OPERATLNG DATA REPORT DOCKET NO. 50-336 DATE 8/2/79 COMPLETED BY G.H. Howlett TELEPHONE 203/447-1791 X364 OPERATING STATUS Notes *l Items 21 and 22 | OPERATLNG DATA REPORT DOCKET NO. 50-336 DATE 8/2/79 COMPLETED BY G.H. Howlett TELEPHONE 203/447-1791 X364 OPERATING STATUS Notes *l Items 21 and 22 | ||
: 1. Unit Name: l'i.llstone 2 Yr-To-Date and cumulative | : 1. Unit Name: l'i.llstone 2 Yr-To-Date and cumulative | ||
Line 47: | Line 46: | ||
7908160 | 7908160 | ||
O f f' U.E D ALLY UNil POhf R LE\ EL DOCKE F NO. 50-336 UNir Mil.lstone_2_. | O f f' U.E D ALLY UNil POhf R LE\ EL DOCKE F NO. 50-336 UNir Mil.lstone_2_. | ||
D 41 E 8/2/79 CO .1PLE I E D 11Y _G.H. Howlett T El.EPHOVE 203/447-1791 X364 ms ni July 1979 D \Y O I R \t.E D \!L) I Ohi-R I I \ F L D -\ Y .O E R \GF D ALLY POhER LE\ FL i .t h: Nrt i | D 41 E 8/2/79 CO .1PLE I E D 11Y _G.H. Howlett T El.EPHOVE 203/447-1791 X364 ms ni July 1979 D \Y O I R \t.E D \!L) I Ohi-R I I \ F L D -\ Y .O E R \GF D ALLY POhER LE\ FL i .t h: Nrt i | ||
'\f N Ncti 1 | '\f N Ncti 1 | ||
863 _ 17 _ __ 862 _ __ | 863 _ 17 _ __ 862 _ __ | ||
864 _ is __861 _ | 864 _ is __861 _ | ||
3 864 __ io __ | 3 864 __ io __ | ||
860 | 860 4 _ _ | ||
4 _ _ | |||
864. _. _ _ :o . | 864. _. _ _ :o . | ||
859 . _ _ _ _ _ | 859 . _ _ _ _ _ | ||
5 863 _ 21 . | 5 863 _ 21 . | ||
858 6 862 ,, | 858 6 862 ,, | ||
857 | 857 | ||
- 862 ,, 857 . | - 862 ,, 857 . | ||
s _ ___861__._ ___ 24 857 9 860 ,3 856 to _ . . _ . 858_ _ ._ :n 856__ _ _ _ | s _ ___861__._ ___ 24 857 9 860 ,3 856 to _ . . _ . 858_ _ ._ :n 856__ _ _ _ | ||
ii 861 ,- 712 1, 847 ,s _ | ii 861 ,- 712 1, 847 ,s _ | ||
854 | 854 13 860 _ 29 _ _ _ _ | ||
13 860 _ 29 _ _ _ _ | |||
858 __ ____ _ | 858 __ ____ _ | ||
14 781 __ | 14 781 __ | ||
Line 81: | Line 71: | ||
798 348 | 798 348 | ||
s DOCKET NO. 60-116 UNIT SilUTDOWN5 AND POWER REDUCTIONS Mill onno 2 UNIT NAME DATE R/7/79 COMPLETED BY G.H. Howlett REPORT MONT11 July 19 3 TELEPl10NE '701/447-1741 X364' I | |||
s | |||
DOCKET NO. 60-116 UNIT SilUTDOWN5 AND POWER REDUCTIONS Mill onno 2 UNIT NAME DATE R/7/79 COMPLETED BY G.H. Howlett REPORT MONT11 July 19 3 TELEPl10NE '701/447-1741 X364' | |||
I | |||
m ~2 -C 4 C, et g -s Licensee Cause & Corrective m No. Date E. '5 5 !2 3 .g j Event 5 *. | m ~2 -C 4 C, et g -s Licensee Cause & Corrective m No. Date E. '5 5 !2 3 .g j Event 5 *. | ||
~? | ~? | ||
g 57 Ed Action to | g 57 Ed Action to | ||
# 33 oO e 5 3 cc Renort # mL gu Prevent Recurrence g di { CC C 7 | # 33 oO e 5 3 cc Renort # mL gu Prevent Recurrence g di { CC C 7 N | ||
6 790727 F 0 A 4 ti/A HJ PIPE XX Power was manually reduced to 68% to allow the isolation of a Heater Drains - | |||
line leak. Weld repairs were completec and normal power operations resumed. | line leak. Weld repairs were completec and normal power operations resumed. | ||
l | l Sun:r,a ry : The ur.it operated at or near full pawer tiiroughout the reporting period except for the power reduction 27th. | ||
Sun:r,a ry : The ur.it operated at or near full pawer tiiroughout the reporting period except for the power reduction 27th | |||
Docket No. 50-336 Page 1 of 1 Date 8/7/79 | Docket No. 50-336 Page 1 of 1 Date 8/7/79 | ||
. Unit Name Millstone 2 Completed By G.H. Howlett | . Unit Name Millstone 2 Completed By G.H. Howlett Telephone 203/447-1791 X364 CORRECTIVE MAINTENANCE | ||
Telephone 203/447-1791 X364 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | ==SUMMARY== | ||
Line 116: | Line 92: | ||
6/19/79 Auxiliary Feedwater Aux Feed Pump P-93 Replaced failed bearing and rebuilt pump. , | 6/19/79 Auxiliary Feedwater Aux Feed Pump P-93 Replaced failed bearing and rebuilt pump. , | ||
6/19/79 Reactor Protection RPS Ch. 'D' Bistable power supply Replaced _+ 15 VDC power supply. | 6/19/79 Reactor Protection RPS Ch. 'D' Bistable power supply Replaced _+ 15 VDC power supply. | ||
6/29/79 Non-Radwaste ' A' DC Switchgear Room supply fan Replaced failed bearings Ventilation F-54A w | |||
6/29/79 Non-Radwaste ' A' DC Switchgear Room supply fan Replaced failed bearings Ventilation F-54A | 0 | ||
~ . | ~ . |
Latest revision as of 06:28, 2 February 2020
ML19207A323 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 08/02/1979 |
From: | Howlett G NORTHEAST UTILITIES |
To: | |
Shared Package | |
ML19207A321 | List: |
References | |
NUDOCS 7908160444 | |
Download: ML19207A323 (4) | |
Text
.
OPERATLNG DATA REPORT DOCKET NO. 50-336 DATE 8/2/79 COMPLETED BY G.H. Howlett TELEPHONE 203/447-1791 X364 OPERATING STATUS Notes *l Items 21 and 22
- 1. Unit Name: l'i.llstone 2 Yr-To-Date and cumulative
- 2. Reporting Period: Juiv 1979 re computed by using a
- 3. Licensed Thermal Power (MWtp: 2700 weighted average.
- 4. Nameplate Rating (Gross MWe): 909 S. Design Electrical Rating (Net MWe): 870
- 6. Maximum Dependable Capacity (Gross MWe): 896
- 7. Masimum Dependable Capacity (Net MWe): 864
- 8. !f Changes Occur in Capacity Rt.:ngs (Items Number 3 Through 7) Since Lrst Report. Give Reascns:
Items 5, 6 & 7 reflect increase in L~, ?nsed Thermal Power from 2560 to 2700 Mwth.
- 9. Power Lesel To Which Restricted.lf Any (Net MWe): None
- 10. Reasons For Restrictions. If Any: None This Month Yr -to-Dat e Cumulative il. Hours in Reporting Period 744 5,087 31.535
- 12. Number Of Hours Reactor Was Critical 744 3,135.7 22.663.4
- 13. Reactor Reserve Shutdown Hours 0 71- 2.072.4
- 14. Hours Generator On-Line 744 3.005.6 21.437.3
- 15. Unit Reserve Shutdown Hours 0 109.4 335.4
- 16. Gross Thermal Energy Generated (MWH) 1.989.041 7.531.524 51.413,757 .
- 17. Gross Electrical Energy Generated (MWH) 656J60 2,485,850 16,514,651
- 18. Net Electrical Energy Generated (MWH) 633,743 2,376,218 15,792,909
- 19. Unit Sersice Factor 100 59.1 68.0
- 20. Unit Asailability Factor 100 61.2 69..
- 21. Unit Capacity Factor (Using MDC Net) 98.6 67.4 *l 61.8 *l
- 22. Unit Capacity Factor (Using DER Net) 97.9 56.1 *1 60.3 *1
- 23. Unit Forced Outage Rate 0 7.3 22'.3
- 24. Shutdowns Scheduled Oser Next 6 Months (T)pe. Date, and Duration of Eacht-Steam Generator Feedwater Nozzle Inspection, Sept.mber 1, 1979, 3 Weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A 26 Units In Test Status (Prior to Commercia! Operation): Forecast Achiesed INITIA' CRITICALITY N/A N/A '
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPER ATION N/A N/A 798, 347 (9/77 )
7908160
O f f' U.E D ALLY UNil POhf R LE\ EL DOCKE F NO. 50-336 UNir Mil.lstone_2_.
D 41 E 8/2/79 CO .1PLE I E D 11Y _G.H. Howlett T El.EPHOVE 203/447-1791 X364 ms ni July 1979 D \Y O I R \t.E D \!L) I Ohi-R I I \ F L D -\ Y .O E R \GF D ALLY POhER LE\ FL i .t h: Nrt i
'\f N Ncti 1
863 _ 17 _ __ 862 _ __
864 _ is __861 _
3 864 __ io __
860 4 _ _
864. _. _ _ :o .
859 . _ _ _ _ _
5 863 _ 21 .
858 6 862 ,,
857
- 862 ,, 857 .
s _ ___861__._ ___ 24 857 9 860 ,3 856 to _ . . _ . 858_ _ ._ :n 856__ _ _ _
ii 861 ,- 712 1, 847 ,s _
854 13 860 _ 29 _ _ _ _
858 __ ____ _
14 781 __
.s o 858 is . _ . 852 ._ zi 858 to _
861 _
IM IRl'(IlONS
't '. . , ' ' '
. Lf ac to l'l ^')
798 348
s DOCKET NO.60-116 UNIT SilUTDOWN5 AND POWER REDUCTIONS Mill onno 2 UNIT NAME DATE R/7/79 COMPLETED BY G.H. Howlett REPORT MONT11 July 19 3 TELEPl10NE '701/447-1741 X364' I
m ~2 -C 4 C, et g -s Licensee Cause & Corrective m No. Date E. '5 5 !2 3 .g j Event 5 *.
~?
g 57 Ed Action to
- 33 oO e 5 3 cc Renort # mL gu Prevent Recurrence g di { CC C 7 N
6 790727 F 0 A 4 ti/A HJ PIPE XX Power was manually reduced to 68% to allow the isolation of a Heater Drains -
line leak. Weld repairs were completec and normal power operations resumed.
l Sun:r,a ry : The ur.it operated at or near full pawer tiiroughout the reporting period except for the power reduction 27th.
Docket No. 50-336 Page 1 of 1 Date 8/7/79
. Unit Name Millstone 2 Completed By G.H. Howlett Telephone 203/447-1791 X364 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month June 1979 DATE SYSTEM COMPONENT MAINTENANCE ACTION 6/13/79 Reactor Coolant ?-RC-252 Loop 1A Spray Header Replaced leaking seal ring. c3 Molation Valve. tr3 m
6/13/79 Reactor Coolant 2-RC-253 l oop 1B Spray Header Replaced leaking seal ring.
Isolation Valve.
cc Replaced leaking seal ring. C7' 6/14/79 Reactor Coolant 2-RC-405 Pressurizer power I'
aperated relief isolation valve. I
. i- .
6/19/79 Auxiliary Feedwater Aux Feed Pump P-93 Replaced failed bearing and rebuilt pump. ,
6/19/79 Reactor Protection RPS Ch. 'D' Bistable power supply Replaced _+ 15 VDC power supply.
6/29/79 Non-Radwaste ' A' DC Switchgear Room supply fan Replaced failed bearings Ventilation F-54A w
0
~ .
Docket No. 50-336 Date: 8/2/79 Completed By: G.H. Howlett III Telephone: 203/447-1971 X364 REFUELING INFORMATION REQUEST
- 1. Name of facility: Millstone 2
- 2. Scheduled date for next refueling shutdown June 28, 1980
- 3. Schedule date for restart following refueling: August 1, 1980
- 4. Will refueling or resumption of operation thereafter require a technica' specification change or other license amendment?
Technical Specification changes will be necessary as a result of the change in fuel and safety analysis supplier.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
The schedule for submitting proposed license action is as follows:
Basic Safety Report 2-1-80 ECCS Results 4 ' 80 Reload Safety Evaluation 5-1-80
- 6. Important licens;,a considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Cycle 4 will be unique in that it will be the first where the fuel and safety analysis will be supplied by Westinghouse.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Core: 217 (b) 144 (a) _ _
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed stcrage capacity that has been requested or is planned, in number of fuel assemblies:
667
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1983, Spent Fuel Pool, full core off load capability is reached.
1986, Ne Full, Spent Fuel Pool contains 648 bundles.
798. 351