ML12180A603: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 28, 2012 | {{#Wiki_filter:UNITE D S TATE S | ||
NUC LEAR RE GULATOR Y C OMMI S SI ON | |||
RE G IO N I V | |||
San Francisco, CA | 1600 EAST LAMAR BLVD | ||
AR L INGTON , TEXAS 7 60 11 - 4511 | |||
June 28, 2012 | |||
John T. Conway, Senior Vice President | |||
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012. | and Chief Nuclear Officer | ||
Pacific Gas and Electric Company | |||
the operating test based on the guidelines in NUREG-1021, | 77 Beale Street, B32 | ||
San Francisco, CA 94105 | |||
identified in Attachment 3 to ES-201 will be due by October 5, 2012. | SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - | ||
information in your response be contained in a separate enclosure and appropriately marked. | NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION | ||
05000275/2013301; 05000323/2013301 | |||
Dear Mr. Conway: | |||
In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior | |||
Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration | |||
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 | |||
and December 3, 2012. | |||
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory | |||
Commission (NRC) will prepare the written examination and will coordinate the development of | |||
the operating test based on the guidelines in NUREG-1021, Operator Licensing Examination | |||
Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and | |||
Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. Your staff will | |||
be given the opportunity to review the examinations during the week of July 20, 2012. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | |||
outlines by September 7, 2012. The operating tests and supporting reference materials | |||
identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10, | |||
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | |||
representative of the facility licensee shall approve the outlines and tests before they are | |||
submitted to the NRC for review and approval. All materials shall be complete and ready-to- | |||
use.] We request that any personal, proprietary, sensitive unclassified, or safeguards | |||
information in your response be contained in a separate enclosure and appropriately marked. | |||
Any delay in receiving the required reference materials, or the submittal of inadequate or | |||
incomplete materials, may cause the examinations to be rescheduled. In addition, your support | |||
for on-site validation of the examinations is required during the week of November 5, 2012. | |||
Mr. Conway -2- | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval number | |||
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if | |||
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If | |||
the applications are not received at least 30 days before the examination date, a postponement | |||
may be necessary. Signed applications certifying that all training has been completed should | |||
be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden | |||
for this collection of information is estimated to average 50 hours per response, including the | |||
time for reviewing instructions, gathering and maintaining the data needed, and completing and | |||
reviewing the collection of information. Send comments regarding this burden estimate or any | |||
other aspect of these information collections, including suggestions for reducing the burden, to | |||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | |||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | |||
INFOCOLLECTS@NRC.GOV. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Mr. Conway -3- | |||
ADAMS: | Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and | ||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
# | procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200- | ||
1159. | |||
Sincerely, | |||
/RA/ | |||
Mark S. Haire, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Dockets: 50-275; 50-323 | |||
Licenses: DPR-80; DPR-82 | |||
Electronic Distribution for Diablo Canyon | |||
ML12180A603 | |||
ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG | |||
# Publicly Available # Non-Sensitive | |||
Non-publicly Available Sensitive | |||
RIV: DRS/OPS RIV: DRS/BC OPS | |||
SGarchow MHaire | |||
/RA/ /RA/ | |||
06/27/2012 06/28/2012 | |||
}} | }} |
Latest revision as of 02:29, 12 November 2019
ML12180A603 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 06/28/2012 |
From: | Mark Haire Operations Branch IV |
To: | Conway J Pacific Gas & Electric Co |
vlm/Garchow S | |
References | |
50-275/13-301, 50-323/13-301 | |
Download: ML12180A603 (4) | |
See also: IR 05000275/2013301
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
RE G IO N I V
1600 EAST LAMAR BLVD
AR L INGTON , TEXAS 7 60 11 - 4511
June 28, 2012
John T. Conway, Senior Vice President
and Chief Nuclear Officer
Pacific Gas and Electric Company
77 Beale Street, B32
San Francisco, CA 94105
SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
05000275/2013301; 05000323/2013301
Dear Mr. Conway:
In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior
Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26
and December 3, 2012.
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory
Commission (NRC) will prepare the written examination and will coordinate the development of
the operating test based on the guidelines in NUREG-1021, Operator Licensing Examination
Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and
Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. Your staff will
be given the opportunity to review the examinations during the week of July 20, 2012.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by September 7, 2012. The operating tests and supporting reference materials
identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines and tests before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
use.] We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled. In addition, your support
for on-site validation of the examinations is required during the week of November 5, 2012.
Mr. Conway -2-
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should
be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Mr. Conway -3-
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-
1159.
Sincerely,
/RA/
Mark S. Haire, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-275; 50-323
Electronic Distribution for Diablo Canyon
ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG
- Publicly Available # Non-Sensitive
Non-publicly Available Sensitive
RIV: DRS/OPS RIV: DRS/BC OPS
SGarchow MHaire
/RA/ /RA/
06/27/2012 06/28/2012