versions of LCO 3.0.4 & SR 3.0.4 as They Appear in Rev 1 to NUREG-1431 ML20211E9031999-08-24024 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3111999-05-18018 May 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SRs 3.8.1.3 & 3.8.1.13 to Reduce Loading Requirements for DGs ML20206D6831999-04-28028 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,changing Licensing Basis from Present Requirement to Establish Containment Hydrogen Monitoring within 30 Minutes of Initiation of Safety Injection to within 90 Minutes of LOCA ML20205S3731999-04-19019 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS ML20205Q7781999-04-13013 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 That Appear in Existing TS to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as in Rev 1 to NUREG-1431 ML20154M9911998-10-15015 October 1998 Application for Amends to Licenses NPF-68 & NPF-81,deleting or Modifying Existing License Conditions Which Have Been Completed or Are No Longer in Effect ML20151U1931998-09-0303 September 1998 Application for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Short Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys.Ts Pages Encl ML20236R4631998-07-13013 July 1998 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protection Channels ML20236F1541998-06-26026 June 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9371998-05-0808 May 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 5.5.7, RCP Flywheel Insp Program, by Specifying Alternate Flywheel Insp Once Every Ten Years ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days ML20199G3721997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes That Would Facilitate Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6591997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Change Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20217H8981997-08-0808 August 1997 Revised Application for Amends to Licenses NPF-68 & NPF-81, Revising TS Re Credit for Boron & Enrichment Increase for Fuel Storage ML20141A8121997-06-13013 June 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.4.10, Pressurizer Safety Valves, to Reduce Nominal Set Pressure by 1% to 2460 Psig & Increase Tolerance to +2% ML20128G9881996-10-0404 October 1996 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20117N6401996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81,changing TS Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6311996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81, Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS ML20093K2021995-10-16016 October 1995 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20083M0551995-05-12012 May 1995 Application for Amend to License NPF-68,changing TS SR 4.6.1.2 to Support one-time Exemption from Section III.D.1(a) of 10CFR50,App J,Extending Interval for Type a Test from Scheduled 36 Months to Approx 54 Months ML20082T5591995-05-0101 May 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting TSs to Improved TSs for Westinghouse Plants as Represented in NUREG-1431 ML20081J4901995-03-17017 March 1995 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3.9.4 Re Containment Bldg Penetrations,To Allow Personnel Airlock to Be Open During Core Alterations or Movement of Irradiated Fuel within Containment ML20080F7781995-01-20020 January 1995 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 6.4.2 Re Plant Review Board Composition ML20079B1961994-12-29029 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant ML20079A9411994-12-27027 December 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Ts,By Revising Leak Test Frequency for Valves W/Resilient Seals ML20077F2131994-12-0606 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Containment Spray Additive Sys ML20073K3761994-10-0303 October 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS Reactor Pressure Limits as Results of New Analyses That Account for Nonconservatisms Identified in NRC Info Notice 93-058 & Results of RPV Surveillance Capsule Exams ML20073B7181994-09-13013 September 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing Elimination of Containment Spray Additive Sys ML20072F1981994-08-16016 August 1994 Application for Amend to License NPF-68,eliminating Article 2.C.(6) & Associated Attachment 1 of License Re Diesel Maint & Surveillance ML20072F2151994-08-16016 August 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3/4.7.1.1 & Bases Re Setpoint Tolerance for Main Steam Safety Valves ML20070A9841994-06-24024 June 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Values of Z & for Pressurizer Pressure Reactor Trip Instrumentation Trip Setpoints to Allow Use of Alternate Types of Pressure Transmitters ML20069C7271994-05-20020 May 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Heat Flux Channel Factor,Fq(Z),Penalty of 2 Percent in Spec 4.2.2.2.f to cycle-specific COLR to Allow for burnup-dependent Values of Penalty in Excess of 2% ML20070M6711994-04-28028 April 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 3/3.8.1.1, AC Sources Operating, Based on GL 93-05,RG 1.9 & NUMARC 87-00,Rev 1 ML20065F8631994-03-31031 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Revising TS 3/4.7.1.1 & Bases Re Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML20064L7341994-03-18018 March 1994 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes to Ts,Incorporating Technical Substance of Corresponding Spec (LCO 3.3.3) from NUREG-1431,Rev 0 ML20064C7181994-03-0101 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Reinstating Exception 3.0.4 for TS 3.2.4, Quadrant Power Tilt Ratio, ML20063E0591994-02-0303 February 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.7.10,area Temp Monitoring to Section 16.3 of FSAR ML20059D2381993-12-30030 December 1993 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Allow One Time Extension of AOT for RHR Pumps from 3 to 7 Days.One Time Extension Necessary to Allow Mods to RHR Sys While Plant in Mode 1 ML20058A9291993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,proposing Revs to TS Re Dc Sources,Including Rev of SRs of Paragraphs 4.8.2.1.e & F & Table 4.8-2, Battery Srs ML20058A9451993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Table 3.3-2,stating That ESFAS Not Required in Mode 2 When AFW Operating to Supply Sfs.Footnote Will Be Applied to Applicable Modes for Functional Unit 6.e ML20058H9971993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.3.4, Turbine Overspeed Protection to Section 16.3 of Fsar.Ge Proprietary Rept GET-8039 Encl.Proprietary Rept Withheld,Per 10CFR2.790 1999-09-22
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217G6441999-10-13013 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2.Non-proprietary & Proprietary TS & Info Encl.Proprietary Encl Withheld ML20217B1121999-10-0404 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,to Revise TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 ML20212F3521999-09-22022 September 1999 Supplemental Application for Amend to Licenses NPF-68 & NPF-81,proposing Change to SR 3.8.1.13 to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5441999-08-30030 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,proposing to Raise Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7211999-08-26026 August 1999 Rev to 990413 Application for Amend to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 to Be IAW Versions of LCO 3.0.4 & SR 3.0.4 as They Appear in Rev 1 to NUREG-1431 ML20211E9031999-08-24024 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3111999-05-18018 May 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SRs 3.8.1.3 & 3.8.1.13 to Reduce Loading Requirements for DGs ML20206D6831999-04-28028 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,changing Licensing Basis from Present Requirement to Establish Containment Hydrogen Monitoring within 30 Minutes of Initiation of Safety Injection to within 90 Minutes of LOCA ML20205S3731999-04-19019 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS ML20205Q7781999-04-13013 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 That Appear in Existing TS to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as in Rev 1 to NUREG-1431 ML20154M9911998-10-15015 October 1998 Application for Amends to Licenses NPF-68 & NPF-81,deleting or Modifying Existing License Conditions Which Have Been Completed or Are No Longer in Effect ML20151U1931998-09-0303 September 1998 Application for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Short Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys.Ts Pages Encl ML20236R4631998-07-13013 July 1998 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protection Channels ML20236F1541998-06-26026 June 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9371998-05-0808 May 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 5.5.7, RCP Flywheel Insp Program, by Specifying Alternate Flywheel Insp Once Every Ten Years ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days ML20199J6591997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Change Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20199G3721997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes That Would Facilitate Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20217H8981997-08-0808 August 1997 Revised Application for Amends to Licenses NPF-68 & NPF-81, Revising TS Re Credit for Boron & Enrichment Increase for Fuel Storage ML20141A8121997-06-13013 June 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.4.10, Pressurizer Safety Valves, to Reduce Nominal Set Pressure by 1% to 2460 Psig & Increase Tolerance to +2% ML20128G9881996-10-0404 October 1996 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20117N6401996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81,changing TS Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6311996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81, Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS ML20093K2021995-10-16016 October 1995 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20083M0551995-05-12012 May 1995 Application for Amend to License NPF-68,changing TS SR 4.6.1.2 to Support one-time Exemption from Section III.D.1(a) of 10CFR50,App J,Extending Interval for Type a Test from Scheduled 36 Months to Approx 54 Months ML20082T5591995-05-0101 May 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting TSs to Improved TSs for Westinghouse Plants as Represented in NUREG-1431 ML20081J4901995-03-17017 March 1995 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3.9.4 Re Containment Bldg Penetrations,To Allow Personnel Airlock to Be Open During Core Alterations or Movement of Irradiated Fuel within Containment ML20080F7781995-01-20020 January 1995 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 6.4.2 Re Plant Review Board Composition ML20079B1961994-12-29029 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant ML20079A9411994-12-27027 December 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Ts,By Revising Leak Test Frequency for Valves W/Resilient Seals ML20077F2131994-12-0606 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Containment Spray Additive Sys ML20073K3761994-10-0303 October 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS Reactor Pressure Limits as Results of New Analyses That Account for Nonconservatisms Identified in NRC Info Notice 93-058 & Results of RPV Surveillance Capsule Exams ML20073B7181994-09-13013 September 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing Elimination of Containment Spray Additive Sys ML20072F1981994-08-16016 August 1994 Application for Amend to License NPF-68,eliminating Article 2.C.(6) & Associated Attachment 1 of License Re Diesel Maint & Surveillance ML20072F2151994-08-16016 August 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3/4.7.1.1 & Bases Re Setpoint Tolerance for Main Steam Safety Valves ML20070A9841994-06-24024 June 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Values of Z & for Pressurizer Pressure Reactor Trip Instrumentation Trip Setpoints to Allow Use of Alternate Types of Pressure Transmitters ML20069C7271994-05-20020 May 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Heat Flux Channel Factor,Fq(Z),Penalty of 2 Percent in Spec 4.2.2.2.f to cycle-specific COLR to Allow for burnup-dependent Values of Penalty in Excess of 2% ML20070M6711994-04-28028 April 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 3/3.8.1.1, AC Sources Operating, Based on GL 93-05,RG 1.9 & NUMARC 87-00,Rev 1 ML20065F8631994-03-31031 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Revising TS 3/4.7.1.1 & Bases Re Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML20064L7341994-03-18018 March 1994 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes to Ts,Incorporating Technical Substance of Corresponding Spec (LCO 3.3.3) from NUREG-1431,Rev 0 ML20064C7181994-03-0101 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Reinstating Exception 3.0.4 for TS 3.2.4, Quadrant Power Tilt Ratio, ML20063E0591994-02-0303 February 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.7.10,area Temp Monitoring to Section 16.3 of FSAR ML20059D2381993-12-30030 December 1993 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Allow One Time Extension of AOT for RHR Pumps from 3 to 7 Days.One Time Extension Necessary to Allow Mods to RHR Sys While Plant in Mode 1 ML20058A9451993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Table 3.3-2,stating That ESFAS Not Required in Mode 2 When AFW Operating to Supply Sfs.Footnote Will Be Applied to Applicable Modes for Functional Unit 6.e ML20058A9291993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,proposing Revs to TS Re Dc Sources,Including Rev of SRs of Paragraphs 4.8.2.1.e & F & Table 4.8-2, Battery Srs ML20058H9971993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.3.4, Turbine Overspeed Protection to Section 16.3 of Fsar.Ge Proprietary Rept GET-8039 Encl.Proprietary Rept Withheld,Per 10CFR2.790 1999-09-22
[Table view] |
Text
I
. e ,
J. D. Woodard SoAhern Nucle:r Executive Vice President Operati;g Company. Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham.Nabama 35201 Tel 205.992.5086 SOUTHERNk h COMPANY Energy to Serve YourWorld" May 15, 1998 LCV-lll l-C Docket Nos. 50-424 50-425 TAC Nos. M96769 M96770 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT REVISION TO REQUEST TO REVISE TECHNICAL l SPECIFICATIONS, "AC SOURCES - OPERATING" EMERGENCY DlESEL GENERATOR EXTENDED AOT REQUEST By letter dated January 22,1998, LCV-1111, Southern Nuclear Operating Company (SNC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications (TS) to extend the emergency diesel generator allowed outage time ( AOT).
The proposed amendment involved r. revision to Section 5.5 of the TS to include a new program 5.5.18, Conf ~guration Risk Management Program (CRMP). Based on comments from the NRC staff, SNC hereby proposes te revise the new program 5.5.18 to the extent that items b., c., and d.
refer to the "LCO Action Statement." The words " Action Statement" will be replaced with the ward " Condition" in four places in items b., c., and d. of new program 5.5.18.
Also based on comments from the NRC staff, SNC has revised the Bases insert for new Required Actions B.S.1 and B.S.2. The proposed wording in LCV-1111 contained the following sentences:
"If the running CTG should fail while in Condition B, any one of the remaining CTGs
- must be started within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. If one of the six CTGs cannot be started within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, l Condition C becomes applicable."
These two sentences will be deleted to prevent confusion with the gnidance that already exists in f
l 9905220110 900515 PDR ADGCK 05000424 0 0\
P PDR I
l ~
U. S. Nuclear Regulatory Commission LCV-1111-C Page 2 the "Use and Application" section of the TS.
Marked up pages from our previous submittal and new clean typed pages reflecting the changes are included for your use.
In addition, the NRC staff has requested that SNC address our conformance to section 4.3.1,
" Quality of the PRA," ofdraft Regulatory Guide DG 1065. SNC notes that the staff has asked us to address a version of DG-1065 subsequent to the version published for comment in June 1997.
Our position regarding this later version of section 4.3.1 of DG-1065 is provided as an attachment to this letter. SNC wishes to point out that the probabihstic risk analysis was provided as an informational supplement to the deterministicjustification for the proposed emergency diesel generator extended allowed outage time. None of the guidance of DG-1065 was available at the time that the original PRA was performed, and the status of DG-1065 continues to be a draft. Therefore, SNC can only describe the process that was employed in performing the PRA.
In accordance with the requirements of 10 CFR 50.92, LCV-1111 included a Significant llazards Evaluation for the proposed changes. That evaluation is not affected by the changes proposed by this submittal.
Mr. J. D. Woodard states he is Executive Vice President of SNC, is authorized to execute this oath on behalf of SNC, and to the best of his knowledge and belief, the facts set forth in this letter are true.
SOUTifERN NUCLEAR OPERATING COMPANY By:' h
'J. D. W6odard 3 Sworn to and subscribed before me' this C#1 day of drw / 1998 A &
V'-] opry Public My Com ission Expires: 7-N'N JDWhijs
~ ' "
U. S.'Nucl ar Regulitory Commission LCV-Illl-C Page 3 Attachments cc: Southern Nuclear Operating Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. II. JafTe, Senior Project Manager, NRR Mr. John Zeiler, Senior Resident Inspector, Vogtle
5.5'.18 ConHguration Risk Management Program The Configuration Risk Management Program (CRMP) provides a proceduralized risk-informed assessment to manage the risk associated with equipment inoperability. The program applies to technical specification structures, systems, or components for which a risk-informed allowed outage time has ben granted. The program shall include the following elements:
- a. Provisions for the control and implementation of a Level 1 at power internal events PRA-informed methodology. The assessment shall be capable of evaluating the applicable plant configuration.
- b. Provisions for perfc.cning an assessment prior to entering the LCO Mirn 9:'::::: for preplanned activities.
CentdH)w1
- c. Provisions for performing an assessment after entering the LCO A ~i~
Swameefor unplanned entry into the LCO .^ :9 c~ _:: .
Coqcfj//pA dcAt: fit /orf
- d. Provisions for assessing the need for additional actions after the discovery of additional equipment out of service conditions while in the .
LCO ' ..L........
Se~Adiflon I
- e. Provisions for considering other applicable risk significant contributors such as Level 2 issues and external events, qualitatively or q quantitatively. I 1
l l
S :\VoGTLEVOGTLEXvDTECIIS PEC\ l 4 DYDGTS\14 DYD /.s2. DOC
INSERT FOR NEW REQUIRED ACTION B.S.1 AND B.5.2 B.S.1 and B12 Required Action B.5.1 provides assurance that an enhanced black-start combustion turbine generator (CTG) is functional when a DG is out of service for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Required Action B.5.1 is modified by a Note that states that it is only applicable provided that the two enhanced black-start CTGs and black-start diesel generator have a combined reliability of 2 95% based on a minimum of 20 tests per enhanced black-start CTO and quarterly testing thereafter. This quarterly testing will subject each enhanced 1
black-start CTG to a start and load-run test. The black-start diesel generator will also be tested quarterly, but separately from the enhanced black-start CTGs. Regtiired Action B.5.1 may be met by starting either of the enhanced black-start CTGs and the black-start diesel generator and verifying that they achieve steady state voltage and frequency. The black-start diesel generator may be started separately.
if a DG is to be removed from service voluntarily for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, it may be advantageous to test an enhanced black-start CTG prior to taking the DG out of service.
In such cases where advance notice of removing a DG from service is available, Required Action B.5.1 may be perfonned up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to entry into Condition B. In other cases, Required Action B.5.1 must be performed within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after entry into Condition B.
If the combined reliability of the enhanced black-start CTGs has not been demonstrated or maintained 2 95%, the option of starting and running any one of the six CTGs while in Condition B is available in the form of Required Action B.S.2. In the event of preplanned maintenance that would exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, any one of the six CTGs must be started prior to entry into Condition B and allowed to run for the duration of Condition B. Otherwise, any one of the six CTGs must be started within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (and allowed to run) after entry into Condition B if the DG is to be out of service for more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. 'T2: m:M_-_;;
CTC d='d ^" "!E E C 2.. . " ; m cfi: r:xM.JTC ..=v " - _2 9' ? hcr-- %: 2.... :! - CTC., ..x:: '- _9 4'L.:'.. _ C:..dL..%
5 ::--- g Note that Required Action B.5.1 requires that one of the two enhanced black-start CTGs be started, but any one of the six CTGs could be started to satisfy Required Action B.5.2. Since a CTG is started and running while the DG is inoperable, it is not necessary that the CTG have enhanced black-start capability.
S.WOGTLE'.v0GTLE.KvDTECilS PEC\l 4 DYDGTSil 4 DYD As2. DOC