ML042990558: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:DRAFT OUTLINE COM MENTS Admi nist rat ive JPMs*Radiation control topic involving entry and exit from the RCA for bot h the RO and SRO is too simpl e and shoul d not b e used. Resolution: T he JPM will be more challenging be cause the en try will involv e an additiona l entry in to a high radia tion area.Walk-throughs
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Administrative JPMs
*What walk-throughs will be performed together?
* Radiation control topic involving entry and exit from the RCA for both the RO and SRO is too simple and should not be used. Resolution: The JPM will be more challenging because the entry will involve an additional entry into a high radiation area.
ANS: JPMs 6, 7, an d 8 and JP Ms 2 and 3 w ill be pe rfo rme d si mul tan eou sly.*Any repeat use of previo us NRC ex am material? If so how much (i n percentage) is the repeat? ANS: One JPM, #200
Walk-throughs
-08, is the only part of the ex am that is repea ted from the last N RC ex am.Scenarios*Identi fy the actual attrib utes gi ven o n ES-3 01-4*Form ES-301-5, S cenario 1, R O: The BOP does n ot have a normal evol ution and th e RO numb er 4 for Instrume nt/comp onent shoul d be n umber 5. Resolution: Will mak e changes to th e ES-301-5 for ms.*Form ES-301-5, S cenario 1, S RO-I: As RO, the n umber 4 for instrument/co mponent shoul d be n umber 5. Resolution: Will mak e changes to the ES-301-5 forms.*I would like each spe cific appli cant to have their ow n ES-301-5.
* What walk-throughs will be performed together? ANS: JPMs 6, 7, and 8 and JPMs 2 and 3 will be performed simultaneously.
Written*Pleas e inc lude the KA descri ption on the referen ce wr itten exam.*For K/As that re quire the use o f procedures, be su re that the questio n references a procedure.
* Any repeat use of previous NRC exam material? If so how much (in percentage) is the repeat? ANS: One JPM, #200-08, is the only part of the exam that is repeated from the last NRC exam.
*Need a cross-referenc e betw een th e outl ine s ubject and th e questi on dev elope d to addres s this subjec t. Resolution: A cross referen ce will be developed
Scenarios
.*Record of rejected K As, SRO Page 1 5th table en try, why rejected?
* Identify the actual attributes given on ES-301-4
ANS: A gree, the KA s ho ul d n ot be re je ct ed. W il l d ev el op a q ue st io n f or th is KA.General*Would like a sepa rate l istin g of the P RA an d IPE insi ghts (ES 201-2 item 4 a).*Any repeats from the audit ex amination (ES 201-2, item 3a (3))? ANS: No  
* Form ES-301-5, Scenario 1, RO: The BOP does not have a normal evolution and the RO number 4 for Instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
*Which W/T JPM meets the response to th e emergency or a bnormal condi tion (ES 201
* Form ES-301-5, Scenario 1, SRO-I: As RO, the number 4 for instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
-2, item 3b(3))?
* I would like each specific applicant to have their own ES-301-5.
ANS: In-plant walk-throughs 1 and 2.*Is any SROU going to take only the 25 questio n test? ANS: No}}
Written
* Please include the KA description on the reference written exam.
* For K/As that require the use of procedures, be sure that the question references a procedure.
* Need a cross-reference between the outline subject and the question developed to address this subject. Resolution: A cross reference will be developed.
* Record of rejected KAs, SRO Page 1 5th table entry, why rejected? ANS: Agree, the KA should not be rejected. Will develop a question for this KA.
General
* Would like a separate listing of the PRA and IPE insights (ES 201-2 item 4a).
* Any repeats from the audit examination (ES 201-2, item 3a(3))? ANS: No
* Which W/T JPM meets the response to the emergency or abnormal condition (ES 201-2, item 3b(3))? ANS: In-plant walk-throughs 1 and 2.
* Is any SROU going to take only the 25 question test? ANS: No}}

Latest revision as of 01:51, 24 November 2019

RB-09-2004 - Draft - Outline Comments
ML042990558
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/23/2004
From: Gody A
Operations Branch IV
To: Hinnenkamp P
Entergy Operations
References
50-458/04-301, RB-09-2004 50-458/04-301
Download: ML042990558 (2)


Text

DRAFT OUTLINE COMMENTS Administrative JPMs

  • Radiation control topic involving entry and exit from the RCA for both the RO and SRO is too simple and should not be used. Resolution: The JPM will be more challenging because the entry will involve an additional entry into a high radiation area.

Walk-throughs

  • What walk-throughs will be performed together? ANS: JPMs 6, 7, and 8 and JPMs 2 and 3 will be performed simultaneously.
  • Any repeat use of previous NRC exam material? If so how much (in percentage) is the repeat? ANS: One JPM, #200-08, is the only part of the exam that is repeated from the last NRC exam.

Scenarios

  • Identify the actual attributes given on ES-301-4
  • Form ES-301-5, Scenario 1, RO: The BOP does not have a normal evolution and the RO number 4 for Instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
  • Form ES-301-5, Scenario 1, SRO-I: As RO, the number 4 for instrument/component should be number 5. Resolution: Will make changes to the ES-301-5 forms.
  • I would like each specific applicant to have their own ES-301-5.

Written

  • Please include the KA description on the reference written exam.
  • For K/As that require the use of procedures, be sure that the question references a procedure.
  • Need a cross-reference between the outline subject and the question developed to address this subject. Resolution: A cross reference will be developed.
  • Record of rejected KAs, SRO Page 1 5th table entry, why rejected? ANS: Agree, the KA should not be rejected. Will develop a question for this KA.

General

  • Would like a separate listing of the PRA and IPE insights (ES 201-2 item 4a).
  • Any repeats from the audit examination (ES 201-2, item 3a(3))? ANS: No
  • Which W/T JPM meets the response to the emergency or abnormal condition (ES 201-2, item 3b(3))? ANS: In-plant walk-throughs 1 and 2.
  • Is any SROU going to take only the 25 question test? ANS: No