ML13200A006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML13200A006 | |||
| issue date = 07/15/2013 | |||
| title = Nine Mile Point, Units 1 and 2 - Response to NRC Regulatory Issue Summary 2013-06 | |||
| author name = Gerber J W | |||
| author affiliation = Constellation Energy Nuclear Group, LLC, EDF Group, Nine Mile Point Nuclear Station, LLC | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000220, 05000410 | |||
| license number = | |||
| contact person = | |||
| case reference number = RIS 2013-06 | |||
| document type = Letter, License-Operator Examination Report | |||
| page count = 5 | |||
| revision = 0 | |||
}} | |||
See also: [[followed by::RIS 2013-06]] | |||
=Text= | |||
{{#Wiki_filter:CENG.a joint venture ofaon eDFEnergy,%%NINE MILE POINTNUCLEAR STATIONP.O. Box 63Lycoming, NY 13093July 15, 2013U.S. Nuclear Regulatory CommissionWashington, DC 20555-0001ATTENTION: | |||
SUBJECT: Document Control DeskNine Mile Point Nuclear StationUnit Nos. I and 2; Docket Nos. 50-220 and 50-410Response to NRC Regulatory Issue Summary 2013-06Enclosed please find the projected operator licensing examination data requested in NRC Regulatory IssueSummary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," for Nine MilePoint Nuclear Station, Units 1 and 2.The estimated data are being submitted on the enclosed NRC Forms 536 as requested in the RIS.Should you have any questions regarding the information in this submittal, please contact me at (315)349-5214.Very truly yours,Jeffrey W. GerberManager -TrainingJWG/MHS | |||
===Enclosure:=== | |||
NRC Forms 536DfL Document Control DeskJuly 15, 2013Page 2cc: NRC Regional Administrator, Region ID. E. Jackson, NRC Region INRC Project ManagerNRC Resident Inspector ENCLOSURENRC FORMS 536Nine Mile Point Nuclear Station, LLCJuly 15, 2013 NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014(09-2011) Estimated burden per response to comply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemat e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONNine Mile Point Nuclear StationUnit 1 Region IDocket No. 50-220A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018ESTIMATED NUMBER OFLICENSEE-PREPARED 1 0 1 0EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018NUMBER OF REACTOR 8 0 8 0OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 9 10NUMBER OF SENIOR REACTOROPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATESPRIMARY DATE 03/02/2015 N/A 03/06/2017 N/AALTERNATE DATE 03/09/2015 N/A 03/13/2017 N/AC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2015 CY 2016PROPOSED ,NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 0 18 0 0 0 0 0CANDIDATESNRC FORM 536 (09-2011) | |||
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014(09-2011) Estimated burden per response to comply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONNine Mile Point Nuclear StationUnit 2 Region IDocket No. 50-410A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018ESTIMATED NUMBER OFLICENSEE-PREPARED 0 1 0 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018NUMBER OF REACTOR 0 7 0 7OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 0 1 0NUMBER OF SENIOR REACTOROPERATORS -UPGRADE 0NUMBER OF SENIOR REACTOROPERATORS -LIMITED 0PROPOSED DATESPRIMARY DATE N/A 03/07/2016 N/A 03/05/2018ALTERNATE DATE N/A 03/14/2016 N/A 03/12/2018C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2015 CY 2016PROPOSEDNUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 0 0 0 0 0 17 0CANDIDATESNRC FORM 536 (09-2011) | |||
}} |
Revision as of 02:32, 23 February 2018
ML13200A006 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 07/15/2013 |
Revision: | 0 |
From: | Gerber J W Constellation Energy Nuclear Group, EDF Group, Nine Mile Point |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RIS 2013-06 | |
Download: ML13200A006 (5) | |
See also: RIS 2013-06
Text
CENG.a joint venture ofaon eDFEnergy,%%NINE MILE POINTNUCLEAR STATIONP.O. Box 63Lycoming, NY 13093July 15, 2013U.S. Nuclear Regulatory CommissionWashington, DC 20555-0001ATTENTION:
SUBJECT: Document Control DeskNine Mile Point Nuclear StationUnit Nos. I and 2; Docket Nos. 50-220 and 50-410Response to NRC Regulatory Issue Summary 2013-06Enclosed please find the projected operator licensing examination data requested in NRC Regulatory IssueSummary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," for Nine MilePoint Nuclear Station, Units 1 and 2.The estimated data are being submitted on the enclosed NRC Forms 536 as requested in the RIS.Should you have any questions regarding the information in this submittal, please contact me at (315)349-5214.Very truly yours,Jeffrey W. GerberManager -TrainingJWG/MHS
Enclosure:
NRC Forms 536DfL Document Control DeskJuly 15, 2013Page 2cc: NRC Regional Administrator, Region ID. E. Jackson, NRC Region INRC Project ManagerNRC Resident Inspector ENCLOSURENRC FORMS 536Nine Mile Point Nuclear Station, LLCJuly 15, 2013 NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014(09-2011) Estimated burden per response to comply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemat e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONNine Mile Point Nuclear StationUnit 1 Region IDocket No. 50-220A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018ESTIMATED NUMBER OFLICENSEE-PREPARED 1 0 1 0EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018NUMBER OF REACTOR 8 0 8 0OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 9 10NUMBER OF SENIOR REACTOROPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATESPRIMARY DATE 03/02/2015 N/A 03/06/2017 N/AALTERNATE DATE 03/09/2015 N/A 03/13/2017 N/AC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2015 CY 2016PROPOSED ,NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 0 18 0 0 0 0 0CANDIDATESNRC FORM 536 (09-2011)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014(09-2011) Estimated burden per response to comply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONNine Mile Point Nuclear StationUnit 2 Region IDocket No. 50-410A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018ESTIMATED NUMBER OFLICENSEE-PREPARED 0 1 0 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018NUMBER OF REACTOR 0 7 0 7OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 0 1 0NUMBER OF SENIOR REACTOROPERATORS -UPGRADE 0NUMBER OF SENIOR REACTOROPERATORS -LIMITED 0PROPOSED DATESPRIMARY DATE N/A 03/07/2016 N/A 03/05/2018ALTERNATE DATE N/A 03/14/2016 N/A 03/12/2018C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2015 CY 2016PROPOSEDNUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 0 0 0 0 0 17 0CANDIDATESNRC FORM 536 (09-2011)