05000440/FIN-2008002-07: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = | ||
| description = Severity Level IV The inspectors identified a non-cited violation of 10 CFR Part 50.72(b)(2)(iv)(B), \"Four Hour Reports.\" The inspectors determined that the licensee failed to report a manual actuation of the reactor protection system when it was not part of a preplanned sequence. Specifically, on June 22, 2007, the \'B\' reactor recirculation pump failed during a plant shutdown sequence and the licensee inserted a manual scram above preplanned power levels and not in accordance with the preplanned sequence. Licensee operators decided to insert the manual scram earlier than planned due to the unexpected loss of flow in the \'B\' reactor recirculation system loop. (Section 4OA1.b.1 | | description = Severity Level IV The inspectors identified a non-cited violation of 10 CFR Part 50.72(b)(2)(iv)(B), \\\"Four Hour Reports.\\\" The inspectors determined that the licensee failed to report a manual actuation of the reactor protection system when it was not part of a preplanned sequence. Specifically, on June 22, 2007, the \\\'B\\\' reactor recirculation pump failed during a plant shutdown sequence and the licensee inserted a manual scram above preplanned power levels and not in accordance with the preplanned sequence. Licensee operators decided to insert the manual scram earlier than planned due to the unexpected loss of flow in the \\\'B\\\' reactor recirculation system loop. (Section 4OA1.b.1 | ||
}} | }} |
Latest revision as of 19:47, 20 February 2018
Site: | Perry ![]() |
---|---|
Report | IR 05000440/2008002 Section 4OA1 |
Date counted | Mar 31, 2008 (2008Q1) |
Type: | TEV: Severity level IV |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71151 |
Inspectors (proximate) | M Wilk A Dahbur G Wright M Franke J Cameron |
INPO aspect | |
' | |