|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER: | | {{#Wiki_filter:FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER: ____~O~5~OO~O~3~69~/~37~O~~~O~09~-~30~1~ |
| ____ | | ~O~5~OO~O~3~69~~~7~a~~~O~09~-~30~1~_____ |
| ____ _ GENERAL CORRESPONDENCE CONTENTS:
| | GENERAL CORRESPONDENCE CONTENTS: |
| Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS. Submitted By:
| | Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS. |
| ______ Verified By1!ialJ if FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER:
| | Submitted By: ~~...p".f- |
| ____
| | ~~...p"f-_ ____ _ __ __ __ Verified By1!ialJif ~ |
| ____ _ GENERAL CORRESPONDENCE CONTENTS:
| |
| Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS. Submitted By: | |
| _____ _
| |
| A Duke rtl1Energy February 24, 2009 Mr. Luis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415
| |
|
| |
|
| ==Subject:==
| | BRUCE H HAMILTON A Duke Vice President r'Energy rtl1Energy McGuire Nuclear Station Duke Energy Corporation MG01VP MG01 VP /12700 Hagers Ferry Road Huntersville, NC Ne 28078 704-875-5333 704-875-4809 fax February 24, 2009 bhhamilton@duke-energy.com A- Reyes Mr. Luis A. |
| Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP /12700 Hagers Ferry Road Huntersville, Ne 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com The enclosed information is provided in response to your request of December 16, 2008. This information is the outline for the McGuire licensed operator examinations to begin in May of 2009. . Specific items provided in response to this request: ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement ES 301-1, Administrative Topics Outline ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KlAs D-l, Scenario Outlines (4) The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
| | Regional Administrator, Region II U_ S. |
| B. H. Hamilton www.duke-energy.com A Duke r'Energy February 24, 2009 Mr. Luis A-Reyes Regional Administrator, Region II U_ S_ Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415
| | U. S_ Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos_ 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01VP /12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com The enclosed information is provided in response to your request of December 16, 2008. This information is the outline for the McGuire licensed operator examinations to begin in May of2009. Specific items provided in response to this request: ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement E S 301-1, Administrative T opi cs Outline ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KJAs D-l, Scenario Outlines (4) The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009. Questions or comments should be directed to Kay Crane at (704) 875-4306. | | Duke Energy Carolinas, LLC (Duke) |
| R H. Hamilton www.duke-energy.com | | McGuire Nuclear Station Nos_ 50-369, 50-370 Docket Nos. |
| | Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008. |
| | This information is the outline for the McGuire licensed operator examinations to begin in May of 2009. |
| | of2009. . |
| | Specific items provided in response to this request: |
| | ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement E |
| | ESS 301-1, Administrative T opi cs Outline Topics ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KlAs KJAs D-l, Scenario Outlines (4) |
| | The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009. |
| | Questions or comments should be directed to KayKay Crane at (704) 875-4306. |
| | R B. H. Hamilton www.duke-energy.com |
| | : u. S. Nuclear Regulatory Commission U. |
| | February 24, 2009 Page 3 bxc: RGC File EC050-ELL |
|
| |
|
| U. S. Nuclear Regulatory Commission February 24, 2009 Page 3 bxc: RGC File EC050-ELL
| | February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative. |
| : u. S. Nuclear Regulatory Commission February 24, 2009 Page 3 bxc: RGC File EC050-ELL February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
| |
| The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
| |
| As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. Steven L. Mosteller McGuire Operations February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
| |
| The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative. | |
| As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. | | As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. |
| Steven L. Mosteller McGuire Operations Duke Energy March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415 | | ~~ |
| | <1!iiJL~ |
| | Steven L. Mosteller McGuire Operations |
| | |
| | a Duke rtllEnergy BRUCE H HAMILTON Vice President Energy McGuire Nuclear Station Duke Energy Corporation MG01 VP //12700 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com bhhamilton@duke-energycom March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP / 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energycom The enclosed information is provided in response to your request of December 16, 2008. This information is in support of the McGuire licensed operator examinations to begin in May of 2009. Specific items provided in response to this request: | | Duke Energy Carolinas, LLC (Duke) |
| * Simulator Scenarios | | McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008. |
| -(ES-D-1, Scenario Outline Forms in the book) | | This information is in support of the McGuire licensed operator examinations to begin in May of 2009. |
| * Administrative Topics -(ES-301-1, Administrative Topics Outline Forms in the book) | | Specific items provided in response to this request: |
| * Job Performance Measures -(ES-301-2, Control Room Systems and Facility Walk-Through Test Outline Forms in the book) | | * Simulator Scenarios - (ES-D-1, Scenario Outline Forms in the book) |
| | * Administrative Topics - (ES-301-1, Administrative Topics Outline Forms in the book) |
| | * Job Performance Measures - (ES-301-2, Control Room Systems and Facility Walk-Through Test Outline Forms in the book) |
| * ES 201-2, Examination Outline Quality Checklist | | * ES 201-2, Examination Outline Quality Checklist |
| * ES 201-3, Examination Security Agreement | | * ES 201-3, Examination Security Agreement |
Line 57: |
Line 66: |
| * ES-401-6, Written Examination Quality Checklist Form | | * ES-401-6, Written Examination Quality Checklist Form |
| * Reactor Operator and Senior Reactor Operator Written Questions | | * Reactor Operator and Senior Reactor Operator Written Questions |
| * Reference Materials www.duke-energy.com a Duke rtllEnergy March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415 | | * Reference Materials www.duke-energy.com |
| | |
| | Nuclear Regulatory Commission 16, 2009 March 16,2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16, 2009. |
| | 16,2009. |
| | Questions or comments should be directed to Kay Crane at (704) 875-4306. |
| | B. H. Hamilton |
|
| |
|
| ==Subject:==
| | Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 |
| Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP /12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com The enclosed information is provided in response to your request of December 16, 2008. This information is in support of the McGuire licensed operator examinations to begin in May of 2009. Specific items provided in response to this request:
| | |
| * Simulator Scenarios
| | March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee 55.40(b)(3), |
| -(ES-D-1, Scenario Outline Forms in the book)
| | must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative. |
| * Administrative Topics -(ES-301-1, Administrative Topics Outline Forms in the book)
| | As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. |
| * Job Performance Measures -(ES-301-2, Control Room Systems and Facility Walk-Through Test Outline Forms in the book)
| | ~ |
| * ES 201-2, Examination Outline Quality Checklist
| | Steven L. Mosteller McGuire Operations}} |
| * ES 201-3, Examination Security Agreement
| |
| * ES-301-3, Operating Test Quality Checklist Form
| |
| * ES-301-4, Simulator Scenario Quality Checklist Form
| |
| * ES 301-5, Transient and Event Checklist Form
| |
| * ES-301-6, Competencies Checklist Form
| |
| * ES-401-6, Written Examination Quality Checklist Form
| |
| * Reactor Operator and Senior Reactor Operator Written Questions
| |
| * Reference Materials www.duke-energy.com Nuclear Regulatory Commission March 16, 2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16, 2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
| |
| B. H. Hamilton Nuclear Regulatory Commission March 16,2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16,2009. Questions or comments should be directed to Kay Crane at (704) 875-4306.
| |
| B. H. Hamilton Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
| |
| The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
| |
| As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. Steven L. Mosteller McGuire Operations March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval.
| |
| The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative. | |
| As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review. Steven L. Mosteller McGuire Operations}} | |
|
---|
Category:License-Operator
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents 2023-11-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML18242A6992018-08-30030 August 2018 301 ADAMS2D Page 1 Exam Admin Items ML18136A7762018-05-16016 May 2018 301 Post Exam Comments ML18106A3102018-04-11011 April 2018 William B. McGuire Nuclear Station - Operator Licensing Written Examination Approval 05000369/2018301 and 05000370/2018301 ML17188A2832017-07-0707 July 2017 Mcguire 2016301 Exam Administrative Items - Delay Release 2 Yrs ML17188A2802017-07-0707 July 2017 Exam Final Items - Delay Release 2 Yrs ML17188A2782017-07-0707 July 2017 McGuire 2016301 Exam Draft Items - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3442017-01-19019 January 2017 December 2016 - McGuire NRC Generic Fundamentals Examination Results Letter IR 05000369/20163012016-05-31031 May 2016 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2016301 and 05000370/2016301 ML16119A4342016-04-26026 April 2016 301 Post Exam Comments ML16119A4262016-04-26026 April 2016 301 Final RO Written Exam ML16119A4292016-04-26026 April 2016 301 Final SRO Written Exam ML15203A9702015-07-22022 July 2015 301 Draft Simulator Scenarios ML15203B1312015-07-22022 July 2015 301 Other Documents for Retention ML15203B1272015-07-22022 July 2015 301 General Correspondence ML15203B1092015-07-22022 July 2015 301 Post Exam Comments ML15203B1002015-07-22022 July 2015 301 Final Administrative JPMs ML15203B0982015-07-22022 July 2015 301 Final Simulator and in Plant JPMs ML15203B0922015-07-22022 July 2015 301 Final Simulator Scenarios ML15203B0192015-07-22022 July 2015 301 Draft Administrative JPMs ML15203A9822015-07-22022 July 2015 301 Draft Simulator and in Plant JPMs ML15203A9652015-07-22022 July 2015 301 Draft SRO Written Exam ML15203A9582015-07-22022 July 2015 301 Draft RO Written Exam ML15203A9512015-07-22022 July 2015 301 Draft Administrative Documents ML15203B0312015-07-22022 July 2015 301 Final Administrative Documents IR 05000369/20153012015-06-0303 June 2015 Operator License Examination 05000369/2015301 and 05000370/2015301, McGuire, 04/27/2015 - 05/02/2015 ML15141A1732015-05-20020 May 2015 301 Final SRO As-Given Written Exam ML15141A1662015-05-20020 May 2015 301 Final RO As-Given Written Exam ML15127A4152015-05-0707 May 2015 Initial Exam 2014-301 Final Administrative Documents ML15125A4812015-05-0505 May 2015 Initial Exam 2014-301 Final Simulator Scenarios ML15125A4832015-05-0505 May 2015 Initial Exam 2014-301 Final Sim IN-Plant JPMs ML15125A4902015-05-0505 May 2015 Initial Exam 2014-301 Final Administrative JPMs ML15125A4762015-05-0505 May 2015 Initial Exam 2014-301 Draft Adiminstrative JPMs 2023-11-03
[Table view] |
Text
FACILITY NAME: McGuire Nulear Plant Section 14 REPORTNUMBER: ____~O~5~OO~O~3~69~/~37~O~~~O~09~-~30~1~
~O~5~OO~O~3~69~~~7~a~~~O~09~-~30~1~_____
GENERAL CORRESPONDENCE CONTENTS:
Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS.
Submitted By: ~~...p".f-
~~...p"f-_ ____ _ __ __ __ Verified By1!ialJif ~
BRUCE H HAMILTON A Duke Vice President r'Energy rtl1Energy McGuire Nuclear Station Duke Energy Corporation MG01VP MG01 VP /12700 Hagers Ferry Road Huntersville, NC Ne 28078 704-875-5333 704-875-4809 fax February 24, 2009 bhhamilton@duke-energy.com A- Reyes Mr. Luis A.
Regional Administrator, Region II U_ S.
U. S_ Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415
Subject:
Duke Energy Carolinas, LLC (Duke)
McGuire Nuclear Station Nos_ 50-369, 50-370 Docket Nos.
Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008.
This information is the outline for the McGuire licensed operator examinations to begin in May of 2009.
of2009. .
Specific items provided in response to this request:
ES 201-2, Examination Outline Quality Checklist ES 201-3, Examination Security Agreement E
ESS 301-1, Administrative T opi cs Outline Topics ES 301-2, Control Room/In-Plant Systems Outline ES 301-5, Transient and Event Checklist ES 401-2, PWR Examination Outline ES 401-3, Generic Knowledge and Abilities ES 401-4, Record of Rejected KlAs KJAs D-l, Scenario Outlines (4)
The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-l 021, Section 201. The completion of this action is documented in the attached letter dated February 24,2009.
Questions or comments should be directed to KayKay Crane at (704) 875-4306.
R B. H. Hamilton www.duke-energy.com
- u. S. Nuclear Regulatory Commission U.
February 24, 2009 Page 3 bxc: RGC File EC050-ELL
February 24, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.
~~
<1!iiJL~
Steven L. Mosteller McGuire Operations
a Duke rtllEnergy BRUCE H HAMILTON Vice President Energy McGuire Nuclear Station Duke Energy Corporation MG01 VP //12700 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy.com bhhamilton@duke-energycom March 16, 2009 Mr. Louis A. Reyes Regional Administrator, Region II U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415
Subject:
Duke Energy Carolinas, LLC (Duke)
McGuire Nuclear Station Docket Nos. 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examinations 50-369/2009-301 and 370/2009-301 The enclosed information is provided in response to your request of December 16, 2008.
This information is in support of the McGuire licensed operator examinations to begin in May of 2009.
Specific items provided in response to this request:
- Simulator Scenarios - (ES-D-1, Scenario Outline Forms in the book)
- Administrative Topics - (ES-301-1, Administrative Topics Outline Forms in the book)
- ES 201-2, Examination Outline Quality Checklist
- ES 201-3, Examination Security Agreement
- ES-301-3, Operating Test Quality Checklist Form
- ES-301-4, Simulator Scenario Quality Checklist Form
- ES-401-6, Written Examination Quality Checklist Form
- Reactor Operator and Senior Reactor Operator Written Questions
- Reference Materials www.duke-energy.com
Nuclear Regulatory Commission 16, 2009 March 16,2009 Page 2 The McGuire Operations Facility Representative has reviewed and approved the proposed examination material per NUREG-1 021, Section 201. The completion of this action is documented in the attached letter dated March 16, 2009.
16,2009.
Questions or comments should be directed to Kay Crane at (704) 875-4306.
B. H. Hamilton
Nuclear Regulatory Commission March 16, 2009 Page 3 Mr. Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission Operator Licensing and Human Performance Branch Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Gerard W. Laska U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303
March 16, 2009 To Whom It May Concern Pursuant to 10 CFR 55.40(b )(3), an authorized representative of the facility licensee 55.40(b)(3),
must approve the examination outline(s) and the proposed examination(s) before they are submitted to the NRC regional office for review and approval. The outline(s) and examinations(s) must be forwarded to the NRC regional office with a cover letter signed by the facility representative.
As the McGuire facility representative, I have reviewed and approved the outlines for the NRC examination to be administered in May 2009. I have determined that the outlines are accurate, operationally valid and ready for NRC review.
~
Steven L. Mosteller McGuire Operations