ML13196A530: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML13196A530
| number = ML13196A530
| issue date = 07/15/2013
| issue date = 07/15/2013
| title = South Texas Project Electric Generating Station - Notification of Inspection (NRC Inspection Report 05000498-13-005, 05000499-13-005 and Request for Information)
| title = South Texas Project Electric Generating Station - Notification of Inspection (Nrc Inspection Report 05000498-13-005, 05000499-13-005 and Request for Information)
| author name = Gaddy V G
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB

Revision as of 13:17, 13 February 2018

South Texas Project Electric Generating Station - Notification of Inspection (Nrc Inspection Report 05000498-13-005, 05000499-13-005 and Request for Information)
ML13196A530
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/15/2013
From: Vincent Gaddy
Operations Branch IV
To: Koehl D L
South Texas
References
IR-13-005
Download: ML13196A530 (7)


See also: IR 05000498/2013005

Text

July 15, 2013

Mr. Dennis President & CEO/CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000498, 05000499/2013005 AND REQUEST FOR INFORMATION)

Dear Mr. Koehl:

From September 9 to September 13, 2013, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at South Texas Project Electric Generating Station Units 1 and 2, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. The third group (Section C of this enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Robyn Savage of your licensing organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Ms. Theresa Buchanan (817) 200-1503 (Theresa.Buchanan@nrc.gov), Mr. Brian Larson at (817) 200-1172 (Brian.Larson@nrc.gov), or Mr. Gabriel Apger (Gabriel.Apger@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80

Enclosure:

Biennial Requalification Document Request