{{#Wiki_filter:January 27, 2006Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
{{#Wiki_filter:January 27, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
WATTS BAR NUCLEAR PLANT, UNIT 1 - RELIEF REQUEST 1-RR-07 ON THEUSE OF ASME CODE CASE N-597-1 TO EVALUATE PIPE WALL THINNING (TAC NO. MC6512)
WATTS BAR NUCLEAR PLANT, UNIT 1 - RELIEF REQUEST 1-RR-07 ON THE USE OF ASME CODE CASE N-597-1 TO EVALUATE PIPE WALL THINNING (TAC NO. MC6512)


==Dear Mr. Singer:==
==Dear Mr. Singer:==


In a letter dated March 25, 2005 (ADAMS Accession No. ML050970082), Tennessee ValleyAuthority (the licensee), pursuant to Title 10 of the Code of Federal RegulationsSection 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineers (ASME) Code, Section XI, requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at its Watts Bar Nuclear Power Plant(WBN), Unit 1. Instead, the licensee proposed to use the provisions of ASME Code Case N-597-1, "Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1,"
In a letter dated March 25, 2005 (ADAMS Accession No. ML050970082), Tennessee Valley Authority (the licensee), pursuant to Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineers (ASME) Code, Section XI, requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at its Watts Bar Nuclear Power Plant (WBN), Unit 1. Instead, the licensee proposed to use the provisions of ASME Code Case N-597-1, Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1, to analytically evaluate the potential pipe wall thinning.
to analytically evaluate the potential pipe wall thinning.As discussed in the enclosed evaluation, the Nuclear Regulatory Commission staff hasconcluded that, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the currentoperating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.Sincerely,/RA by BMozafari for/ Michael L. Marshall, Jr., ChiefPlant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-390
As discussed in the enclosed evaluation, the Nuclear Regulatory Commission staff has concluded that, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the current operating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Sincerely,
                                              /RA by BMozafari for/
Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390


==Enclosure:==
==Enclosure:==
As stated cc: See next page  
As stated cc: See next page


ML050970082), Tennessee ValleyAuthority (the licensee), pursuant to Title 10 of the Code of Federal RegulationsSection 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineers (ASME) Code, Section XI, requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at its Watts Bar Nuclear Power Plant(WBN), Unit 1. Instead, the licensee proposed to use the provisions of ASME Code Case N-597-1, "Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1,"
ML050970082), Tennessee Valley Authority (the licensee), pursuant to Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineers (ASME) Code, Section XI, requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at its Watts Bar Nuclear Power Plant (WBN), Unit 1. Instead, the licensee proposed to use the provisions of ASME Code Case N-597-1, Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1, to analytically evaluate the potential pipe wall thinning.
to analytically evaluate the potential pipe wall thinning.As discussed in the enclosed evaluation, the Nuclear Regulatory Commission staff hasconcluded that, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the currentoperating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.Sincerely, /RA by BMozafari for/Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-390
As discussed in the enclosed evaluation, the Nuclear Regulatory Commission staff has concluded that, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the current operating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Sincerely,
                                                  /RA by BMozafari for/
Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390


==Enclosure:==
==Enclosure:==
As stated cc: See next page DISTRIBUTION
As stated cc: See next page DISTRIBUTION:
:PUBLICLPLII-2 r/fRidsAcrsAcnwMailcenterRidsNrrDorlLpld GGeorgievMVaalerRidsNrrPMDPickettRidsOgcRp KManolyMHartzmanRSola(paper copy)RidsNrrDorlLpld TChanRidsRgn2MailCenter (SCahill)ADAMS Accession No.: ML060110438*No Legal Objection          NRR-106OFFICELPL2-2/PELPL2-2/LALPL2-2/PMDCI/CPNBDE/EEMBOGCLPL2-2/BCNAMEMVaalerRSolaDPickettTChanKManolySHamrick*BMozafari forMMarshallDATE1/18/061/18/061/19/06by memo dated 12 / 23 / 05by memodated12 / 23 / 05 1/23/06 1/27/ 06 Mr. Karl W. Singer  Tennessee Valley AuthorityWATTS BAR NUCLEAR PLANT cc:Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN  37402-2801  Mr. Larry S. Bryant, Vice PresidentNuclear Engineering and Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN  37402-2801Mr. Robert J. Beecken, Vice PresidentNuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN  37402-2801  Mr. Michael D. SkaggsSite Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN  37381General CounselTennessee Valley Authority ET 11A 400 West Summit Hill DriveKnoxville, TN 37902Mr. John C. Fornicola, ManagerNuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN  37402-2801 Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801Mr. Paul L. Pace, ManagerLicensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381Mr. Jay Laughlin, Plant ManagerWatts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN  37381Senior Resident InspectorWatts Bar Nuclear Plant U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN  37381County Executive 375 Church Street Suite 215 Dayton, TN  37321County Mayor P. O. Box 156 Decatur, TN  37322Mr. Lawrence E. Nanney, DirectorDivision of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN  37243-1532Ms. Ann P. Harris341 Swing Loop Road Rockwood, Tennessee  37854 EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONTENNESSEE VALLEY AUTHORITYRELIEF REQUEST TO USE CODE CASE N-597-1 TO ANALYTICALLY EVALUATEPIPE WALL THINNING OF ASME CLASS 2 CARBON STEEL MAIN FEEDWATER PIPING WATTS BAR NUCLEAR PLANT, UNIT 1DOCKET NO. 50-39
PUBLIC          LPLII-2 r/f            RidsAcrsAcnwMailcenter                    RidsNrrDorlLpld GGeorgiev      MVaaler                RidsNrrPMDPickett                        RidsOgcRp KManoly        MHartzman              RSola(paper copy)                         RidsNrrDorlLpld TChan          RidsRgn2MailCenter (SCahill)
ADAMS Accession No.: ML060110438                               *No Legal Objection          NRR-106 OFFICE    LPL2-2/PE      LPL2-2/LA    LPL2-2/PM      DCI/CPNB        DE/EEMB          OGC        LPL2-2/BC BMozafari for NAME        MVaaler        RSola        DPickett        TChan        KManoly        SHamrick*
MMarshall by memo by memo dated DATE        1/18/06      1/18/06        1/19/06                            dated       1/23/06      1/27/ 06 12 / 23 / 05   12 / 23 / 05


==01.0INTRODUCTION==
Mr. Karl W. Singer Tennessee Valley Authority                    WATTS BAR NUCLEAR PLANT cc:
By letter dated March 25, 2005 (ADAMS Accession No. ML050970082), Tennessee ValleyAuthority (TVA, the licensee), pursuant to Title 10 of the Code of Federal Regulations (10 CFR)Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineering (ASME) Code Section XI requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at Watts Bar Nuclear Plant (WBN),Unit 1. As an alternative, the licensee proposed to use the provisions of ASME Code Case N-597-1, "Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1,"
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Glenn W. Morris, Manager Nuclear Operations                            Corporate Nuclear Licensing Tennessee Valley Authority                      and Industry Affairs 6A Lookout Place                              Tennessee Valley Authority 1101 Market Street                            4X Blue Ridge Chattanooga, TN 37402-2801                    1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice President Nuclear Engineering and Technical Services    Mr. Paul L. Pace, Manager Tennessee Valley Authority                    Licensing and Industry Affairs 6A Lookout Place                              Watts Bar Nuclear Plant 1101 Market Street                            Tennessee Valley Authority Chattanooga, TN 37402-2801                    P.O. Box 2000 Spring City, TN 37381 Mr. Robert J. Beecken, Vice President Nuclear Support                              Mr. Jay Laughlin, Plant Manager Tennessee Valley Authority                    Watts Bar Nuclear Plant 6A Lookout Place                              Tennessee Valley Authority 1101 Market Street                            P.O. Box 2000 Chattanooga, TN 37402-2801                    Spring City, TN 37381 Mr. Michael D. Skaggs                        Senior Resident Inspector Site Vice President                          Watts Bar Nuclear Plant Watts Bar Nuclear Plant                      U.S. Nuclear Regulatory Commission Tennessee Valley Authority                    1260 Nuclear Plant Road P.O. Box 2000                                Spring City, TN 37381 Spring City, TN 37381 County Executive General Counsel                              375 Church Street Tennessee Valley Authority                    Suite 215 ET 11A                                        Dayton, TN 37321 400 West Summit Hill Drive Knoxville, TN 37902                          County Mayor P. O. Box 156 Mr. John C. Fornicola, Manager                Decatur, TN 37322 Nuclear Assurance and Licensing Tennessee Valley Authority                    Mr. Lawrence E. Nanney, Director 6A Lookout Place                              Division of Radiological Health 1101 Market Street                            Dept. of Environment & Conservation Chattanooga, TN 37402-2801                    Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, Tennessee 37854
to analytically evaluate the effect of potential pipe wall thinning in an elbow on the structural integrity of the system under the Faulted Condition loading, which included Check Valve Slam(CVS) waterhammer and Safe Shutdown Earthquake (SSE) seismic loading. The potential pipe wall thinning was projected to take place by the WBN CHECWORKS program. During implementation of WBN's Unit 1 Cycle 6 Refueling Outage (RFO) Flow AcceleratedCorrosion (FAC) Program, ultrasonic examination (UT) detected wall thinning in an ASME Code Class 2 main feedwater piping elbow at the steam generator Loop 2 inlet nozzle. Currently, the thickness is greater than the ASME Code required minimum wall thickness tmin. Based on UTthickness measurements and the predicted wear rate, it was determined that the predicted wallthickness t p will fall below the required minimum wall thickness tmin 13 months after startup fromthe RFO. The other three steam generator elbows to the inlet nozzles were ultrasonically examined and were found acceptable. Specifically, the UT examination of the elbow found the current minimum measured wallthickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the samelocation as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using anestimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),
the predicted wall thickness t p at the Cycle 7 RFO is calculated to be 0.605 inches. Theallowable minimum wall thickness tmin as calculated by the equation specified in CodeCase N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. As noted, the predicted wall thickness


t p of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches, but will begreater than 90 percent of the minimum wall thickness tmin as allowed by the provision of CodeCase N-597-1. WBN is currently in the first 10-year inservice inspection interval. The 1989 Edition of theASME Code, Section XI with no Addenda governs the current repair and replacement activities at this plant. Use of Code Case N-597-1 was previously requested by TVA for this same componentfollowing the Cycle 5 RFO, and was approved in Nuclear Regulatory Commission's (NRC's)"Safety Evaluation of Request for Relief 1-RR-05 (TAC No. MC1580)," dated August 27, 2004 (ML042430029).
EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION TENNESSEE VALLEY AUTHORITY RELIEF REQUEST TO USE CODE CASE N-597-1 TO ANALYTICALLY EVALUATE PIPE WALL THINNING OF ASME CLASS 2 CARBON STEEL MAIN FEEDWATER PIPING WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-390


==2.0REGULATORY EVALUATION==
==1.0      INTRODUCTION==
As specified in 10 CFR 50.55a(g), inservice inspection (ISI) of nuclear power plant componentsshall be performed in accordance with the requirements of the ASME Boiler and Pressure Vessel Code (Code), Section XI, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i).Pursuant to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may beused, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptablelevel of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.Title 10 CFR 50.55a(g)(5)(iii) states that if the licensee has determined that conformance withcertain code requirements is impractical for its facility, the licensee shall notify the Commissionand submit, as specified in §50.4, information to support the determinations.2.1Licensee's EvaluationSummary:During implementation of WBN's Unit 1 Cycle 6 RFO FAC Program, UT detected wall thinningin an ASME Code Class 2 main feedwater piping elbow at the steam generator Loop 2, inlet nozzle. The FAC Program identifier for this component is grid 103BE252. Currently, the thickness is greater than the required minimum wall thickness tmin. Based on UT thicknessmeasurements, predicted wear rate, and analytical analysis, it was determined that the predicted wall thickness t p will fall below the required minimum wall thickness tmin, 13 monthsafter startup from the RFO. However, analysis demonstrates the elbow meets the alternativeevaluation criteria of ASME Code Case N-597-1, Section -3600. This condition was reported in WBN's Corrective Action Program, as Problem Evaluation Report (PER) 77658. The other three steam generator elbows to the inlet nozzles were ultrasonically examined and were found acceptable. Use of the code case was requested for this same component following the Cycle 5 RFO and was approved by letter to TVA dated August 27, 2004, "Safety Evaluation of Request for Relief 1-RR-05 on the Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning at Watts Bar Nuclear Power Plant, Unit 1"(ML042430029). The safety evaluation requires additional relief for continued operation until the end of Cycle 7 and the relief request is to meet the followingcondition: The licensee must demonstrate that the structural integrity and safety of thedegraded elbow will be ensured by performing a stress analysis, using the set of ultrasonictesting data recorded during the Cycle 6 RFO and projected to the end of Cycle 7. The stress  analysis should be based on the licensing basis methodology that was approved by the staff inthe resolution of Watts Bar Outstanding Issue 20(a), "Feedwater Check Valve Slam," and documented in Supplement No. 13 of NUREG-0847, "Watts Bar Safety Evaluation Report," inaccordance with the provisions of Code Case N-597-1 for piping stress analysis. The Cycle 6 RFO FAC Program UT of the elbow found the current minimum measured wallthickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the samelocation as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using anestimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),
the predicted wall thickness t p at the Cycle 7 RFO is calculated to be 0.605 inches. The allowable minimum wall thickness tmin as calculated by the equation specified in CodeCase N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. This equation is essentially the same equation for calculating the minimum wall thickness based upon the allowable hoop stresses.
As noted, the predicted wall thickness t p of 0.605 inches will fall below the minimum wallthickness tmin of 0.613 inches but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of the Code Case. Thus, TVA is requesting review and approvalfor application of the Code Case N-597-1 as allowed by the conditions of Regulatory Guide (RG) 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1,Revision 13."  Application of the Code Case provides an acceptable level of quality and safety for this application. Component:FAC Grid 103BE252, 16-inch nominal pipe size feedwater pipe 45 degree elbow at the inlet toLoop 2 Steam Generator, ASME Code Class 2. Code Requirement
:ASME Section XI, 1989 Edition, IWA-4300 provides a process for assessing a component forcontinued service after a defect has been removed. This provision stipulates that where the section thickness has been reduced below the minimum design wall thickness, the component shall be repaired. As an alternative, the component may be evaluated and accepted inaccordance with the design rules of either the Construction Code or Section III. Basis for Relief
:RG 1.147, Revision 13, conditionally accepted the use of Code Case N-597-1 subject to fiveconditions. Some of these conditions require NRC review and approval prior to continued useof the Code Case. Proposed Alternative
:As an alternative to the requirements of IWA-4300, TVA proposes to use the provisions of ASME Code Case N-597-1 for analytical evaluation of FAC grid 103BE252, subject to the conditions incorporated into the acceptance of the Code Case in RG 1.147, Revision 13.Justification for Granting of Relief
:  Actual wall thickness measurements were taken by ultrasonic examination on February 27and 28, 2005, during the Cycle 6 RFO. A copy of the examination data report is included in  to the licensee's submittal (ML050970082). This is the second set of thickness measurements taken for this component. The data grid points for these measurements are established by procedure and are taken from the grid pattern on the component surface as depicted in the sketches labeled View 1, View 2, and View 3 of Enclosure 2.


The Cycle 6 RFO FAC Program UT of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the samelocation as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using anestimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),
By letter dated March 25, 2005 (ADAMS Accession No. ML050970082), Tennessee Valley Authority (TVA, the licensee), pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
the predicted wall thickness t p at the Cycle 7 RFO is calculated to be 0.605 inches. The allowable minimum wall thickness tmin as calculated by the equation specified in CodeCase N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. This equation is essentially the same equation for calculating the minimum wall thickness based upon the allowable hoop stresses.
Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineering (ASME) Code Section XI requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at Watts Bar Nuclear Plant (WBN),
As noted, the predicted wall thickness t p of 0.605 inches will fall below the minimum wallthickness tmin of 0.613 inches but will be greater than 90 percent of the minimum wallthickness tmin as allowed by the provision of the Code Case. Thus, TVA is requesting reviewand approval for application of the Code Case N-597-1 as allowed by the conditions of RG 1.147, ?Inservice inspection Code Case Acceptability, ASME Section XI, Division 1,Revision 13."  Application of the Code Case provides an acceptable level of quality and safety for this application. 2.2Staff Evaluation The staff reviewed the information provided by TVA in support of its request for relief fromASME Section XI requirements to permanently repair or replace an ASME Class 2 alloy steel piping elbow at WBN. The staff evaluation of the request follows. In Enclosure 2 to its Request for Relief, TVA addressed wall thinning by FAC in an ASMESection III Class 2 degraded elbow located in Loop 2 of the WBN, Unit 1 Main FeedwaterSystem. The elbow is fabricated from 16-inch, Schedule 80, SA-333 Grade 6 material. For this elbow the nominal thickness t nom = 0.844 inches. The evaluation of the piping was based on theapplication of ASME Section XI Code Case N-597-1. This Code Case was conditionally accepted by the staff as documented in RG 1.147, with conditions listed in Table 2 of the Guide.
Unit 1. As an alternative, the licensee proposed to use the provisions of ASME Code Case N-597-1, Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1, to analytically evaluate the effect of potential pipe wall thinning in an elbow on the structural integrity of the system under the Faulted Condition loading, which included Check Valve Slam (CVS) waterhammer and Safe Shutdown Earthquake (SSE) seismic loading. The potential pipe wall thinning was projected to take place by the WBN CHECWORKS program.
During implementation of WBN's Unit 1 Cycle 6 Refueling Outage (RFO) Flow Accelerated Corrosion (FAC) Program, ultrasonic examination (UT) detected wall thinning in an ASME Code Class 2 main feedwater piping elbow at the steam generator Loop 2 inlet nozzle. Currently, the thickness is greater than the ASME Code required minimum wall thickness tmin. Based on UT thickness measurements and the predicted wear rate, it was determined that the predicted wall thickness tp will fall below the required minimum wall thickness tmin 13 months after startup from the RFO. The other three steam generator elbows to the inlet nozzles were ultrasonically examined and were found acceptable.
Specifically, the UT examination of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),
the predicted wall thickness tp at the Cycle 7 RFO is calculated to be 0.605 inches. The allowable minimum wall thickness tmin as calculated by the equation specified in Code Case N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. As noted, the predicted wall thickness tp of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches, but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of Code Case N-597-1.


Condition (2) for this Code Case, as listed in RG 1.147, states that:  "Components affected byFAC to which this Code Case are applied must be repaired or replaced in accordance with the construction code of record and Owner's requirements or a later NRC-approved edition ofSection III of the ASME Code, prior to the value of t p (minimum projected wall thickness)reaching the Code required minimum wall thickness, tmin, as specified inParagraph -3622.1(a)(1) of this Code Case. Alternatively, the use of this Code Case is subject to NRC review and approval.
WBN is currently in the first 10-year inservice inspection interval. The 1989 Edition of the ASME Code, Section XI with no Addenda governs the current repair and replacement activities at this plant.
" Based on measured wall-thickness data taken during the Cycle 5 RFO in September 2003, theminimum measured wall thickness was determined to be 0.639 inches. On the basis of wear rates computed using WBN FAC Program methods (including a 10 percent safety factor), the  minimum predicted wall thickness t p at the end of current operating Cycle 6 (1.5 years later, orFebruary 2005) was determined as t p = 0.598 inches. Based on measured wall-thickness data taken during the Cycle 6 RFO in February 2005, theminimum measured wall thickness was determined to be 0.635 inches (not as predicted
Use of Code Case N-597-1 was previously requested by TVA for this same component following the Cycle 5 RFO, and was approved in Nuclear Regulatory Commissions (NRC's)
Safety Evaluation of Request for Relief 1-RR-05 (TAC No. MC1580), dated August 27, 2004 (ML042430029).


t p = 0.598 inches). On the basis of wear rates computed using WBN FAC Program methods(including a 10 percent safety factor), the current minimum predicted wall thickness t p at thetime of the Cycle 7 RFO (1.5 years after Cycle 6 RFO) is t p = 0.605 inches. The Code required minimum wall thickness tmin was determined to be 0.613 inches. Since thisvalue falls between the minimum measured wall thickness during Cycle 6 RFO and the predicted Cycle 6 RFO minimum wall thickness, the licensee determined, based on the computed wear rate, that the wall thickness will reach the Code-required minimum wallthickness tmin 13 months into the current operating cycle, (i.e., sometime in April 2006). Thiswould potentially constitute a deviation from the licensing basis of the plant and thus require plant shutdown to repair or replace the degraded elbow. Therefore, TVA requested relief from the ASME Code requirements so that plant operation can continue until the end of currentoperating Cycle 7.Subsection -3221 of Code Case N-597-1, "Acceptance by Examination," states that pipingitems whose examination and evaluation results reveal that t p meets the acceptance standardsof Section -3500 or the Construction Code are acceptable for continued service. Paragraph -3500(a)(1) of Section -3500, "Wall Thickness Acceptance Standards," states thatfor straight pipe and elbows purchased to a nominal pipe specification with an allowable wall thickness under-tolerance of 12 percent, t p shall not be less than 0.875t nom. For this elbow, 0.875t nom = 0.739 inches, which is greater than both the current measured minimum wallthickness and the predicted minimum wall thickness t
==2.0     REGULATORY EVALUATION==
: p. The acceptance criterion byexamination was, therefore, not met. When this criterion cannot be met, Subsection -3221 states that alternative acceptance standards stated in Subsections -3222, -3223, and -3224may be used.Subsection -3223 of Code Case N-597-1, "Acceptance by Engineering Evaluation," states thatfor Class 2 and 3 piping, an acceptable evaluation method and criteria are provided in Section -3600, "Analytical Evaluation for Class 2 and Class 3 Piping Items."  Subsection -3610, "General Requirements," states that: (a) analytical evaluations shall be conducted inaccordance with the Construction Code. Later Code Editions and Addenda may be used. Use of later Code Editions and Addenda shall be reviewed for acceptability to the regulatory andenforcement authorities having jurisdiction at the plant site, (b) analytical evaluations shall beconducted using the predicted wall thickness t p at the next examination of the piping item, (c) apiping item is acceptable for continued service if the minimum pipe wall thickness, branch reinforcement requirements, and piping stress criteria of the Construction Code used in the evaluation are met for all specified loading conditions, and (d) as an alternative to item (c), butt welded pipe, elbow, branch connection, and reducer piping items may be evaluated in accordance with Section -3620, "Evaluation of Pipe, Elbows, Branch Connections and Reducers." The general requirements stated in Subsection -3621 of Section -3620 state the following:  (a) the evaluation shall meet the requirements of Subsection -3622 and Paragraph -3622.1,(b) for a branch connection or tee, the region within the limits of reinforcement defined in theConstruction Code shall meet the requirements of Subsection -3624, and (c) evaluations shallbe conducted using the appropriate piping equations, loadings, load combinations, allowable material properties, and other acceptance standards from the Construction Code used in the evaluation, except as specifically modified by this Case. Paragraph -3622.1(a), "Evaluation forMinimum Wall Thickness," of Subsection -3622, "Thickness Evaluation," also states that, "except as provided in Paragraph -3622.1(b), the value of t p shall not be less than 90 percent ofthe minimum wall thickness of the piping item, tmin, required for design pressure, defined in theConstruction Code used in the evaluation, exclusive of any additional corrosion allowance."
Based on the Code required minimum wall thickness tmin for this elbow of 0.613 inches, thelicensee determined that 90 percent of tmin is 0.552 inches. The staff finds that TVA has shownthat the predicted minimum wall thickness is less than tmin but greater than 0.9tmin, and thereforemeets the criterion in this section. The feedwater system was initially designed and qualified to ASME Code Class 2 piping. As aresult of the discovery for potential CVS waterhammer loading, following a postulated pipe rupture at the main header in the Turbine Building, the NRC staff identified OutstandingIssue 20(a), "Feedwater Check Valve Slam," in NUREG-0847, Watts Bar Safety EvaluationReport, Supplement No. 6, dated April 1991. The issue was the qualification of the feedwaterpiping system inside containment, from the check valves to the steam generator nozzles, toLevel D service limits when subjected to the faulted condition load combination of CVS waterhammer and SSE loading. To qualify the Class 2 system for licensing under combined CVS and SSE loading, the licenseeperformed a dynamic, elastic-plastic analysis, using the computer program ANSYS. The as-built nominal wall thickness (t nom = 0.844 inches) and as-built support configuration valueswere used as input. In conjunction with this analysis, the licensee also invoked the Level D Service (faulted condition) stress limits for pressure boundary integrity stated in ASME Section III Appendix F (1980 Edition through Winter 1982 Addenda, or a later Edition) for plasticanalysis. Although the limits of Appendix F specified in the 1980 Edition were valid only for qualification of ASME Class 1 piping, the staff approved the application of these limits forqualification of this Class 2 system. These limits are significantly higher than the faultedconditions limits specified for Class 2 piping. During the initial licensing review for WBN, the NRC staff reviewed the ANSYS analysis and found it acceptable. The staff also approved theapplication of Class 1 limits for the qualification of Class 2 piping. These findings and the resolution of Licensing Issue 20(a) were documented in NUREG-0847, ?Watts Bar SafetyEvaluation Report," Supplement No. 13, dated April 1994. The NRC's safety evaluation in its letter to TVA dated August 27, 2004, "Safety Evaluation ofRequest for Relief 1-RR-05 on the Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning at Watts Bar Nuclear Power Plant, Unit 1" (ML042430029), indicated that the following condition would have to be met, if TVA intended to request subsequent relief and approval at RFO Cycle 6 for application of the provisions of Code Case N-597-1 to this component to the end of Cycle 7: The licensee must demonstrate that the structural integrity and safety of the degradedelbow will be ensured by performing a stress analysis, using the set of ultrasonic testing datarecorded during the Cycle 6 RFO and projected to the end of Cycle 7. The stress analysis should be based on the licensing basis methodology that was approved by the staff in the resolution of Watts Bar Outstanding Issue 20(a), "Feedwater Check Valve Slam," and  documented in Supplement No. 13 of NUREG-0847, "Watts Bar Safety Evaluation Report," inaccordance with the provisions of Code Case -597-1 for piping stress analysis. As stated above, the RFO Cycle 6 FAC Program ultrasonic examination of the elbow found thecurrent minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstreamend of the elbow. This is the same location as the RFO Cycle 5 minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year(which includes a 10-percent safety factor), the predicted wall thickness t p at the RFO Cycle 7RFO is calculated to be 0.605 inches. Based on the measured Cycle 6 RFO wall thickness, the licensee performed, in support of itsrelief request, a stress analysis of the degraded elbow with the wall thinning predicted to occur by the end of the operating Cycle 7, in accordance with the provisions of Section -3623 of the Code Case. The licensee submitted this analysis for staff evaluation, in accordance with Condition (2) stated in Table 2 of RG 1.147 for Code Case N-597-1, and the condition requirement stated in the NRC letter.In accordance with this requirement, the licensee provided the measured Cycle 6 RFO UT elbow thicknesses and the results of two stress analyses for staff review and evaluation. The analyses used elbow geometrical properties (such as cross-sectional area and moment of inertia) based on the average wall thickness, calculated from the projected minimum wall thicknesses at RFO Cycle 7 of the highest degraded cross-section in the elbow. One analysis consisted of an ASME Section III Class 2 elastic analysis of the degraded elbow for all loadcombinations that did not include CVS waterhammer loading. This analysis was shown to meet the ASME Section III Class 2 allowable stresses for piping. The highest stress ratio (maximumstress / allowable stress) was determined as 0.996 < 1.0. This analysis also meets the evaluation requirements stated in Subsection -3623.1, "Evaluation Requirements," whichrequire that the stress evaluation be performed using the equations required by theConstruction Code. The second stress analysis consisted of an elastic elbow analysis based on the ASMESection III Class 1 methodology. This analysis used the internal moments calculated from theANSYS elastic-plastic piping system analysis, subject to the CVS and SSE load combination,that had previously been evaluated and approved by the staff in Supplement 13 ofNUREG-0847. The highest stresses were compared against the ASME Section III Appendix Fstress limits that had also previously been approved in this supplement. This approach was used as an alternative to performing an ANSYS full elastic-plastic analysis with the highest degraded wall thickness in the entire elbow. Based on this analysis, the licensee demonstrated that the primary membrane and primary membrane-plus-bending stress intensities will meet theSupplement No.13 stress limits in the Cycle 7 RFO degraded condition. The highest stress ratio (maximum stress / allowable stress) was determined as 0.967 < 1.0. The staff evaluated the licensee's approach and concluded that, for this one-time request for relief, the analysis satisfies the intent of the methodology and the ASME Section III Appendix F stress limitsaccepted by the staff in Supplement No. 13 of NUREG-0847.Based on the above evaluation, the staff finds that the licensee has provided reasonableassurance that it is unlikely that the structural integrity of the degraded elbow will becompromised prior to the Cycle 7 RFO.     


==3.0CONCLUSION==
As specified in 10 CFR 50.55a(g), inservice inspection (ISI) of nuclear power plant components shall be performed in accordance with the requirements of the ASME Boiler and Pressure Vessel Code (Code), Section XI, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i).
Based on the above evaluation, the staff concludes that the application by the licensee of therelevant provisions of Code Case N-597-1 has provided reasonable assurance that the structural integrity and safety of the degraded elbow will be ensured for continued operationuntil the Cycle 7 RFO. This assurance was provided by the results of stress analyses of the degraded elbow using the set of UT data recorded during the Cycle 6 RFO and projected to the Cycle 7 RFO, in accordance with the provisions of Code Case N-597-1 for piping stress analysis, and the condition stated in the NRC Safety Evaluation dated August 27, 2004. Thestress analysis that complied with this condition was based on an acceptable alternative to the licensing basis methodology, but applied the ASME Section III Appendix F stress limits thatwere approved by the staff in the resolution of Outstanding Issue 20(a), "Feedwater Check Valve Slam," and documented in Supplement No. 13 of NUREG-0847, "Watts Bar SafetyEvaluation Report.However, the wall thickness is projected to degrade to the Code minimum wall thickness approximately 13 months into Cycle 7. The licensee will therefore be required torepair or replace the degraded elbow, in accordance with the requirements of ASME Section XI, at the Cycle 7 RFO. These requirements will be met by the licensee's commitment to replacethe degraded elbow during the steam generator replacement during the Cycle 7 RFO, In summary, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides anacceptable level of quality and safety and is, therefore, authorized for the duration of the currentoperating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.Principle Contributors: George Georgiev, DCI/CPNB Mark Hartzman, DE/EEMBDate: January 27, 2006}}
Pursuant to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Title 10 CFR 50.55a(g)(5)(iii) states that if the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in &sect;50.4, information to support the determinations.
2.1      Licensees Evaluation Summary:
During implementation of WBN's Unit 1 Cycle 6 RFO FAC Program, UT detected wall thinning in an ASME Code Class 2 main feedwater piping elbow at the steam generator Loop 2, inlet nozzle. The FAC Program identifier for this component is grid 103BE252. Currently, the thickness is greater than the required minimum wall thickness tmin. Based on UT thickness measurements, predicted wear rate, and analytical analysis, it was determined that the predicted wall thickness tp will fall below the required minimum wall thickness tmin, 13 months after startup from the RFO. However, analysis demonstrates the elbow meets the alternative evaluation criteria of ASME Code Case N-597-1, Section -3600. This condition was reported in WBN's Corrective Action Program, as Problem Evaluation Report (PER) 77658. The other three steam generator elbows to the inlet nozzles were ultrasonically examined and were found acceptable.
Use of the code case was requested for this same component following the Cycle 5 RFO and was approved by letter to TVA dated August 27, 2004, Safety Evaluation of Request for Relief 1-RR-05 on the Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning at Watts Bar Nuclear Power Plant, Unit 1(ML042430029). The safety evaluation requires additional relief for continued operation until the end of Cycle 7 and the relief request is to meet the following condition: The licensee must demonstrate that the structural integrity and safety of the degraded elbow will be ensured by performing a stress analysis, using the set of ultrasonic testing data recorded during the Cycle 6 RFO and projected to the end of Cycle 7. The stress
 
analysis should be based on the licensing basis methodology that was approved by the staff in the resolution of Watts Bar Outstanding Issue 20(a), Feedwater Check Valve Slam, and documented in Supplement No. 13 of NUREG-0847, Watts Bar Safety Evaluation Report, in accordance with the provisions of Code Case N-597-1 for piping stress analysis.
The Cycle 6 RFO FAC Program UT of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),
the predicted wall thickness tp at the Cycle 7 RFO is calculated to be 0.605 inches.
The allowable minimum wall thickness tmin as calculated by the equation specified in Code Case N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. This equation is essentially the same equation for calculating the minimum wall thickness based upon the allowable hoop stresses.
As noted, the predicted wall thickness tp of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of the Code Case. Thus, TVA is requesting review and approval for application of the Code Case N-597-1 as allowed by the conditions of Regulatory Guide (RG) 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 13. Application of the Code Case provides an acceptable level of quality and safety for this application.
Component:
FAC Grid 103BE252, 16-inch nominal pipe size feedwater pipe 45 degree elbow at the inlet to Loop 2 Steam Generator, ASME Code Class 2.
Code Requirement:
ASME Section XI, 1989 Edition, IWA-4300 provides a process for assessing a component for continued service after a defect has been removed. This provision stipulates that where the section thickness has been reduced below the minimum design wall thickness, the component shall be repaired. As an alternative, the component may be evaluated and accepted in accordance with the design rules of either the Construction Code or Section III.
Basis for Relief:
RG 1.147, Revision 13, conditionally accepted the use of Code Case N-597-1 subject to five conditions. Some of these conditions require NRC review and approval prior to continued use of the Code Case.
Proposed Alternative:
As an alternative to the requirements of IWA-4300, TVA proposes to use the provisions of ASME Code Case N-597-1 for analytical evaluation of FAC grid 103BE252, subject to the conditions incorporated into the acceptance of the Code Case in RG 1.147, Revision 13.
Justification for Granting of Relief:
 
Actual wall thickness measurements were taken by ultrasonic examination on February 27 and 28, 2005, during the Cycle 6 RFO. A copy of the examination data report is included in  to the licensees submittal (ML050970082). This is the second set of thickness measurements taken for this component. The data grid points for these measurements are established by procedure and are taken from the grid pattern on the component surface as depicted in the sketches labeled View 1, View 2, and View 3 of Enclosure 2.
The Cycle 6 RFO FAC Program UT of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),
the predicted wall thickness tp at the Cycle 7 RFO is calculated to be 0.605 inches.
The allowable minimum wall thickness tmin as calculated by the equation specified in Code Case N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. This equation is essentially the same equation for calculating the minimum wall thickness based upon the allowable hoop stresses.
As noted, the predicted wall thickness tp of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of the Code Case. Thus, TVA is requesting review and approval for application of the Code Case N-597-1 as allowed by the conditions of RG 1.147, ?Inservice inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 13. Application of the Code Case provides an acceptable level of quality and safety for this application.
2.2      Staff Evaluation The staff reviewed the information provided by TVA in support of its request for relief from ASME Section XI requirements to permanently repair or replace an ASME Class 2 alloy steel piping elbow at WBN. The staff evaluation of the request follows.
In Enclosure 2 to its Request for Relief, TVA addressed wall thinning by FAC in an ASME Section III Class 2 degraded elbow located in Loop 2 of the WBN, Unit 1 Main Feedwater System. The elbow is fabricated from 16-inch, Schedule 80, SA-333 Grade 6 material. For this elbow the nominal thickness tnom = 0.844 inches. The evaluation of the piping was based on the application of ASME Section XI Code Case N-597-1. This Code Case was conditionally accepted by the staff as documented in RG 1.147, with conditions listed in Table 2 of the Guide.
Condition (2) for this Code Case, as listed in RG 1.147, states that: Components affected by FAC to which this Code Case are applied must be repaired or replaced in accordance with the construction code of record and Owners requirements or a later NRC-approved edition of Section III of the ASME Code, prior to the value of tp (minimum projected wall thickness) reaching the Code required minimum wall thickness, tmin, as specified in Paragraph -3622.1(a)(1) of this Code Case. Alternatively, the use of this Code Case is subject to NRC review and approval.
Based on measured wall-thickness data taken during the Cycle 5 RFO in September 2003, the minimum measured wall thickness was determined to be 0.639 inches. On the basis of wear rates computed using WBN FAC Program methods (including a 10 percent safety factor), the
 
minimum predicted wall thickness tp at the end of current operating Cycle 6 (1.5 years later, or February 2005) was determined as tp = 0.598 inches.
Based on measured wall-thickness data taken during the Cycle 6 RFO in February 2005, the minimum measured wall thickness was determined to be 0.635 inches (not as predicted tp = 0.598 inches). On the basis of wear rates computed using WBN FAC Program methods (including a 10 percent safety factor), the current minimum predicted wall thickness tp at the time of the Cycle 7 RFO (1.5 years after Cycle 6 RFO) is tp = 0.605 inches.
The Code required minimum wall thickness tmin was determined to be 0.613 inches. Since this value falls between the minimum measured wall thickness during Cycle 6 RFO and the predicted Cycle 6 RFO minimum wall thickness, the licensee determined, based on the computed wear rate, that the wall thickness will reach the Code-required minimum wall thickness tmin 13 months into the current operating cycle, (i.e., sometime in April 2006). This would potentially constitute a deviation from the licensing basis of the plant and thus require plant shutdown to repair or replace the degraded elbow. Therefore, TVA requested relief from the ASME Code requirements so that plant operation can continue until the end of current operating Cycle 7.
Subsection -3221 of Code Case N-597-1, Acceptance by Examination, states that piping items whose examination and evaluation results reveal that tp meets the acceptance standards of Section -3500 or the Construction Code are acceptable for continued service.
Paragraph -3500(a)(1) of Section -3500, Wall Thickness Acceptance Standards, states that for straight pipe and elbows purchased to a nominal pipe specification with an allowable wall thickness under-tolerance of 12 percent, tp shall not be less than 0.875tnom. For this elbow, 0.875tnom = 0.739 inches, which is greater than both the current measured minimum wall thickness and the predicted minimum wall thickness tp. The acceptance criterion by examination was, therefore, not met. When this criterion cannot be met, Subsection -3221 states that alternative acceptance standards stated in Subsections -3222, -3223, and -3224 may be used.
Subsection -3223 of Code Case N-597-1, Acceptance by Engineering Evaluation, states that for Class 2 and 3 piping, an acceptable evaluation method and criteria are provided in Section -3600, Analytical Evaluation for Class 2 and Class 3 Piping Items. Subsection -3610, General Requirements, states that: (a) analytical evaluations shall be conducted in accordance with the Construction Code. Later Code Editions and Addenda may be used. Use of later Code Editions and Addenda shall be reviewed for acceptability to the regulatory and enforcement authorities having jurisdiction at the plant site, (b) analytical evaluations shall be conducted using the predicted wall thickness tp at the next examination of the piping item, (c) a piping item is acceptable for continued service if the minimum pipe wall thickness, branch reinforcement requirements, and piping stress criteria of the Construction Code used in the evaluation are met for all specified loading conditions, and (d) as an alternative to item (c), butt welded pipe, elbow, branch connection, and reducer piping items may be evaluated in accordance with Section -3620, Evaluation of Pipe, Elbows, Branch Connections and Reducers.
The general requirements stated in Subsection -3621 of Section -3620 state the following:
 
(a) the evaluation shall meet the requirements of Subsection -3622 and Paragraph -3622.1, (b) for a branch connection or tee, the region within the limits of reinforcement defined in the Construction Code shall meet the requirements of Subsection -3624, and (c) evaluations shall be conducted using the appropriate piping equations, loadings, load combinations, allowable material properties, and other acceptance standards from the Construction Code used in the evaluation, except as specifically modified by this Case. Paragraph -3622.1(a), Evaluation for Minimum Wall Thickness, of Subsection -3622, Thickness Evaluation, also states that, except as provided in Paragraph -3622.1(b), the value of tp shall not be less than 90 percent of the minimum wall thickness of the piping item, tmin, required for design pressure, defined in the Construction Code used in the evaluation, exclusive of any additional corrosion allowance.
Based on the Code required minimum wall thickness tmin for this elbow of 0.613 inches, the licensee determined that 90 percent of tmin is 0.552 inches. The staff finds that TVA has shown that the predicted minimum wall thickness is less than tmin but greater than 0.9tmin, and therefore meets the criterion in this section.
The feedwater system was initially designed and qualified to ASME Code Class 2 piping. As a result of the discovery for potential CVS waterhammer loading, following a postulated pipe rupture at the main header in the Turbine Building, the NRC staff identified Outstanding Issue 20(a), Feedwater Check Valve Slam, in NUREG-0847, Watts Bar Safety Evaluation Report, Supplement No. 6, dated April 1991. The issue was the qualification of the feedwater piping system inside containment, from the check valves to the steam generator nozzles, to Level D service limits when subjected to the faulted condition load combination of CVS waterhammer and SSE loading.
To qualify the Class 2 system for licensing under combined CVS and SSE loading, the licensee performed a dynamic, elastic-plastic analysis, using the computer program ANSYS. The as-built nominal wall thickness (tnom = 0.844 inches) and as-built support configuration values were used as input. In conjunction with this analysis, the licensee also invoked the Level D Service (faulted condition) stress limits for pressure boundary integrity stated in ASME Section III Appendix F (1980 Edition through Winter 1982 Addenda, or a later Edition) for plastic analysis. Although the limits of Appendix F specified in the 1980 Edition were valid only for qualification of ASME Class 1 piping, the staff approved the application of these limits for qualification of this Class 2 system. These limits are significantly higher than the faulted conditions limits specified for Class 2 piping. During the initial licensing review for WBN, the NRC staff reviewed the ANSYS analysis and found it acceptable. The staff also approved the application of Class 1 limits for the qualification of Class 2 piping. These findings and the resolution of Licensing Issue 20(a) were documented in NUREG-0847, ?Watts Bar Safety Evaluation Report, Supplement No. 13, dated April 1994.
The NRCs safety evaluation in its letter to TVA dated August 27, 2004, Safety Evaluation of Request for Relief 1-RR-05 on the Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning at Watts Bar Nuclear Power Plant, Unit 1 (ML042430029), indicated that the following condition would have to be met, if TVA intended to request subsequent relief and approval at RFO Cycle 6 for application of the provisions of Code Case N-597-1 to this component to the end of Cycle 7: The licensee must demonstrate that the structural integrity and safety of the degraded elbow will be ensured by performing a stress analysis, using the set of ultrasonic testing data recorded during the Cycle 6 RFO and projected to the end of Cycle 7. The stress analysis should be based on the licensing basis methodology that was approved by the staff in the resolution of Watts Bar Outstanding Issue 20(a), Feedwater Check Valve Slam, and
 
documented in Supplement No. 13 of NUREG-0847, "Watts Bar Safety Evaluation Report," in accordance with the provisions of Code Case -597-1 for piping stress analysis.
As stated above, the RFO Cycle 6 FAC Program ultrasonic examination of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the RFO Cycle 5 minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor), the predicted wall thickness tp at the RFO Cycle 7 RFO is calculated to be 0.605 inches.
Based on the measured Cycle 6 RFO wall thickness, the licensee performed, in support of its relief request, a stress analysis of the degraded elbow with the wall thinning predicted to occur by the end of the operating Cycle 7, in accordance with the provisions of Section -3623 of the Code Case. The licensee submitted this analysis for staff evaluation, in accordance with Condition (2) stated in Table 2 of RG 1.147 for Code Case N-597-1, and the condition requirement stated in the NRC letter.
In accordance with this requirement, the licensee provided the measured Cycle 6 RFO UT elbow thicknesses and the results of two stress analyses for staff review and evaluation. The analyses used elbow geometrical properties (such as cross-sectional area and moment of inertia) based on the average wall thickness, calculated from the projected minimum wall thicknesses at RFO Cycle 7 of the highest degraded cross-section in the elbow. One analysis consisted of an ASME Section III Class 2 elastic analysis of the degraded elbow for all load combinations that did not include CVS waterhammer loading. This analysis was shown to meet the ASME Section III Class 2 allowable stresses for piping. The highest stress ratio (maximum stress / allowable stress) was determined as 0.996 < 1.0. This analysis also meets the evaluation requirements stated in Subsection -3623.1, Evaluation Requirements, which require that the stress evaluation be performed using the equations required by the Construction Code.
The second stress analysis consisted of an elastic elbow analysis based on the ASME Section III Class 1 methodology. This analysis used the internal moments calculated from the ANSYS elastic-plastic piping system analysis, subject to the CVS and SSE load combination, that had previously been evaluated and approved by the staff in Supplement 13 of NUREG-0847. The highest stresses were compared against the ASME Section III Appendix F stress limits that had also previously been approved in this supplement. This approach was used as an alternative to performing an ANSYS full elastic-plastic analysis with the highest degraded wall thickness in the entire elbow. Based on this analysis, the licensee demonstrated that the primary membrane and primary membrane-plus-bending stress intensities will meet the Supplement No.13 stress limits in the Cycle 7 RFO degraded condition. The highest stress ratio (maximum stress / allowable stress) was determined as 0.967 < 1.0. The staff evaluated the licensees approach and concluded that, for this one-time request for relief, the analysis satisfies the intent of the methodology and the ASME Section III Appendix F stress limits accepted by the staff in Supplement No. 13 of NUREG-0847.
Based on the above evaluation, the staff finds that the licensee has provided reasonable assurance that it is unlikely that the structural integrity of the degraded elbow will be compromised prior to the Cycle 7 RFO.
 
==3.0      CONCLUSION==
 
Based on the above evaluation, the staff concludes that the application by the licensee of the relevant provisions of Code Case N-597-1 has provided reasonable assurance that the structural integrity and safety of the degraded elbow will be ensured for continued operation until the Cycle 7 RFO. This assurance was provided by the results of stress analyses of the degraded elbow using the set of UT data recorded during the Cycle 6 RFO and projected to the Cycle 7 RFO, in accordance with the provisions of Code Case N-597-1 for piping stress analysis, and the condition stated in the NRC Safety Evaluation dated August 27, 2004. The stress analysis that complied with this condition was based on an acceptable alternative to the licensing basis methodology, but applied the ASME Section III Appendix F stress limits that were approved by the staff in the resolution of Outstanding Issue 20(a), Feedwater Check Valve Slam, and documented in Supplement No. 13 of NUREG-0847, Watts Bar Safety Evaluation Report. However, the wall thickness is projected to degrade to the Code minimum wall thickness approximately 13 months into Cycle 7. The licensee will therefore be required to repair or replace the degraded elbow, in accordance with the requirements of ASME Section XI, at the Cycle 7 RFO. These requirements will be met by the licensees commitment to replace the degraded elbow during the steam generator replacement during the Cycle 7 RFO, In summary, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the current operating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principle Contributors: George Georgiev, DCI/CPNB Mark Hartzman, DE/EEMB Date: January 27, 2006}}

Revision as of 00:18, 24 November 2019

Letter, Relief Request to Use ASME Code Case -597-1 to Evaluate Pipe Wall Thinning
ML060110438
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/27/2006
From: Marshall M
NRC/NRR/ADRO/DORL/LPLD
To: Singer K
Tennessee Valley Authority
Pickett D, NRR/DLPM, 415-1364
References
TAC MC6512
Download: ML060110438 (11)


Text

January 27, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT, UNIT 1 - RELIEF REQUEST 1-RR-07 ON THE USE OF ASME CODE CASE N-597-1 TO EVALUATE PIPE WALL THINNING (TAC NO. MC6512)

Dear Mr. Singer:

In a letter dated March 25, 2005 (ADAMS Accession No. ML050970082), Tennessee Valley Authority (the licensee), pursuant to Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineers (ASME) Code,Section XI, requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at its Watts Bar Nuclear Power Plant (WBN), Unit 1. Instead, the licensee proposed to use the provisions of ASME Code Case N-597-1, Requirements for Analytical Evaluation of Pipe Wall Thinning,Section XI, Division 1, to analytically evaluate the potential pipe wall thinning.

As discussed in the enclosed evaluation, the Nuclear Regulatory Commission staff has concluded that, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the current operating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.

Sincerely,

/RA by BMozafari for/

Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390

Enclosure:

As stated cc: See next page

ML050970082), Tennessee Valley Authority (the licensee), pursuant to Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineers (ASME) Code,Section XI, requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at its Watts Bar Nuclear Power Plant (WBN), Unit 1. Instead, the licensee proposed to use the provisions of ASME Code Case N-597-1, Requirements for Analytical Evaluation of Pipe Wall Thinning,Section XI, Division 1, to analytically evaluate the potential pipe wall thinning.

As discussed in the enclosed evaluation, the Nuclear Regulatory Commission staff has concluded that, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the current operating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.

Sincerely,

/RA by BMozafari for/

Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390

Enclosure:

As stated cc: See next page DISTRIBUTION:

PUBLIC LPLII-2 r/f RidsAcrsAcnwMailcenter RidsNrrDorlLpld GGeorgiev MVaaler RidsNrrPMDPickett RidsOgcRp KManoly MHartzman RSola(paper copy) RidsNrrDorlLpld TChan RidsRgn2MailCenter (SCahill)

ADAMS Accession No.: ML060110438 *No Legal Objection NRR-106 OFFICE LPL2-2/PE LPL2-2/LA LPL2-2/PM DCI/CPNB DE/EEMB OGC LPL2-2/BC BMozafari for NAME MVaaler RSola DPickett TChan KManoly SHamrick*

MMarshall by memo by memo dated DATE 1/18/06 1/18/06 1/19/06 dated 1/23/06 1/27/ 06 12 / 23 / 05 12 / 23 / 05

Mr. Karl W. Singer Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:

Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Glenn W. Morris, Manager Nuclear Operations Corporate Nuclear Licensing Tennessee Valley Authority and Industry Affairs 6A Lookout Place Tennessee Valley Authority 1101 Market Street 4X Blue Ridge Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice President Nuclear Engineering and Technical Services Mr. Paul L. Pace, Manager Tennessee Valley Authority Licensing and Industry Affairs 6A Lookout Place Watts Bar Nuclear Plant 1101 Market Street Tennessee Valley Authority Chattanooga, TN 37402-2801 P.O. Box 2000 Spring City, TN 37381 Mr. Robert J. Beecken, Vice President Nuclear Support Mr. Jay Laughlin, Plant Manager Tennessee Valley Authority Watts Bar Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Mr. Michael D. Skaggs Senior Resident Inspector Site Vice President Watts Bar Nuclear Plant Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission Tennessee Valley Authority 1260 Nuclear Plant Road P.O. Box 2000 Spring City, TN 37381 Spring City, TN 37381 County Executive General Counsel 375 Church Street Tennessee Valley Authority Suite 215 ET 11A Dayton, TN 37321 400 West Summit Hill Drive Knoxville, TN 37902 County Mayor P. O. Box 156 Mr. John C. Fornicola, Manager Decatur, TN 37322 Nuclear Assurance and Licensing Tennessee Valley Authority Mr. Lawrence E. Nanney, Director 6A Lookout Place Division of Radiological Health 1101 Market Street Dept. of Environment & Conservation Chattanooga, TN 37402-2801 Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, Tennessee 37854

EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION TENNESSEE VALLEY AUTHORITY RELIEF REQUEST TO USE CODE CASE N-597-1 TO ANALYTICALLY EVALUATE PIPE WALL THINNING OF ASME CLASS 2 CARBON STEEL MAIN FEEDWATER PIPING WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-390

1.0 INTRODUCTION

By letter dated March 25, 2005 (ADAMS Accession No. ML050970082), Tennessee Valley Authority (TVA, the licensee), pursuant to Title 10 of the Code of Federal Regulations (10 CFR)

Section 50.55a(a)(3)(i), requested relief from the American Society of Mechanical Engineering (ASME) Code Section XI requirements to repair or replace an ASME Class 2 low alloy steel piping elbow associated with the main feedwater system at Watts Bar Nuclear Plant (WBN),

Unit 1. As an alternative, the licensee proposed to use the provisions of ASME Code Case N-597-1, Requirements for Analytical Evaluation of Pipe Wall Thinning,Section XI, Division 1, to analytically evaluate the effect of potential pipe wall thinning in an elbow on the structural integrity of the system under the Faulted Condition loading, which included Check Valve Slam (CVS) waterhammer and Safe Shutdown Earthquake (SSE) seismic loading. The potential pipe wall thinning was projected to take place by the WBN CHECWORKS program.

During implementation of WBN's Unit 1 Cycle 6 Refueling Outage (RFO) Flow Accelerated Corrosion (FAC) Program, ultrasonic examination (UT) detected wall thinning in an ASME Code Class 2 main feedwater piping elbow at the steam generator Loop 2 inlet nozzle. Currently, the thickness is greater than the ASME Code required minimum wall thickness tmin. Based on UT thickness measurements and the predicted wear rate, it was determined that the predicted wall thickness tp will fall below the required minimum wall thickness tmin 13 months after startup from the RFO. The other three steam generator elbows to the inlet nozzles were ultrasonically examined and were found acceptable.

Specifically, the UT examination of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),

the predicted wall thickness tp at the Cycle 7 RFO is calculated to be 0.605 inches. The allowable minimum wall thickness tmin as calculated by the equation specified in Code Case N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. As noted, the predicted wall thickness tp of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches, but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of Code Case N-597-1.

WBN is currently in the first 10-year inservice inspection interval. The 1989 Edition of the ASME Code,Section XI with no Addenda governs the current repair and replacement activities at this plant.

Use of Code Case N-597-1 was previously requested by TVA for this same component following the Cycle 5 RFO, and was approved in Nuclear Regulatory Commissions (NRC's)

Safety Evaluation of Request for Relief 1-RR-05 (TAC No. MC1580), dated August 27, 2004 (ML042430029).

2.0 REGULATORY EVALUATION

As specified in 10 CFR 50.55a(g), inservice inspection (ISI) of nuclear power plant components shall be performed in accordance with the requirements of the ASME Boiler and Pressure Vessel Code (Code),Section XI, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i).

Pursuant to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Title 10 CFR 50.55a(g)(5)(iii) states that if the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in §50.4, information to support the determinations.

2.1 Licensees Evaluation Summary:

During implementation of WBN's Unit 1 Cycle 6 RFO FAC Program, UT detected wall thinning in an ASME Code Class 2 main feedwater piping elbow at the steam generator Loop 2, inlet nozzle. The FAC Program identifier for this component is grid 103BE252. Currently, the thickness is greater than the required minimum wall thickness tmin. Based on UT thickness measurements, predicted wear rate, and analytical analysis, it was determined that the predicted wall thickness tp will fall below the required minimum wall thickness tmin, 13 months after startup from the RFO. However, analysis demonstrates the elbow meets the alternative evaluation criteria of ASME Code Case N-597-1, Section -3600. This condition was reported in WBN's Corrective Action Program, as Problem Evaluation Report (PER) 77658. The other three steam generator elbows to the inlet nozzles were ultrasonically examined and were found acceptable.

Use of the code case was requested for this same component following the Cycle 5 RFO and was approved by letter to TVA dated August 27, 2004, Safety Evaluation of Request for Relief 1-RR-05 on the Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning at Watts Bar Nuclear Power Plant, Unit 1(ML042430029). The safety evaluation requires additional relief for continued operation until the end of Cycle 7 and the relief request is to meet the following condition: The licensee must demonstrate that the structural integrity and safety of the degraded elbow will be ensured by performing a stress analysis, using the set of ultrasonic testing data recorded during the Cycle 6 RFO and projected to the end of Cycle 7. The stress

analysis should be based on the licensing basis methodology that was approved by the staff in the resolution of Watts Bar Outstanding Issue 20(a), Feedwater Check Valve Slam, and documented in Supplement No. 13 of NUREG-0847, Watts Bar Safety Evaluation Report, in accordance with the provisions of Code Case N-597-1 for piping stress analysis.

The Cycle 6 RFO FAC Program UT of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),

the predicted wall thickness tp at the Cycle 7 RFO is calculated to be 0.605 inches.

The allowable minimum wall thickness tmin as calculated by the equation specified in Code Case N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. This equation is essentially the same equation for calculating the minimum wall thickness based upon the allowable hoop stresses.

As noted, the predicted wall thickness tp of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of the Code Case. Thus, TVA is requesting review and approval for application of the Code Case N-597-1 as allowed by the conditions of Regulatory Guide (RG) 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 13. Application of the Code Case provides an acceptable level of quality and safety for this application.

Component:

FAC Grid 103BE252, 16-inch nominal pipe size feedwater pipe 45 degree elbow at the inlet to Loop 2 Steam Generator, ASME Code Class 2.

Code Requirement:

ASME Section XI, 1989 Edition, IWA-4300 provides a process for assessing a component for continued service after a defect has been removed. This provision stipulates that where the section thickness has been reduced below the minimum design wall thickness, the component shall be repaired. As an alternative, the component may be evaluated and accepted in accordance with the design rules of either the Construction Code or Section III.

Basis for Relief:

RG 1.147, Revision 13, conditionally accepted the use of Code Case N-597-1 subject to five conditions. Some of these conditions require NRC review and approval prior to continued use of the Code Case.

Proposed Alternative:

As an alternative to the requirements of IWA-4300, TVA proposes to use the provisions of ASME Code Case N-597-1 for analytical evaluation of FAC grid 103BE252, subject to the conditions incorporated into the acceptance of the Code Case in RG 1.147, Revision 13.

Justification for Granting of Relief:

Actual wall thickness measurements were taken by ultrasonic examination on February 27 and 28, 2005, during the Cycle 6 RFO. A copy of the examination data report is included in to the licensees submittal (ML050970082). This is the second set of thickness measurements taken for this component. The data grid points for these measurements are established by procedure and are taken from the grid pattern on the component surface as depicted in the sketches labeled View 1, View 2, and View 3 of Enclosure 2.

The Cycle 6 RFO FAC Program UT of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the Cycle 5 RFO minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor),

the predicted wall thickness tp at the Cycle 7 RFO is calculated to be 0.605 inches.

The allowable minimum wall thickness tmin as calculated by the equation specified in Code Case N-597-1 Paragraph -3622.1(a)(1) is 0.613 inches. This equation is essentially the same equation for calculating the minimum wall thickness based upon the allowable hoop stresses.

As noted, the predicted wall thickness tp of 0.605 inches will fall below the minimum wall thickness tmin of 0.613 inches but will be greater than 90 percent of the minimum wall thickness tmin as allowed by the provision of the Code Case. Thus, TVA is requesting review and approval for application of the Code Case N-597-1 as allowed by the conditions of RG 1.147, ?Inservice inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 13. Application of the Code Case provides an acceptable level of quality and safety for this application.

2.2 Staff Evaluation The staff reviewed the information provided by TVA in support of its request for relief from ASME Section XI requirements to permanently repair or replace an ASME Class 2 alloy steel piping elbow at WBN. The staff evaluation of the request follows.

In Enclosure 2 to its Request for Relief, TVA addressed wall thinning by FAC in an ASME Section III Class 2 degraded elbow located in Loop 2 of the WBN, Unit 1 Main Feedwater System. The elbow is fabricated from 16-inch, Schedule 80, SA-333 Grade 6 material. For this elbow the nominal thickness tnom = 0.844 inches. The evaluation of the piping was based on the application of ASME Section XI Code Case N-597-1. This Code Case was conditionally accepted by the staff as documented in RG 1.147, with conditions listed in Table 2 of the Guide.

Condition (2) for this Code Case, as listed in RG 1.147, states that: Components affected by FAC to which this Code Case are applied must be repaired or replaced in accordance with the construction code of record and Owners requirements or a later NRC-approved edition of Section III of the ASME Code, prior to the value of tp (minimum projected wall thickness) reaching the Code required minimum wall thickness, tmin, as specified in Paragraph -3622.1(a)(1) of this Code Case. Alternatively, the use of this Code Case is subject to NRC review and approval.

Based on measured wall-thickness data taken during the Cycle 5 RFO in September 2003, the minimum measured wall thickness was determined to be 0.639 inches. On the basis of wear rates computed using WBN FAC Program methods (including a 10 percent safety factor), the

minimum predicted wall thickness tp at the end of current operating Cycle 6 (1.5 years later, or February 2005) was determined as tp = 0.598 inches.

Based on measured wall-thickness data taken during the Cycle 6 RFO in February 2005, the minimum measured wall thickness was determined to be 0.635 inches (not as predicted tp = 0.598 inches). On the basis of wear rates computed using WBN FAC Program methods (including a 10 percent safety factor), the current minimum predicted wall thickness tp at the time of the Cycle 7 RFO (1.5 years after Cycle 6 RFO) is tp = 0.605 inches.

The Code required minimum wall thickness tmin was determined to be 0.613 inches. Since this value falls between the minimum measured wall thickness during Cycle 6 RFO and the predicted Cycle 6 RFO minimum wall thickness, the licensee determined, based on the computed wear rate, that the wall thickness will reach the Code-required minimum wall thickness tmin 13 months into the current operating cycle, (i.e., sometime in April 2006). This would potentially constitute a deviation from the licensing basis of the plant and thus require plant shutdown to repair or replace the degraded elbow. Therefore, TVA requested relief from the ASME Code requirements so that plant operation can continue until the end of current operating Cycle 7.

Subsection -3221 of Code Case N-597-1, Acceptance by Examination, states that piping items whose examination and evaluation results reveal that tp meets the acceptance standards of Section -3500 or the Construction Code are acceptable for continued service.

Paragraph -3500(a)(1) of Section -3500, Wall Thickness Acceptance Standards, states that for straight pipe and elbows purchased to a nominal pipe specification with an allowable wall thickness under-tolerance of 12 percent, tp shall not be less than 0.875tnom. For this elbow, 0.875tnom = 0.739 inches, which is greater than both the current measured minimum wall thickness and the predicted minimum wall thickness tp. The acceptance criterion by examination was, therefore, not met. When this criterion cannot be met, Subsection -3221 states that alternative acceptance standards stated in Subsections -3222, -3223, and -3224 may be used.

Subsection -3223 of Code Case N-597-1, Acceptance by Engineering Evaluation, states that for Class 2 and 3 piping, an acceptable evaluation method and criteria are provided in Section -3600, Analytical Evaluation for Class 2 and Class 3 Piping Items. Subsection -3610, General Requirements, states that: (a) analytical evaluations shall be conducted in accordance with the Construction Code. Later Code Editions and Addenda may be used. Use of later Code Editions and Addenda shall be reviewed for acceptability to the regulatory and enforcement authorities having jurisdiction at the plant site, (b) analytical evaluations shall be conducted using the predicted wall thickness tp at the next examination of the piping item, (c) a piping item is acceptable for continued service if the minimum pipe wall thickness, branch reinforcement requirements, and piping stress criteria of the Construction Code used in the evaluation are met for all specified loading conditions, and (d) as an alternative to item (c), butt welded pipe, elbow, branch connection, and reducer piping items may be evaluated in accordance with Section -3620, Evaluation of Pipe, Elbows, Branch Connections and Reducers.

The general requirements stated in Subsection -3621 of Section -3620 state the following:

(a) the evaluation shall meet the requirements of Subsection -3622 and Paragraph -3622.1, (b) for a branch connection or tee, the region within the limits of reinforcement defined in the Construction Code shall meet the requirements of Subsection -3624, and (c) evaluations shall be conducted using the appropriate piping equations, loadings, load combinations, allowable material properties, and other acceptance standards from the Construction Code used in the evaluation, except as specifically modified by this Case. Paragraph -3622.1(a), Evaluation for Minimum Wall Thickness, of Subsection -3622, Thickness Evaluation, also states that, except as provided in Paragraph -3622.1(b), the value of tp shall not be less than 90 percent of the minimum wall thickness of the piping item, tmin, required for design pressure, defined in the Construction Code used in the evaluation, exclusive of any additional corrosion allowance.

Based on the Code required minimum wall thickness tmin for this elbow of 0.613 inches, the licensee determined that 90 percent of tmin is 0.552 inches. The staff finds that TVA has shown that the predicted minimum wall thickness is less than tmin but greater than 0.9tmin, and therefore meets the criterion in this section.

The feedwater system was initially designed and qualified to ASME Code Class 2 piping. As a result of the discovery for potential CVS waterhammer loading, following a postulated pipe rupture at the main header in the Turbine Building, the NRC staff identified Outstanding Issue 20(a), Feedwater Check Valve Slam, in NUREG-0847, Watts Bar Safety Evaluation Report, Supplement No. 6, dated April 1991. The issue was the qualification of the feedwater piping system inside containment, from the check valves to the steam generator nozzles, to Level D service limits when subjected to the faulted condition load combination of CVS waterhammer and SSE loading.

To qualify the Class 2 system for licensing under combined CVS and SSE loading, the licensee performed a dynamic, elastic-plastic analysis, using the computer program ANSYS. The as-built nominal wall thickness (tnom = 0.844 inches) and as-built support configuration values were used as input. In conjunction with this analysis, the licensee also invoked the Level D Service (faulted condition) stress limits for pressure boundary integrity stated in ASME Section III Appendix F (1980 Edition through Winter 1982 Addenda, or a later Edition) for plastic analysis. Although the limits of Appendix F specified in the 1980 Edition were valid only for qualification of ASME Class 1 piping, the staff approved the application of these limits for qualification of this Class 2 system. These limits are significantly higher than the faulted conditions limits specified for Class 2 piping. During the initial licensing review for WBN, the NRC staff reviewed the ANSYS analysis and found it acceptable. The staff also approved the application of Class 1 limits for the qualification of Class 2 piping. These findings and the resolution of Licensing Issue 20(a) were documented in NUREG-0847, ?Watts Bar Safety Evaluation Report, Supplement No. 13, dated April 1994.

The NRCs safety evaluation in its letter to TVA dated August 27, 2004, Safety Evaluation of Request for Relief 1-RR-05 on the Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning at Watts Bar Nuclear Power Plant, Unit 1 (ML042430029), indicated that the following condition would have to be met, if TVA intended to request subsequent relief and approval at RFO Cycle 6 for application of the provisions of Code Case N-597-1 to this component to the end of Cycle 7: The licensee must demonstrate that the structural integrity and safety of the degraded elbow will be ensured by performing a stress analysis, using the set of ultrasonic testing data recorded during the Cycle 6 RFO and projected to the end of Cycle 7. The stress analysis should be based on the licensing basis methodology that was approved by the staff in the resolution of Watts Bar Outstanding Issue 20(a), Feedwater Check Valve Slam, and

documented in Supplement No. 13 of NUREG-0847, "Watts Bar Safety Evaluation Report," in accordance with the provisions of Code Case -597-1 for piping stress analysis.

As stated above, the RFO Cycle 6 FAC Program ultrasonic examination of the elbow found the current minimum measured wall thickness tmeas to be 0.635 inches in Row 2 on the upstream end of the elbow. This is the same location as the RFO Cycle 5 minimum measured wall thickness tmeas of 0.639 inches. Using an estimated wall thinning rate of 0.0197 inches/year (which includes a 10-percent safety factor), the predicted wall thickness tp at the RFO Cycle 7 RFO is calculated to be 0.605 inches.

Based on the measured Cycle 6 RFO wall thickness, the licensee performed, in support of its relief request, a stress analysis of the degraded elbow with the wall thinning predicted to occur by the end of the operating Cycle 7, in accordance with the provisions of Section -3623 of the Code Case. The licensee submitted this analysis for staff evaluation, in accordance with Condition (2) stated in Table 2 of RG 1.147 for Code Case N-597-1, and the condition requirement stated in the NRC letter.

In accordance with this requirement, the licensee provided the measured Cycle 6 RFO UT elbow thicknesses and the results of two stress analyses for staff review and evaluation. The analyses used elbow geometrical properties (such as cross-sectional area and moment of inertia) based on the average wall thickness, calculated from the projected minimum wall thicknesses at RFO Cycle 7 of the highest degraded cross-section in the elbow. One analysis consisted of an ASME Section III Class 2 elastic analysis of the degraded elbow for all load combinations that did not include CVS waterhammer loading. This analysis was shown to meet the ASME Section III Class 2 allowable stresses for piping. The highest stress ratio (maximum stress / allowable stress) was determined as 0.996 < 1.0. This analysis also meets the evaluation requirements stated in Subsection -3623.1, Evaluation Requirements, which require that the stress evaluation be performed using the equations required by the Construction Code.

The second stress analysis consisted of an elastic elbow analysis based on the ASME Section III Class 1 methodology. This analysis used the internal moments calculated from the ANSYS elastic-plastic piping system analysis, subject to the CVS and SSE load combination, that had previously been evaluated and approved by the staff in Supplement 13 of NUREG-0847. The highest stresses were compared against the ASME Section III Appendix F stress limits that had also previously been approved in this supplement. This approach was used as an alternative to performing an ANSYS full elastic-plastic analysis with the highest degraded wall thickness in the entire elbow. Based on this analysis, the licensee demonstrated that the primary membrane and primary membrane-plus-bending stress intensities will meet the Supplement No.13 stress limits in the Cycle 7 RFO degraded condition. The highest stress ratio (maximum stress / allowable stress) was determined as 0.967 < 1.0. The staff evaluated the licensees approach and concluded that, for this one-time request for relief, the analysis satisfies the intent of the methodology and the ASME Section III Appendix F stress limits accepted by the staff in Supplement No. 13 of NUREG-0847.

Based on the above evaluation, the staff finds that the licensee has provided reasonable assurance that it is unlikely that the structural integrity of the degraded elbow will be compromised prior to the Cycle 7 RFO.

3.0 CONCLUSION

Based on the above evaluation, the staff concludes that the application by the licensee of the relevant provisions of Code Case N-597-1 has provided reasonable assurance that the structural integrity and safety of the degraded elbow will be ensured for continued operation until the Cycle 7 RFO. This assurance was provided by the results of stress analyses of the degraded elbow using the set of UT data recorded during the Cycle 6 RFO and projected to the Cycle 7 RFO, in accordance with the provisions of Code Case N-597-1 for piping stress analysis, and the condition stated in the NRC Safety Evaluation dated August 27, 2004. The stress analysis that complied with this condition was based on an acceptable alternative to the licensing basis methodology, but applied the ASME Section III Appendix F stress limits that were approved by the staff in the resolution of Outstanding Issue 20(a), Feedwater Check Valve Slam, and documented in Supplement No. 13 of NUREG-0847, Watts Bar Safety Evaluation Report. However, the wall thickness is projected to degrade to the Code minimum wall thickness approximately 13 months into Cycle 7. The licensee will therefore be required to repair or replace the degraded elbow, in accordance with the requirements of ASME Section XI, at the Cycle 7 RFO. These requirements will be met by the licensees commitment to replace the degraded elbow during the steam generator replacement during the Cycle 7 RFO, In summary, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative provides an acceptable level of quality and safety and is, therefore, authorized for the duration of the current operating Cycle 7 for WBN, Unit 1. All other ASME Code Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.

Principle Contributors: George Georgiev, DCI/CPNB Mark Hartzman, DE/EEMB Date: January 27, 2006