| {{#Wiki_filter:Questions Missed by 50% or Greater of Candidates November 2006 Waterford 3 Written Examination Qst # 2 3 5 17 33 38 42 64 65 72 79 Question Analysis Missed by 5 of 9 candidates. | | {{#Wiki_filter:Questions Missed by 50% or Greater of Candidates November 2006 Waterford 3 Written Examination Qst # Question Analysis 2 Missed by 5 of 9 candidates. All 5 candidates selected A as the answer. There is no correct answer for this question. A request for NRC review and suggested actions is being submitted on a separate document. |
| All 5 candidates selected A as the answer. There is no correct answer for this question. | | 3 Missed by 6 of 9 candidates. 5 candidates selected D as the answer, and 1 candidate selected B. The question tested at a higher cognitive level than required by the referenced objective. A request for NRC review and suggested actions is being submitted on a separate document. ~~~ |
| A request for NRC review and suggested actions is being submitted on a separate document. Missed by 6 of 9 candidates. | | 5 Missed by 5 of 9 candidates. 4 candidates selected D as the answer, and 1 candidate selected B. A recent procedure revision makes answers C and D both correct answers. |
| 5 candidates selected D as the answer, and 1 candidate selected B. The question tested at a higher cognitive level than required by the referenced objective. | |
| A request for NRC review and suggested actions is being submitted on a separate document. | |
| ~~~ Missed by 5 of 9 candidates. 4 candidates selected D as the answer, and 1 candidate selected B. A recent procedure revision makes answers C and D both correct answers. A request for NRC review and suggested actions is being submitted on a separate document. Missed by 5 of 9 candidates. 2 candidates selected C as the answer, 2 candidates selected B, and 1 candidate selected A. The required knowledge is considered too detailed and infrequently used to be expected to be performed from memory. | |
| A request for NRC review and suggested actions is being submitted on a separate document. Missed by 7 of 9 candidates.
| |
| 5 candidates selected D as the answer, and 2 candidates selected B. D is incorrect. The SITS would inject a large volume of cold water into the RCS if pressure were reduced far enough, but this is NOT mentioned as a major concern in the TG.
| |
| B is incorrect.
| |
| The SD states that SITS are used to supply borated water to the reactor vessel during the blowdown phase of a LB LOCA. The TG for this step states that this protection is NOT required below 1000 psia. Waterford has determined that this question is valid. Missed by 6 of 9 candidates.
| |
| All 6 candidates selected A as the answer. 2200°F is the temperature when zirc hydriding becomes self-sustaining, not clad melting threshold.
| |
| Waterford has determined that this question is valid.
| |
| Missed by 5 of 9 candidates.
| |
| 4 candidates selected A as the answer, and 1 candidate selected D. A is incorrect; OP-005-004 requires
| |
| <IO0 psid prior to opening MSIV, not <250 psid. D is incorrect; SBCS are verified to be in AUTO prior to pressurizing main steam system.
| |
| Waterford has determined that this question is valid.
| |
| Missed by 6 of 9 candidates.
| |
| All 6 candidates selected D as the answer. The question tested at a different level than required by the referenced objective.
| |
| A request for NRC review and suggested actions is being submitted on a separate document. | | A request for NRC review and suggested actions is being submitted on a separate document. |
| Missed by 5 of 9 Candidates. | | 17 Missed by 5 of 9 candidates. 2 candidates selected C as the answer, 2 candidates selected B, and 1 candidate selected A. The required knowledge is considered too detailed and infrequently used to be expected to be performed from memory. A request for NRC review and suggested actions is being submitted on a separate document. |
| 3 candidates selected C as the answer, 1 candidate selected B, and 1 candidate selected A. The question requires memorization of RM indicating range and setpoints.
| | 33 Missed by 7 of 9 candidates. 5 candidates selected D as the answer, and 2 candidates selected B. D is incorrect. The SITS would inject a large volume of cold water into the RCS if pressure were reduced far enough, but this is NOT mentioned as a major concern in the TG. B is incorrect. The SD states that SITS are used to supply borated water to the reactor vessel during the blowdown phase of a LB LOCA. The TG for this step states that this protection is NOT required below 1000 psia. Waterford has determined that this question is valid. |
| Waterford has determined that this question is valid. Missed by 5 of 9 candidates. 4 candidates selected B as the answer, and 1 candidate selected A. A and B are incorrect.
| | 38 Missed by 6 of 9 candidates. All 6 candidates selected A as the answer. 2200°F is the temperature when zirc hydriding becomes self-sustaining, not clad melting threshold. Waterford has determined that this question is valid. |
| 60 minutes is only 25 rem; 50 rem is the extremity limit for PSEs. A is also incorrect because the Operations Manager authorization is not required for Planned Special Exposures.
| | 42 Missed by 5 of 9 candidates. 4 candidates selected A as the answer, and 1 candidate selected D. A is incorrect; OP-005-004 requires <IO0 psid prior to opening MSIV, not <250 psid. D is incorrect; SBCS are verified to be in AUTO prior to pressurizing main steam system. |
| Waterford has determined that this auestion is valid. Missed by 2 of 4 candidates. 2 candidates selected C as the answer. 01-038-000 step 5.4.31 for HPSl Throttle Criteria states that at least one charging pump must remain in operation unless this creates a challenge to the pressurizer safety valves. | |
| Waterford has determined that this question is valid. | | Waterford has determined that this question is valid. |
| Questions Missed by 50% or Greater of Candidates November 2006 Waterford 3 Written Examination 99 Qst# I Question Analysis Missed by 3 of 4 candidates.
| | 64 Missed by 6 of 9 candidates. All 6 candidates selected D as the answer. The question tested at a different level than required by the referenced objective. A request for NRC review and suggested actions is being submitted on a separate document. |
| All 3 candidates selected A as the answer.
| | 65 Missed by 5 of 9 Candidates. 3 candidates selected C as the answer, 1 candidate selected B, and 1 candidate selected A. The question requires memorization of RM indicating range and setpoints. Waterford has determined that this question is valid. |
| OP-002-010 Precaution 3.1.6 states that only one sample pump is needed to commence Purge.
| | 72 Missed by 5 of 9 candidates. 4 candidates selected B as the answer, and 1 candidate selected A. A and B are incorrect. 60 minutes is only 25 rem; 50 rem is the extremity limit for PSEs. A is also incorrect because the Operations Manager authorization is not required for Planned Special Exposures. Waterford has determined that this auestion is valid. |
| Waterford has determined that this question is valid. 83 Missed by 2 of 4 candidates. | | 79 Missed by 2 of 4 candidates. 2 candidates selected C as the answer. 01-038-000 step 5.4.31 for HPSl Throttle Criteria states that at least one charging pump must remain in operation unless this creates a challenge to the pressurizer safety valves. Waterford has determined that this question is valid. |
| 2 candidates selected A as the answer. OP-003-010, SG Blowdown, Caution for section 8.12 indicates that draining to Main Condenser is preferable to Regen Waste Tank to prevent rad release to RAB. Waterford has determined that this question is valid. 94 ~~ Missed by 2 of 4 candidates. | | |
| 1 candidate selected A as the answer, and 1 candidate selected C. A is incorrect; OP-901-502 Immediate actions are not performed in a security event. OPS must coordinate with Security prior to CR evacuation. C is incorrect; OP-901-523 directs entry into E,, Fire section of OP-901-502. | | Questions Missed by 50% or Greater of Candidates November 2006 Waterford 3 Written Examination Qst# I Question Analysis 83 Missed by 2 of 4 candidates. 2 candidates selected A as the answer. OP-003-010, SG Blowdown, Caution for section 8.12 indicates that draining to Main Condenser is preferable to Regen Waste Tank to prevent rad release to RAB. Waterford has determined that this question is valid. |
| Waterford has determined that this question is valid.}} | | ~~ |
| | 94 Missed by 2 of 4 candidates. 1 candidate selected A as the answer, and 1 candidate selected C. A is incorrect; OP-901-502 Immediate actions are not performed in a security event. OPS must coordinate with Security prior to CR evacuation. C is incorrect; OP-901-523 directs entry into E,, Fire section of OP-901-502. Waterford has determined that this question is valid. |
| | 99 Missed by 3 of 4 candidates. All 3 candidates selected A as the answer. OP-002-010 Precaution 3.1.6 states that only one sample pump is needed to commence Purge. Waterford has determined that this question is valid.}} |
|
---|
Category:License-Operator
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 2024-09-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines 2024-09-03
[Table view] |
Text
Questions Missed by 50% or Greater of Candidates November 2006 Waterford 3 Written Examination Qst # Question Analysis 2 Missed by 5 of 9 candidates. All 5 candidates selected A as the answer. There is no correct answer for this question. A request for NRC review and suggested actions is being submitted on a separate document.
3 Missed by 6 of 9 candidates. 5 candidates selected D as the answer, and 1 candidate selected B. The question tested at a higher cognitive level than required by the referenced objective. A request for NRC review and suggested actions is being submitted on a separate document. ~~~
5 Missed by 5 of 9 candidates. 4 candidates selected D as the answer, and 1 candidate selected B. A recent procedure revision makes answers C and D both correct answers.
A request for NRC review and suggested actions is being submitted on a separate document.
17 Missed by 5 of 9 candidates. 2 candidates selected C as the answer, 2 candidates selected B, and 1 candidate selected A. The required knowledge is considered too detailed and infrequently used to be expected to be performed from memory. A request for NRC review and suggested actions is being submitted on a separate document.
33 Missed by 7 of 9 candidates. 5 candidates selected D as the answer, and 2 candidates selected B. D is incorrect. The SITS would inject a large volume of cold water into the RCS if pressure were reduced far enough, but this is NOT mentioned as a major concern in the TG. B is incorrect. The SD states that SITS are used to supply borated water to the reactor vessel during the blowdown phase of a LB LOCA. The TG for this step states that this protection is NOT required below 1000 psia. Waterford has determined that this question is valid.
38 Missed by 6 of 9 candidates. All 6 candidates selected A as the answer. 2200°F is the temperature when zirc hydriding becomes self-sustaining, not clad melting threshold. Waterford has determined that this question is valid.
42 Missed by 5 of 9 candidates. 4 candidates selected A as the answer, and 1 candidate selected D. A is incorrect; OP-005-004 requires <IO0 psid prior to opening MSIV, not <250 psid. D is incorrect; SBCS are verified to be in AUTO prior to pressurizing main steam system.
Waterford has determined that this question is valid.
64 Missed by 6 of 9 candidates. All 6 candidates selected D as the answer. The question tested at a different level than required by the referenced objective. A request for NRC review and suggested actions is being submitted on a separate document.
65 Missed by 5 of 9 Candidates. 3 candidates selected C as the answer, 1 candidate selected B, and 1 candidate selected A. The question requires memorization of RM indicating range and setpoints. Waterford has determined that this question is valid.
72 Missed by 5 of 9 candidates. 4 candidates selected B as the answer, and 1 candidate selected A. A and B are incorrect. 60 minutes is only 25 rem; 50 rem is the extremity limit for PSEs. A is also incorrect because the Operations Manager authorization is not required for Planned Special Exposures. Waterford has determined that this auestion is valid.
79 Missed by 2 of 4 candidates. 2 candidates selected C as the answer. 01-038-000 step 5.4.31 for HPSl Throttle Criteria states that at least one charging pump must remain in operation unless this creates a challenge to the pressurizer safety valves. Waterford has determined that this question is valid.
Questions Missed by 50% or Greater of Candidates November 2006 Waterford 3 Written Examination Qst# I Question Analysis 83 Missed by 2 of 4 candidates. 2 candidates selected A as the answer. OP-003-010, SG Blowdown, Caution for section 8.12 indicates that draining to Main Condenser is preferable to Regen Waste Tank to prevent rad release to RAB. Waterford has determined that this question is valid.
~~
94 Missed by 2 of 4 candidates. 1 candidate selected A as the answer, and 1 candidate selected C. A is incorrect; OP-901-502 Immediate actions are not performed in a security event. OPS must coordinate with Security prior to CR evacuation. C is incorrect; OP-901-523 directs entry into E,, Fire section of OP-901-502. Waterford has determined that this question is valid.
99 Missed by 3 of 4 candidates. All 3 candidates selected A as the answer. OP-002-010 Precaution 3.1.6 states that only one sample pump is needed to commence Purge. Waterford has determined that this question is valid.