A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice. | A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice. | ||
Sincerely, | Sincerely, | ||
.k0rL,~ t~ | .k0rL,~ t~ | ||
James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271 | James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271 | ||
Line 123: | Line 122: | ||
~ .-. ~.--. ! .... ;_._ . | ~ .-. ~.--. ! .... ;_._ . | ||
*_-"*---l----r---- "'-, | *_-"*---l----r---- "'-, | ||
105 655 253 | 105 655 253 | ||
~!!;! 700 | ~!!;! 700 | ||
~ ~ ..... | ~ ~ ..... | ||
110 115 713 m | 110 115 713 m | ||
Line 136: | Line 133: | ||
:::l 150 g)3 | :::l 150 g)3 | ||
~ 400 155 1024 w | ~ 400 155 1024 w | ||
If 1103 300 | If 1103 300 During tensioning and detensioning operations with the vessel vented and the vessel fluid 200 -I--+-l---+--I-+---:Ilevel below the flange region, the flange temperature may be monitored with test Instrumentation in lieu of process instrumentation for the downcomer region fluid temperature and permanenl'flange region outside surface temperature. The test instrumentation uncertainty must be less than +/- 2°F. The flange region temperatures must 100 t--+----l--t---t--+--lIbe maintained greater than or equal to 72 OF when monitored with test instrumentation during tensioning, detensioning. and when tensioned. | ||
During tensioning and detensioning operations with the vessel vented and the vessel fluid 200 -I--+-l---+--I-+---:Ilevel below the flange region, the flange temperature may be monitored with test Instrumentation in lieu of process instrumentation for the downcomer region fluid temperature and permanenl'flange region outside surface temperature. The test instrumentation uncertainty must be less than +/- 2°F. The flange region temperatures must 100 t--+----l--t---t--+--lIbe maintained greater than or equal to 72 OF when monitored with test instrumentation during tensioning, detensioning. and when tensioned. | |||
0 00 80 100 120 140 160 160 200 TEMPERATURE (OF) | 0 00 80 100 120 140 160 160 200 TEMPERATURE (OF) | ||
~, | ~, | ||
Line 149: | Line 144: | ||
0 1100 253 114 253 114 402 1000 115 407 116 413 0 120 439 253 | 0 1100 253 114 253 114 402 1000 115 407 116 413 0 120 439 253 | ||
~ 900 125 474 253 | ~ 900 125 474 253 | ||
.!; 130 513 253 0 135 555 253 i:ix 800 140 603 253 | .!; 130 513 253 0 135 555 253 i:ix 800 140 603 253 | ||
: a. 145 655 253 | : a. 145 655 253 | ||
Line 156: | Line 150: | ||
III 155 777 253 700 III 160 848 253 | III 155 777 253 700 III 160 848 253 | ||
~ 165 926 253 IX | ~ 165 926 253 IX | ||
~ 170 1013 253 u 600 175 1108 253 | ~ 170 1013 253 u 600 175 1108 253 w 180 1214 253 IX | ||
w 180 1214 253 IX | |||
~ 180 1214 830 I | ~ 180 1214 830 I | ||
i 500 185 1312 889 | i 500 185 1312 889 | ||
Line 168: | Line 160: | ||
: a. 210 1258 downcomer region 300 | : a. 210 1258 downcomer region 300 | ||
-...:........;...+ | -...:........;...+ | ||
I | I | ||
* I | * I | ||
-~---- ----:---- | -~---- ----:---- | ||
fluid temperatura and flange region outside | |||
~- ~ .;-" .. | ~- ~ .;-" .. | ||
surface temperature, 200 except when flange temperature is greater than 180*F. | surface temperature, 200 except when flange temperature is greater than 180*F. | ||
Line 212: | Line 202: | ||
The licensee proposes updating the bounding run-time to 7.943 x 108 MWH(t), corresponding to a bounding 1/4T neutron fluence of 1.24 x 1018 n/cm 2 , while the licensee predicts that the RPV will only reach a 1/4T neutron fluence of 5.39 x 1017 n/cm 2 by the end of a 20-year license renewal (LR) period (for a total of 60 years of licensed operation). This update would support operations into the LR period beyond the original 40-year operating license. | The licensee proposes updating the bounding run-time to 7.943 x 108 MWH(t), corresponding to a bounding 1/4T neutron fluence of 1.24 x 1018 n/cm 2 , while the licensee predicts that the RPV will only reach a 1/4T neutron fluence of 5.39 x 1017 n/cm 2 by the end of a 20-year license renewal (LR) period (for a total of 60 years of licensed operation). This update would support operations into the LR period beyond the original 40-year operating license. | ||
The licensee states that in the LR application SE, the NRC staff concluded that the original P-T limits calculation would remain bounding for the license renewal period. Hence, the licensee proposes updating the maximum MWH(t) value and neutron fluence prediction in the TS. | The licensee states that in the LR application SE, the NRC staff concluded that the original P-T limits calculation would remain bounding for the license renewal period. Hence, the licensee proposes updating the maximum MWH(t) value and neutron fluence prediction in the TS. | ||
3.2 NRC Staff Evaluation The NRC staff reviewed the VY submittal and the staff SEs concerning LAR Nos. 218 and 229, in addition to the SE concerning the LR, NUREG-1907 Vol. 2 (ADAMS Accession No. | 3.2 NRC Staff Evaluation The NRC staff reviewed the VY submittal and the staff SEs concerning LAR Nos. 218 and 229, in addition to the SE concerning the LR, NUREG-1907 Vol. 2 (ADAMS Accession No. ML081430109). Due to the substantial, thorough, and independent checks, already conducted in the LR review concerning the proposed new neutron fluence limit, the staff accepts the proposed update. The staff SE concerning the LR specifically noted that P-T limits must be updated prior to entering the LR period. The submittal evaluated here fulfills that expectation. | ||
ML081430109). Due to the substantial, thorough, and independent checks, already conducted in the LR review concerning the proposed new neutron fluence limit, the staff accepts the proposed update. The staff SE concerning the LR specifically noted that P-T limits must be updated prior to entering the LR period. The submittal evaluated here fulfills that expectation. | |||
The staff notes that the licensee states, on page 4 of Attachment 1 to the submittal, that the 1/4T neutron fluence predicted for the end of 60 years of operation is 5.39 x 1017 n/cm 2 , yet the proposed change to the text of the TS lists a predicted peak neutron fluence of 1/4T 5.16 x 1017 n/cm 2 . The licensee acknowledged this discrepancy and will correct it when updating the TS. | The staff notes that the licensee states, on page 4 of Attachment 1 to the submittal, that the 1/4T neutron fluence predicted for the end of 60 years of operation is 5.39 x 1017 n/cm 2 , yet the proposed change to the text of the TS lists a predicted peak neutron fluence of 1/4T 5.16 x 1017 n/cm 2 . The licensee acknowledged this discrepancy and will correct it when updating the TS. | ||
Revision as of 21:15, 6 February 2020
ML112790459 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 11/04/2011 |
From: | James Kim Plant Licensing Branch 1 |
To: | Vermont Yankee |
Kim J, NRR/DORL, 415-4125 | |
References | |
TAC ME5252 | |
Download: ML112790459 (13) | |
Text
\..~,.I\ REGv~ UNITED STATES
~vv ;'0'11 NUCLEAR REGULATORY COMMISSION I!
q:
~
0 WASHINGTON, D.C. 20555-0001
\A :
'a> Pi
'(.,
"'<? ~o
£> November 4, 2011
- i<Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION -ISSUANCE OF AMENDMENT RE: REVISED REACTOR VESSEL PRESSURE TEMPERATURE LIMITATION CURVES (TAC NO. ME5252)
Dear Sir or Madam:
The Commission has issued the enclosed Amendment No. 250 to Renewed Facility Operating License DPR-28 for the Vermont Yankee Nuclear Power Station, in response to your application dated December 21,2010, as supplemented by letter dated May 16, 2011.
The proposed amendment would revise Technical Specifications Section 3.6.A "Pressure and Temperature Limitation" to reflect the pressure and temperature limits for the reactor coolant system through, approximately the end of the prospective 20-year renewed license period, depending on the plant capacity factor.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
.k0rL,~ t~
James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosures:
- 1. Amendment No. 250 to License No. DPR-28
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
DOCKET NO. 50-271 VERMONT YANKEE NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 250 License No. DPR-28
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (the licensee) dated December 21, 2010, as supplemented by letter dated May 16, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
-2
- 2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and paragraph 3.B of the Renewed Facility Operating License No. DPR-28 is hereby amended to read as follows:
(B) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 250, are hereby incorporated in the license. Entergy Nuclear Operations, Inc. shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/k't-"r :I Ad~
Nancy L. Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: November 4, 2011
ATTACHMENT TO LICENSE AMENDMENT NO. 250 RENEWED FACILITY OPERATING LICENSE NO. DPR-28 DOCKET NO. 50-271 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove 3
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert 135 135 136 136 137 137 138 138
- 3 D. Entergy Nuclear Operations, Inc., pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any Byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components.
E. Entergy Nuclear Operations, Inc., pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.
- 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Level Entergy Nuclear Operations, Inc. is authorized to operate the facility at reactor core power levels not to exceed 1912 megawatts thermal in accordance with the Technical Specifications (Appendix A) appended hereto.
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 250 are hereby incorporated in the license. Entergy Nuclear Operations, Inc. shall operate the facility in accordance with the Technical Specifications.
C. Reports Entergy NUclear Operations, Inc. shall make reports in accordance with the requirements of the Technical Specifications.
D. This paragraph deleted by Amendment No. 226.
E. Environmental Conditions Pursuant to the Initial Decision of the presiding Atomic Safety and Licensing Board issued February 27, 1973, the following conditions for the protection of the environment are incorporated herein:
- 1. This paragraph deleted by Amendment No. 206, October 22, 2001.
- 2. This paragraph deleted by Amendment 131, 10107/91.
Renewed Facility Operating License No. DPR-28 Amendment No. 250
VYNI?S Figure 3.6.1 Reactor Vessel Pressure.Temperature Limitations Hydrostatic Pressure and Leak Tests, Core Not Critical 40*F/hr HeatuplCooldown Limit Valid Through 7.943'E8 MWH(t) 1200 1100 1+--: _+--=:-_l--+---+---..f.--+-jregion fluid temperature and
____ flange region outside surface
- . _. temperature, except when 1--1--=;:::::::;:::::::t=:e:s;;;;;::=:;:::~~c-4~-i--1-~L~--1----+-'-~" flange temperature is greater 1000 t- than 11 O*F, use only the
- ~~,.,..j.......Jdowncomer region fluid
temperature.
'iii 900
~
- r 800 0.
S
.J w ~_ . ' *
- __
- L ** _
- ____ ' ____ .L ___
- W 1:1 700 .. ~
!!! ~~~~(::~t~:~~
It S 600
!oi
~
1!: o o I
500
- E 665 253
- J 712 253
~ 253
- ) 764
(/J 400
(/J w
821 253 It 885 253 0.
954 253 300 1032 253 1032 842 1117 885 200 1211 932 1316 984 1042 100 1105 140 1175 145 1253 0
60 80 100 120 140 180 180 200 TEMPERATURE (OF)
Amendment No. ~, Q, H, .g.a., -l-2-Q., 24-3, ~ 250 l35
VYNPS Figure 3.6.2 Reactor Vessel Pressure-Temperature Limitations Normal Operation, Core Not Critical Upper Regions:
100°Flhr Heatup/Cooldown Limit Use minimum or Valid Through 7.943E8 MWH(t) dOlMlcomer region fluid r-----_,_-----.,..-------r--~--'l"T-~-"""_,_-~r__ temperature and flange region outside surface
.. temperature, except when 1200 -I-~-~~-+--i-~-i_+__+-.,__:_-+-_i_~__,:____,Ir__:_-:__:__+-+_:_- flange temperature Is greater than 1<4Q°F, use only the downcomer region fluid temperature.
hT~~~~~~GZ 1100 1000 Terrp 80 0 0 900 80 439 253 i 85 00 474 513 253 253
~:x: 000 95 555 253
~.~4.~~. ).~w_. _ w *
- 100 603 253
~ .-. ~.--. ! .... ;_._ .
- _-"*---l----r---- "'-,
105 655 253
~!!;! 700
~ ~ .....
110 115 713 m
253 253 II: 120 648 253
~
125 !m 253 600 130 1013 253 II: 135 1108 253
.~ ...~ 140 1214 253
- J 500 140 1214 roo w 145 1312 889 II:
- l 150 g)3
~ 400 155 1024 w
If 1103 300 During tensioning and detensioning operations with the vessel vented and the vessel fluid 200 -I--+-l---+--I-+---:Ilevel below the flange region, the flange temperature may be monitored with test Instrumentation in lieu of process instrumentation for the downcomer region fluid temperature and permanenl'flange region outside surface temperature. The test instrumentation uncertainty must be less than +/- 2°F. The flange region temperatures must 100 t--+----l--t---t--+--lIbe maintained greater than or equal to 72 OF when monitored with test instrumentation during tensioning, detensioning. and when tensioned.
0 00 80 100 120 140 160 160 200 TEMPERATURE (OF)
~,
Amendment No. ~ 250 136
)
Figure 3.6.3 Reactor Vessel Pressure*Temperature Limitations Normal Operation, Core Critical 100°F/hr Heatup/Cooldown Limit If Pressure < 253 pslg. Water Level must be within Normal Range for Power Operation Valid Through 7.943 E8 MWH(t)
Bottom Upper 1200 Head Regions i
0 1100 253 114 253 114 402 1000 115 407 116 413 0 120 439 253
~ 900 125 474 253
.!; 130 513 253 0 135 555 253 i:ix 800 140 603 253
- a. 145 655 253
~ 150 713 253
..J w
III 155 777 253 700 III 160 848 253
~ 165 926 253 IX
~ 170 1013 253 u 600 175 1108 253 w 180 1214 253 IX
~ 180 1214 830 I
i 500 185 1312 889
- J 190 953 w
IX j
195 1024 i-III III 400 200 1103 w
It:
205 1190
- a. 210 1258 downcomer region 300
-...:........;...+
I
- I
-~---- ----:----
fluid temperatura and flange region outside
~- ~ .;-" ..
surface temperature, 200 except when flange temperature is greater than 180*F.
use only the 100 downcomer region fluid temperature.
0 60.00 80.00 100.00 120.00 140.00 160.00 180.00 20000 TEMPERATURE (OF)
Amendment No. 3, 43, 9-3, ~ 250 137
VYNPS 3.6 and 4.6 REACTOR COOLANT SYSTEM A. Pressure and Temperature Limitations All components in the Reactor Coolant System are designed to withstand the effects of cyclic loads due to system temperature and pressure changes. These cyclic loads are introduced by normal load transients, reactor , and startup and shutdown operations. The various categories of load cycles used for design purpo~es are provided in Section 4.2 of the FSAR. During startup and shutdown, the rates of temperature and pressure changes are limited so that the maximum fied heatup and cooldown rates are consistent with the design assumptions and satisfy the stress limits for cyclic operation.
The Pressure/Temperature (P/T) curves included as Figures 3.6.1, 3.6.2, and 3.6.3 were developed using 10CFR50 Appendix G, 1995 ASME Code,Section XI, Appendix G (including the Summer 1996 Addenda), and ASME Code Case N-640. These three curves provide PIT limit requirements for Pressure Test, Core Not Critical, and Core Critical. The PIT curves are not derived from Design Basis Accident analysis. They are prescribed to avoid encountering pressure, temperature or temperature rate of change conditions that might cause undetected flaws to propagate and cause nonductile failure of the reactor pressure boundary, a condition that is unanalyzed.
During heating events, the thermal gradients in the reactor vessel wall produce thermal stresses that vary from compressive at the* inner wall to tensile at the outer wall. During cooling events the thermal
.stresses vary from tensile at the inner wall t~ compressive at the outer wall. The thermally induced tensile stresses are additive to the pressure induced tensile stresses. In the flange region, bolt preload has a significant affect on stress in the flange and adjacent plates.
Therefore heating/cooling events and bolt preload are used in the determination of the pressure-temperature limitations for the vessel~
The guidance of Branch Technical Position - MTEB 5-2, material drop weight, and Charpy impact test results were used to determine a reference nil-ductility temperature (RT~DT) for all pressure boundary components. For the plates and welds adjacent to the core, fast neutron (E > 1 Mev) irradiation will cause an increase in the RT Nw .
For these plates and welds an adjusted RT~w (ART Nw ) of 89°F and 73°F
(~ and ~ thickness locations) was conservatively used in development of these curves for core region components. Based upon ,plate and weld chemistry, initial RTNDT values, predicted peak fast neutron fluence (5.16 x 10 17 n/cm 2 at the reactor vessel inside surface) for a gross power generation of 7.943 X 10 8 MWH (t), these core region ARTNDT values conservatively bound the guidance of Regulatory Guide 1.99, Revision 2.
There were five regions of the reactor pressure vessel (RPV) that were evaluated in the development of the PIT Limit curves: (1) the reactor vessel beltline region, (2) the bottom head region, (3) the feedwater nozzle, (4) the recirculation inlet nozzle, and (5) the upper vessel flange region. These regions will bound all other regions in the vessel with respect to considerations for brittle fracture.
Two lines are shown on each PIT limit figure. The dashed line is the Bottom Head Curve. This is applicable to the bottom head area only and includes the bottom head knuckle plates and dollar plates. Based on bottom head fluid temperature and bottom head surface temperature, the reactor pressure shall be maintained below the dashed line at all times.
Amendment No. ~, ~, -S-i-, ~, -94, ~,~, ~, ~, ~ 250 138
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 250 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-28 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271
1.0 INTRODUCTION
By letter dated December 21,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103630446), as supplemented by letter dated May 16, 2011 (ML11140A083), Entergy Nuclear Operations, Inc. (the licensee) submitted a request to amend the Vermont Yankee Nuclear Power Station (VY) Technical Specifications (TS). The amendment would revise TS Section 3.6.A " Pressure and Temperature Limitation" to reflect the pressure and temperature (P-T) limits for the reactor coolant system through, apprOXimately the end of the prospective 20-year renewed license period, depending on the plant capacity factor.
The supplemental letter dated May 16, 2011, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on February 22, 2011 (76 FR 9823).
2.0 REGULATORY EVALUATION
The NRC has established requirements in Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) to protect the integrity of the reactor coolant pressure boundary in nuclear power plants. The staff evaluates the acceptability of a facility's proposed P-T limit curves based on the following NRC regulations and guidance: Appendix G, "Fracture Toughness Requirements," to 10 CFR Part 50; Appendix H, " Reactor Vessel Material Surveillance Program Requirements," to 10 CFR Part 50; Regulatory Guide (RG) 1.99, Revision 2 (Rev. 2), " Radiation Embrittlement of Reactor Vessel Materials;" and RG 1.190, Revision 0, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence." Appendix G to 10 CFR Part 50 requires that facility P-T limits for the reactor pressure vessel (RPV) be at least as conservative as those obtained by applying the linear elastic fracture mechanics methodology of Appendix G to Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code). Appendix H to 10 CFR Part 50 establishes requirements related to
-2 facility RPV material surveillance programs. RG 1.99, Revision 2, contains methodologies for determining the increase in transition temperature (adjusted reference temperature, or ART) and the decrease in upper-shelf energy (USE) resulting from neutron radiation. RG 1.190, Revision 0, contains methodologies for calculating neutron fluence.
3.0 TECHNICAL EVALUATION
3.1 Licensee Evaluation The licensee states that the P-T limit curves for TS figures 3.6.1-3 were accepted through VY License Amendment Request (LAR) No. 218, "Vermont Yankee Nuclear Power Station Issuance of Amendment Re: Reactor Pressure Vessel Fracture Toughness and Material Surveillance Requirements (TAC Nos. MB8119 and MB8379)," dated March 29,2004 (ADAMS Accession No. ML040620036). These curves were based on NRC requirements found in RG 1.190 and RG 1.99, Revision 2. The applicability of these curves was shown to be valid up to 4.46 X 108 MWH(t). The P-T limit curves were updated in 2006 through LAR No. 229, "Vermont Yankee Nuclear Power Station -Issuance of Amendment Re: Extended Power Uprate (TAC Nos. MC0761)," dated March 2, 2006 (ADAMS Accession No. ML06005005). This update raised the validity ceiling to 4.827 x 108 MWH(t).
The licensee highlighted in the discussion of LAR No. 229 regarding the NRC staff safety evaluation (SE) it was noted that VY made a highly conservative assumption in their P-T limit analysis. Specifically, the ART values used in the P-T limit analysis were from an earlier and highly conservative analysis. An independent NRC staff evaluation of VY ART values found that the P-T limits approved through LAR No. 229 were bounded through a 1/4T neutron fluence of 18 2 1.24 x 10 n/cm .
The licensee proposes updating the bounding run-time to 7.943 x 108 MWH(t), corresponding to a bounding 1/4T neutron fluence of 1.24 x 1018 n/cm 2 , while the licensee predicts that the RPV will only reach a 1/4T neutron fluence of 5.39 x 1017 n/cm 2 by the end of a 20-year license renewal (LR) period (for a total of 60 years of licensed operation). This update would support operations into the LR period beyond the original 40-year operating license.
The licensee states that in the LR application SE, the NRC staff concluded that the original P-T limits calculation would remain bounding for the license renewal period. Hence, the licensee proposes updating the maximum MWH(t) value and neutron fluence prediction in the TS.
3.2 NRC Staff Evaluation The NRC staff reviewed the VY submittal and the staff SEs concerning LAR Nos. 218 and 229, in addition to the SE concerning the LR, NUREG-1907 Vol. 2 (ADAMS Accession No. ML081430109). Due to the substantial, thorough, and independent checks, already conducted in the LR review concerning the proposed new neutron fluence limit, the staff accepts the proposed update. The staff SE concerning the LR specifically noted that P-T limits must be updated prior to entering the LR period. The submittal evaluated here fulfills that expectation.
The staff notes that the licensee states, on page 4 of Attachment 1 to the submittal, that the 1/4T neutron fluence predicted for the end of 60 years of operation is 5.39 x 1017 n/cm 2 , yet the proposed change to the text of the TS lists a predicted peak neutron fluence of 1/4T 5.16 x 1017 n/cm 2 . The licensee acknowledged this discrepancy and will correct it when updating the TS.
- 3 The licensee noted one further change to the P-T limits, namely that Table 3.6.3 contains a title of "All Regions" that should more properly be "Upper Regions." This alteration is appropriate as the original title was in error.
The staff has concluded that the proposed changes are consistent with the intent and requirements of the applicable regulations and guidance found in Appendix G and H to 10 CFR Part 50; as well as RG 1.99, Revision 2, and RG 1.190, Revision O.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Vermont State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in amounts, and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (76 FR 9823). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: D. Widrevitz Date: November 4, 2011
November 4,2011 Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION -ISSUANCE OF AMENDMENT RE: REVISED REACTOR VESSEL PRESSURE TEMPERATURE LlIVIITATION CURVES (TAC NO. ME5252)
Dear Sir or Madam:
The Commission has issued the enclosed Amendment No. 250 to Renewed Facility Operating License DPR-28 for the Vermont Yankee Nuclear Power Station, in response to your application dated December 21, 2010, as supplemented by letter dated May 16, 2011.
The proposed amendment would revise Technical Specifications Section 3.6.A "Pressure and Temperature Limitation" to reflect the pressure and temperature limits for the reactor coolant system through, approximately the end of the prospective 20-year renewed license period, depending on the plant capacity factor.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, Ira/
James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosures:
- 1. Amendment No. 250 to License No. DPR-28
- 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRI BUTION:
PUBLIC R. Bellamy, RI RidsRgn1 MailCenter RidsNrrDorlLpl1-1 Resource RidsNrrLASLittle RidsNrrDssSrxb Resource RidsNrrDorlDpr Resource RidsNrrPMVermontYankee RidsNrrDirsltsb Resource RidsAcrsAcnw_MailCenter Resource RidsOgcMailCenter Resource Accession No.: M L112790459 *S ee memo dated September 30, 2011 OFFICE LPL1-1/PM LPL 1-1/LA CVIBIBC ITSBIBC OGC LPL 1-1/BC NAIVIE JKim SLittie MMitchell* RElliott LSubin NSalgado DATE 10/26/11 10/26/11 9/30/11 10/26/11 11/02/11 11/4/11 OFFICIAL RECORD COpy