Line 2: |
Line 2: |
| | number = ML18337A221 | | | number = ML18337A221 |
| | issue date = 12/03/2018 | | | issue date = 12/03/2018 |
| | title = 2018/12/03 Vogtle COL Docs - Staff Comments Draft B Exemption Request for Transferring Operator Pass Letters from VCS to Vegp Docket | | | title = COL Docs - Staff Comments Draft B Exemption Request for Transferring Operator Pass Letters from VCS to Vegp Docket |
| | author name = | | | author name = |
| | author affiliation = NRC | | | author affiliation = NRC |
|
---|
Category:E-Mail
MONTHYEARML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request 2024-09-03
[Table view] |
Text
Vogtle PEmails From: Hoellman, Jordan Sent: Monday, December 3, 2018 12:00 PM To: Roberts, Kelli Anne; Patel, Chandu Cc: Nist, Lauren; Guthrie, Eugene; Fergen, Pamela S.; Pugh, Amanda Louise; Agee, Stephanie Y.; Vogtle PEmails
Subject:
Staff Comments RE: Draft B Exemption Request for Transferring Operator Pass Letters from VCS to VEGP Docket Attachments: Staff Comments on Draft B 11_30_2018.docx Hi Kelli, Please see the attached staff comments regarding SNCs draft B exemption request and block 25 comments for transferring operator pass letters from VC Summer to Vogtle (ADAMS Accession No. ML18332A493). These comments will be used to support the discussions at the December 6, 2018, public meeting.
Please note that although we are providing feedback on these drafts, when the request is officially submitted, there may be other questions that need to be addressed in additional public meeting discussions or through the request for additional information (RAI) process.
Thank you, Jordan Jordan Hoellman Project Manager NRO / DLSE / LB4 U.S. Nuclear Regulatory Commission office: OWFN 08-C18 phone: (301) 415-5481 email: Jordan.Hoellman2@nrc.gov From: Roberts, Kelli Anne [1]
Sent: Friday, November 09, 2018 11:34 AM To: Hoellman, Jordan <Jordan.Hoellman2@nrc.gov>; Patel, Chandu <Chandu.Patel@nrc.gov>
Cc: Nist, Lauren <lauren.nist@nrc.gov>; Guthrie, Eugene <Eugene.Guthrie@nrc.gov>; Fergen, Pamela S.
<X2PSFERG@SOUTHERNCO.COM>; Pugh, Amanda Louise <ALPUGH@southernco.com>; Agee, Stephanie Y.
<SYAGEE@southernco.com>
Subject:
[External_Sender] Draft B Exemption Request for Transferring Operator Pass Letters from VCS to VEGP Docket
- Jordan, Following the 9/6 pre-submittal meeting, the attached draft B exemption request and draft B Block 25 Comments for NRC Form 398 have been prepared. No changes were made to the draft NRC Form 398 provided in support of the 9/6 pre-submittal meeting, but it is also attached for completeness. We would like to discuss draft B with staff during the public call on December 6, if possible. Please let me know if staff can support the requested 12/6 pre-submittal meeting for draft B. The documents have placeholders for personally identifiable information (PII), but all PII has been removed for the purposes of supporting the pre-submittal meeting. Thus, the entirety of the attached documents can be made available to the public; final submittal will have withheld PII.
1
I have also attached a word file of draft B with tracked changes as a courtesy to staff to make it easier to see what changes have been made.
Please let me know if you have questions.
- Thanks,
__________________________________
Kelli Roberts l Southern Nuclear Operating Company Vogtle 3&4 Licensing Supervisor 2
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 392 Mail Envelope Properties (SN6PR0901MB23669B235EBE1BA862850BD8D5AE0)
Subject:
Staff Comments RE: Draft B Exemption Request for Transferring Operator Pass Letters from VCS to VEGP Docket Sent Date: 12/3/2018 12:00:28 PM Received Date: 12/3/2018 12:00:37 PM From: Hoellman, Jordan Created By: Jordan.Hoellman2@nrc.gov Recipients:
"Nist, Lauren" <lauren.nist@nrc.gov>
Tracking Status: None "Guthrie, Eugene" <Eugene.Guthrie@nrc.gov>
Tracking Status: None "Fergen, Pamela S." <X2PSFERG@SOUTHERNCO.COM>
Tracking Status: None "Pugh, Amanda Louise" <ALPUGH@southernco.com>
Tracking Status: None "Agee, Stephanie Y." <SYAGEE@southernco.com>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None "Roberts, Kelli Anne" <KROBERTS@southernco.com>
Tracking Status: None "Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None Post Office: SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2538 12/3/2018 12:00:37 PM Staff Comments on Draft B 11_30_2018.docx 32339 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
- 1. The scope of the exemption request should also include 55.31(a)(3), which requires each applicant for an operators license to submit a written request from an authorized representative of the facility licensee by which the applicant will be employed that the written examination and operating test be administered to the applicant.
- 2. A. Please explain whether common means same (e.g., in Enclosure 1 of Draft B of letter ND-18-1126, Page 7/12 where it states, A review of testable knowledge and abilities for site-specific systems was conducted; the subject of all catalog items was traced back to lesson plans which were developed from a consistent set of AP1000 materials. Therefore, it was determined that all testable knowledge and abilities were included in common AP1000 systems training and/or procedure training.). If it does not mean same, please describe the differences between the training materials and procedures.
B. Also, Encl 1, Page 7/12 says, A review of testable knowledge and abilities for site-specific systems was conducted; the subject of all catalog items was traced back to lesson plans which were developed from a consistent set of AP1000 materials.
Therefore, it was determined that all testable knowledge and abilities were included in common AP1000 systems training and/or procedure training. Please explain whether SNC addressed any gaps in knowledge of the VEGP 3 site-specific systems.
- 3. Please clarify whether the procedure exam discussed in Encl 1, Page 8/12 also tested knowledge of the emergency plan implementing procedures.
- 4. Encl 1, Page 8/12, says procedure gap training was conducted by self-study of VEGP 3 conduct of operations procedures. Please describe the nature of the subjects that were included in the conduct of operations procedures and training.
- 5. Encl 1, page 7/12 says that SNC looked for testable differences between the task lists.
Please explain whether the task list gap analysis was sufficient to also identify any significant differences in the technical specifications and operational characteristics between the two sites.
- 6. Encl 1, Page 7/12, says SNC did a line by line comparison of tasks, all tasks were the same, but procedures varied. Please clarify if the procedures were those procedures cited in the task statements.
- 7. Encl 1, Page 10/12, please explain in the request how granting the exemption would avoid duplication of efforts and ensure trained personnel are available to support activities at VEGP Unit 3 and conserve NRC and licensee resources.
- 8. Encl 1, Page 10/12, says, Successful completion of the licensed examination and test indicated licensed operator candidates have learned to operate an AP1000 facility safely and competently. Successful completion of a licensed operator exam indicates candidates have learned to safely operate a particular facility; in this case, the facility is VC Summer Unit 2. The request should address how completion of that exam, plus any corrective actions SNC has taken to address knowledge gaps, demonstrate the candidates have learned to operate VEGP 3 safely and competently.