Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, "Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO (EPID L 2018-LLA-0220)
Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, "Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO (EPID L 2018-LLA-0220)
Attachments:                    Brunswick TSTF-439 Draft RAI L-2018-LLA-0220 2018-12-21.pdf Mr. Grzeck, By letter dated August 14, 2018 (Agencywide Documents Access and Management System Accession No.
Attachments:                    Brunswick TSTF-439 Draft RAI L-2018-LLA-0220 2018-12-21.pdf Mr. Grzeck, By letter dated August 14, 2018 (Agencywide Documents Access and Management System Accession No. ML18227A535), Duke Energy Progress, LLC (the licensee) submitted a license amendment request (LAR) for Brunswick Steam Electric Plant Unit Nos. 1 and 2 (Brunswick). The proposed amendments would modify the Brunswick Technical Specifications (TSs) to adopt TSTF-439, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [limiting condition for operation].
ML18227A535), Duke Energy Progress, LLC (the licensee) submitted a license amendment request (LAR) for Brunswick Steam Electric Plant Unit Nos. 1 and 2 (Brunswick). The proposed amendments would modify the Brunswick Technical Specifications (TSs) to adopt TSTF-439, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [limiting condition for operation].
To complete its review, the NRC staff has prepared the attached requests for additional information (RAIs) in DRAFT form. To arrange a clarification call for the attached draft RAIs and to discuss the due date for the RAI responses, please contact me at (301) 415-6256.
To complete its review, the NRC staff has prepared the attached requests for additional information (RAIs) in DRAFT form. To arrange a clarification call for the attached draft RAIs and to discuss the due date for the RAI responses, please contact me at (301) 415-6256.
Respectfully, Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 2-2 301-415-6256 Docket No. 50-325, 50-324 1
Respectfully, Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 2-2 301-415-6256 Docket No. 50-325, 50-324 1

Latest revision as of 13:50, 2 February 2020

NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO
ML18360A036
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/21/2018
From: Dennis Galvin
Plant Licensing Branch II
To: Grzeck L
Duke Energy Carolinas
References
L 2018-LLA-0220
Download: ML18360A036 (5)


Text

NRR-DMPSPEm Resource From: Galvin, Dennis Sent: Friday, December 21, 2018 3:24 PM To: Grzeck, Lee (Lee.Grzeck@duke-energy.com)

Cc: Arthur.Zaremba@duke-energy.com; Mark Turkal (Mark.Turkal@duke-energy.com)

Subject:

Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, "Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO (EPID L 2018-LLA-0220)

Attachments: Brunswick TSTF-439 Draft RAI L-2018-LLA-0220 2018-12-21.pdf Mr. Grzeck, By letter dated August 14, 2018 (Agencywide Documents Access and Management System Accession No. ML18227A535), Duke Energy Progress, LLC (the licensee) submitted a license amendment request (LAR) for Brunswick Steam Electric Plant Unit Nos. 1 and 2 (Brunswick). The proposed amendments would modify the Brunswick Technical Specifications (TSs) to adopt TSTF-439, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [limiting condition for operation].

To complete its review, the NRC staff has prepared the attached requests for additional information (RAIs) in DRAFT form. To arrange a clarification call for the attached draft RAIs and to discuss the due date for the RAI responses, please contact me at (301) 415-6256.

Respectfully, Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 2-2 301-415-6256 Docket No. 50-325, 50-324 1

Hearing Identifier: NRR_DMPS Email Number: 723 Mail Envelope Properties (Dennis.Galvin@nrc.gov20181221152300)

Subject:

Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, "Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO (EPID L 2018-LLA-0220)

Sent Date: 12/21/2018 3:23:38 PM Received Date: 12/21/2018 3:23:00 PM From: Galvin, Dennis Created By: Dennis.Galvin@nrc.gov Recipients:

"Arthur.Zaremba@duke-energy.com" <Arthur.Zaremba@duke-energy.com>

Tracking Status: None "Mark Turkal (Mark.Turkal@duke-energy.com)" <Mark.Turkal@duke-energy.com>

Tracking Status: None "Grzeck, Lee (Lee.Grzeck@duke-energy.com)" <Lee.Grzeck@duke-energy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1029 12/21/2018 3:23:00 PM Brunswick TSTF-439 Draft RAI L-2018-LLA-0220 2018-12-21.pdf 91235 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO ADOPT TSTF-439, REVISION 2, ELIMINATE SECOND COMPLETION TIMES LIMITING TIME FROM DISCOVERY OF FAILURE TO MEET AN LCO DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 Introduction The licensee proposed changes eliminating second completion times (CT) limiting time from discovery of failure to meet a limiting condition for operation (LCO) for Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. In the license amendment request (LAR) dated August 14, 2018 (ADAMS Accession No. ML18227A535), the licensee stated these changes are consistent with NRC-approved Technical Specification Task Force (TSTF) Traveler TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO (ML051860296).

In Section 2.2 of the LAR, Variations and Other Administrative Changes, the licensee identifies proposed changes not found in NUREG-1433, Standard Technical Specifications General Electric Plants BWR/4. The licensee also stated that since the current BSEP TSs 3.7.2, SW

[Service Water] System and UHS [Ultimate Heat Sink], and 3.8.1, AC [alternating current]

SourcesOperating, 3.8.7, Distribution SystemsOperating, contain second CT, it falls within the scope of the proposed change and has been included as a variation.

Regarding proposed changes to TS LCO 3.7.2, the licensee states:

The second Completion Time was added to the BSEP TSs as part of the conversion to ITS [Improved TSs]. NUREG-1433, Revision 1 did not contain a second Completion Time within this specific section, however, BSEP adopted this restrictive change.

Regarding proposed changes to TS LCO 3.8.1, the licensee states:

After the ITS conversion, a BSEP-specific amendment was issued for TS 3.8.1, AC Sources - Operating, and TS 3.8.7, Distribution Systems - Operating, as amendments 205 and 235 for BSEP Units 1 and 2, respectively, on April 15, 1999. Due to the shared configuration of the BSEP electrical distribution systems, these amendments introduced new TS Conditions (i.e., only applicable with one unit operating and the other unit shutdown) to allow extended Completions Times necessary to allow performance of preventive maintenance on buses, transformers, breakers, and other related electrical equipment in the

shutdown unit. The Completion Times for these conditions also introduced plant-specific second Completion Times.

Regarding proposed changes to TS LCO 3.8.7, REQUIRED ACTION A.1, the licensee states:

After the ITS conversion, a BSEP-specific amendment was issued for TS 3.8.1, AC Sources - Operating, and TS 3.8.7, Distribution Systems - Operating, as amendments 205 and 235 for BSEP Units 1 and 2, respectively, on April 15, 1999. Due to the shared configuration of the BSEP electrical distribution systems, these amendments introduced new TS Conditions (i.e., only applicable with one unit operating and the other unit shutdown) to allow extended Completion Times necessary to allow performance of preventive maintenance on buses, transformers, breakers, and other related electrical equipment in the shutdown unit. The Completion Times for these conditions also introduced plant-specific second Completion Times.

Regarding proposed changes to TS LCO 3.8.7, Required Action D.1, the licensee states:

The onsite DC electrical power distribution system is divided into redundant and independent DC electrical power distribution subsystems, due to the unique shared electrical system at BSEP. Because each DC subsystem can be powered by a normal and alternate DC source, this specific TS Required Action covers the loss of one or more DC electrical power distribution subsystems for reasons other than the loss of the normal DC source (i.e., TS 3.8.7, Required Action C.4).

Regulatory Analysis Basis Title 10 of the Code of Federal Regulations (CFR) Part 50.36 (c)(2)(i) state the following:

Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.

The staffs request is needed to understand the basis for the deletion of the second CT in BSEP TSs identified as variations.

Request for Additional Information TSTF-439, Revision 2 provides a discussion of each of the specifications affected by the TSTF that justifies deleting the second CTs from the specification in NUREG-1433. The licensees application does not provide a comparable discussion for the proposed variations. For the specifications listed in the BSEP variations, TS 3.7.2, TS 3.8.1, and TS 3.8.7, provide a discussion similar to that in TSTF-439 for each specification to justify proposed deletions of second CTs. In particular, this plant-specific justification should address the following:

a. For TS 3.7.2, Required Actions B.1, C.2 1, and E.1, the identified more restrictive change;
b. For TS 3.8.1, Required Actions B.3, C.3, and D.5, as applicable, unique TSs due to the BSEPs shared electrical distribution systems configuration and the reference to LCO 3.8.1 NOTES a or b;
c. For TS 3.8.7, Required Actions A.1, B.1, C.4, and D.1, as applicable, unique TSs due to the BSEPs shared electrical distribution systems configuration.

1 During the review of the application, the NRC staff noted that the variances table in Section 2.2 of the LAR refers to TS 3.7.2, Required Action C.3. The Brunswick TS do not contain a TS 3.7.2, Required Action C.3. As shown the TS markups in Attachments 1 and 2, the proposed change is to TS 3.7.2, Required Action C.2. Accordingly, the RAI refers to TS 3.7.2, Required Action C.2.