Unit 1 Cycle 16 Core Operating Limits Report (COLR)
Unit 1 Cycle 16 Core Operating Limits Report (COLR)
The purpose of this letter is to advise you of the Exelon Generation Company, LLC (EGC) review and approval of the LaSalle Unit 1 Cycle 16 reload licensing analyses under the provisions of 10 CFR 50.59, "Changes, tests and experiments," and to transmit Revision 0 of the Core Operating Limits Report (COLR) for Cycle 16, consistent with Generic Letter 88-16,"Removal of Cycle-Specific Parameter Limits From Technical Specifications." This report is being submitted in accordance with LaSalle County Station Technical Specifications (TS) 5.6.5, "Core Operating Limits Report (COLR)," item d.
The purpose of this letter is to advise you of the Exelon Generation Company, LLC (EGC) review and approval of the LaSalle Unit 1 Cycle 16 reload licensing analyses under the provisions of 10 CFR 50.59, "Changes, tests and experiments," and to transmit Revision 0 of the Core Operating Limits Report (COLR) for Cycle 16, consistent with Generic Letter 88-16, "Removal of Cycle-Specific Parameter Limits From Technical Specifications." This report is being submitted in accordance with LaSalle County Station Technical Specifications (TS) 5.6.5, "Core Operating Limits Report (COLR)," item d.
The reload licensing analyses performed for Cycle 16 utilized NRC approved methodologies.
The reload licensing analyses performed for Cycle 16 utilized NRC approved methodologies.
The Unit 1 Cycle 16 core, which consists of NRC approved fuel designs developed by AREVA NP Inc. and Global Nuclear Fuel - Americas, LLC (GNF-A) was designed to operate within approved fuel design criteria provided in the TS and related TS Bases.
The Unit 1 Cycle 16 core, which consists of NRC approved fuel designs developed by AREVA NP Inc. and Global Nuclear Fuel - Americas, LLC (GNF-A) was designed to operate within approved fuel design criteria provided in the TS and related TS Bases.
EGC has performed a review of the relevant reload licensing documents, associated TS Bases, and references in accordance with 10 CFR 50.59. This review concluded that the reload licensing analyses does not require NRC review and approval.
EGC has performed a review of the relevant reload licensing documents, associated TS Bases, and references in accordance with 10 CFR 50.59. This review concluded that the reload licensing analyses does not require NRC review and approval.
February 20, 2014 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this submittal, please contact Mr. Guy V. Ford, Jr., Regulatory Assurance Manager, at (815) 415-2800.
 
Respectfully, Peter J. Karaba Site Vice President LaSalle County Station  
February 20, 2014 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this submittal, please contact Mr. Guy V. Ford, Jr.,
Regulatory Assurance Manager, at (815) 415-2800.
Respectfully, Peter J. Karaba Site Vice President LaSalle County Station


==Attachment:==
==Attachment:==
Core Operating Limits Report for LaSalle Unit 1 Cycle 16, Revision 0 cc:Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station COLR LaSalle 1 Revision 14 Page 1 of 20 Core Operating Limits Report for LaSalle Unit I Cycle 16 Revision 0 COLR LaSalle 1 Revision 14 Page 2 of 20 Table of Contents 1.References ......................................................................................................................................4 2.Terms and Definitions ......................................................................................................................5 3.General Information .........................................................................................................................6 4.Average Planar Linear Heat Generation Rate
Core Operating Limits Report for LaSalle Unit 1 Cycle 16, Revision 0 cc:     Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station
..................................................................................7 5.Operating Limit Minimum Critical Power Ratio .................................................................................
 
8 5.1.Manual Flow Control MCPR Limits ...........................................................................................8 5.1.1.Power-Dependent MCPR
COLR LaSalle 1 Revision 14 Page 1 of 20 Core Operating Limits Report for LaSalle Unit I Cycle 16 Revision 0
...................................................................................................8 5.1.2.Flow-Dependent MCPR
 
......................................................................................................8 5.2.Scram Time
COLR LaSalle 1 Revision 14                                                         Page 2 of 20 Table of Contents
..............................................................................................................................8 5.3.Recirculation Flow Control Valve Settings .................................................................................
: 1. References ......................................................................................................................................4
9 6.Linear Heat Generation Rate .........................................................................................................13 7.Rod Block Monitor .........................................................................................................................16 8.Traversing In-Core Probe System .................................................................................................17 8.1.Description ..............................................................................................................................17 8.2.Bases.....................................................................................................................................17 9.Stability Protection Setpoints ........................................................................................................18 10.Modes of Operation .....................................................................................................................19 11.Methodology ................................................................................................................................20 COLR LaSalle 1 Revision 14 Page 3 of 20 List of Tables 3-1Cycle Exposure Range Definitions
: 2. Terms and Definitions ......................................................................................................................5
................................................................................................................
: 3. General Information .........................................................................................................................6
6 4-1MAPLHGR for GNF2 Fuel .............................................................................................................................7 4-2MAPLHGR for ATRIUM
: 4. Average Planar Linear Heat Generation Rate ..................................................................................7
-10 Fuel....................................................................................................................7 4-3MAPLHGR SLO Multiplier for GNF2 and ATRIUM-10 Fuel, BOC to EOC ...................................................7 5-1Scram Times Required for Option A and Option B Application at Notch Position 39 ...................................9 5-2Operating Limit Minimum Critical Power Ratio (OLMCPR) for ATRIUM-10 and GNF2 Fuel ......................10 5-3Power-Dependent MCPR Multipliers (Kp) for ATRIUM
: 5. Operating Limit Minimum Critical Power Ratio ................................................................................. 8 5.1. Manual Flow Control MCPR Limits ...........................................................................................8 5.1.1. Power-Dependent MCPR ...................................................................................................8 5.1.2. Flow-Dependent MCPR ......................................................................................................8 5.2. Scram Time ..............................................................................................................................8 5.3. Recirculation Flow Control Valve Settings ................................................................................. 9
-10 and GNF2 Fuel, DLO and SLO, BOC to EOC, Option A and Option B .................................................................................................................................11 5-4DLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM
: 6. Linear Heat Generation Rate .........................................................................................................13
-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B ................................................................................................12 5-5SLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B ................................................................................................12 6-1LHGR Limit for GNF2 Fuel
: 7. Rod Block Monitor .........................................................................................................................16
..........................................................................................................................
: 8. Traversing In-Core Probe System .................................................................................................17 8.1. Description ..............................................................................................................................17 8.2. Bases .....................................................................................................................................17
13 6-2LHGR Limit for ATRIUM-10 Fuel
: 9. Stability Protection Setpoints ........................................................................................................18
.................................................................................................................
: 10. Modes of Operation .....................................................................................................................19
13 6-3Power-Dependent LHGR Multipliers (LHGRFACP) for ATRIUM
: 11. Methodology ................................................................................................................................20
-10 and GNF2 Fuel, DLO and SLO, BOC to EOC.........................................................................................................................................................
 
14 6-4Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM
COLR LaSalle 1 Revision 14                                                                     Page 3 of 20 List of Tables 3-1  Cycle Exposure Range Definitions ................................................................................................................ 6 4-1  MAPLHGR for GNF2 Fuel .............................................................................................................................7 4-2  MAPLHGR for ATRIUM -10 Fuel ....................................................................................................................7 4-3  MAPLHGR SLO Multiplier for GNF2 and ATRIUM-10 Fuel, BOC to EOC ...................................................7 5-1  Scram Times Required for Option A and Option B Application at Notch Position 39 ...................................9 5-2  Operating Limit Minimum Critical Power Ratio (OLMCPR) for ATRIUM-10 and GNF2 Fuel ......................10 5-3  Power-Dependent MCPR Multipliers (Kp) for ATRIUM -10 and GNF2 Fuel, DLO and SLO, BOC to EOC, Option A and Option B .................................................................................................................................11 5-4  DLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM -10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B ................................................................................................12 5-5  SLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B ................................................................................................12 6-1  LHGR Limit for GNF2 Fuel .......................................................................................................................... 13 6-2  LHGR Limit for ATRIUM-10 Fuel ................................................................................................................. 13 6-3  Power-Dependent LHGR Multipliers (LHGRFACP) for ATRIUM-10 and GNF2 Fuel, DLO and SLO, BOC to EOC ......................................................................................................................................................... 14 6-4  Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM -10 and GNF2 Fuel, BOC to EOC, Pressurization (1 TCV/TSV Closed or OOS), All Application Groups .........................................................15 6-5  Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM -10 and GNF2 Fuel, BOC to EOC, No Pressurization (All TCV/TSV In-Service), All Application Groups .......................................................... 15 7-1  Rod Block Monitor Setpoints .......................................................................................................................16 9-1  OPRM PBDA Trip Setpoints ........................................................................................................................ 18 10-1  Allowed Modes of Operation and EOOS Combinations ..............................................................................19
-10 and GNF2 Fuel, BOC to EOC, Pressurization (1 TCV/TSV Closed or OOS), All Application Groups .........................................................15 6-5Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM
 
-10 and GNF2 Fuel, BOC to EOC, No Pressurization (All TCV/TSV In-Service), All Application Groups
COLR LaSalle 1 Revision 14                               Page 4 of 20
..........................................................
: 1. References 1.
15 7-1Rod Block Monitor Setpoints .......................................................................................................................16 9-1OPRM PBDA Trip Setpoints
Exelon Generation  Company, LLC Docket No. 50-373 LaSalle County Station, Unit 1, License No. NPF-1 1.
........................................................................................................................
: 2. NRC Letter from D. M. Crutchfield to All Power Reactor Licensees and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Tech Specs, October 3, 1988.
18 10-1Allowed Modes of Operation and EOOS Combinations ..............................................................................19 COLR LaSalle 1 Revision 14 Page 4 of 20 1.References 1.
: 3. Nuclear Fuels Letter NFM:MW:01-0106, from A. Giancatarino to J. Nugent, "LaSalle Unit 1 and Unit 2 Rod Block Monitor COLR Setpoint Change," April 3, 2001.
2.NRC Letter from D. M. Crutchfield to All Power Reactor Licensees and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Tech Specs, October 3, 1988.
: 4. GE Nuclear Energy Report NEDC-32694P-A, Revision 0, "Power Distribution Uncertainties for Safety Limit MCPR Evaluations," August 1999.
3.Nuclear Fuels Letter NFM:MW:01-0106, from A. Giancatarino to J. Nugent, "LaSalle Unit 1 and Unit 2 Rod Block Monitor COLR Setpoint Change," April 3, 2001.
: 5. GE Nuclear Energy Document GE-NE-A1300384-07-01, Revision 1, "LaSalle County Station Power Uprate Project Task 201: Reactor Power/Flow Map", September 1999.
4.GE Nuclear Energy Report NEDC-32694P-A, Revision 0, "Power Distribution Uncertainties for Safety Limit MCPR Evaluations," August 1999.
: 6. GE Hitachi Nuclear Energy Report, GE-NE-0000-0099-8344-R1, Revision 1, "Exelon Nuclear LaSalle Units 1 and 2 Thermal Power Optimization Task T0201: Operating Power/Flow Map", November 2009.
5.GE Nuclear Energy Document GE-NE-A1300384-07-01, Revision 1, "LaSalle County Station Power Uprate Project Task 201: Reactor Power/Flow Map", September 1999.
: 7. GNF Report 000N0801-SRLR, Revision 1, "Supplemental Reload Licensing Report for LaSalle Unit 1 Reload 15 Cycle 16," January 2014.
6.GE Hitachi Nuclear Energy Report, GE-NE-0000-0099-8344-R1, Revision 1, "Exelon Nuclear LaSalle Units 1 and 2 Thermal Power Optimization Task T0201: Operating Power/Flow Map", November 2009.
: 8. GNF Letter from B. R. Moore to Document Control Desk,  
7.GNF Report 000N0801-SRLR, Revision 1, "Supplemental Reload Licensing Report for LaSalle Unit 1 Reload 15 Cycle 16," January 2014.
8.GNF Letter from B. R. Moore to Document Control Desk,  


==Subject:==
==Subject:==
  "GNF2 Advantage Generic Compliance with NEDE-2401 1-P-A (GESTAR II), NEDC-33270P, Revision 5, May 2013," MFN 13-029, May 24, 2013 (ADAMS Accession No. ML13148A318) 9.AREVA Report ANP-2914(P), Revision 1, "Mechanical Design Report for LaSalle Units 1 and 2 MUR ATRIUM-10 Fuel Assemblies," AREVA NP Inc., June 2010.
  "GNF2 Advantage Generic Compliance with NEDE-2401 1-P-A (GESTAR II), NEDC-33270P, Revision 5, May 2013," MFN 13-029, May 24, 2013 (ADAMS Accession No. ML13148A318)
10.Exelon Transmittal ES1300014, Revision 0, "LaSalle Unit 1 Cycle 16 Final Resolved OPL-3 Parameters," August 21, 2013.
: 9. AREVA Report ANP-2914(P), Revision 1, "Mechanical Design Report for LaSalle Units 1 and 2 MUR ATRIUM-10 Fuel Assemblies," AREVA NP Inc., June 2010.
11.GNF DRF A12-00038
: 10. Exelon Transmittal ES1300014, Revision 0, "LaSalle Unit 1 Cycle 16 Final Resolved OPL-3 Parameters,"
-3, Vol. 4,"Scram Times Verses Notch Position," G. A. Watford, May 22, 1992.
August 21, 2013.
12.GEH Nuclear Energy DRF Section 0000-0151-0765 Rev. 0, "Application of SLO MCPR", 2/12/13.
: 11. GNF DRF A12-00038-3, Vol. 4, "Scram Times Verses Notch Position," G. A. Watford, May 22, 1992.
COLR LaSalle 1 Revision 14 Page 5 of 20
: 12. GEH Nuclear Energy DRF Section 0000-0151-0765 Rev. 0, "Application of SLO MCPR", 2/12/13.
: 2. Terms and Definitions ARTS ATRM10 BOC BWR CFR COLR CRD DLO ELLLA EOC EOOS EOR16 FFWTR FWHOOS GNF ICF Kp L1C16 LHGR LHGRFACF LHGRFACP LPRM MAPLHGR MCPR MCPRF MELLLA MOC MSIVOOS OLMCPR OOS OPRM PBDA PLUOOS PROOS RPTOOS RWE SLMCPR SLO SRVOOS TBV TBVOOS TCV TCVSC TIP TIPOOS TSV 3DM Average Power Range Monitor, Rod Block Monitor and Technical Specification Improvement Program AREVA ATRIUM-10 fuel type Beginning of cycle Boiling water reactor Code of Federal Regulations Core operating limits report Control rod drive mechanism Dual loop operation Extended load line limit analysis End of cycle Equipment out of service End of rated operation for Cycle 16 Final feedwater temperature reduction Feedwater heater out of service Global Nuclear Fuels -
 
Americas Increased core flow Power-dependent MCPR Multiplier LaSalle Unit 1 Cycle 16 Linear heat generation rate Flow-dependent LHGR multiplier Power-dependent LHGR multiplier Local power range monitor Maximum average planar linear heat generation rate Minimum critical power ratio Flow-dependent MCPR Maximum extended load line limit analysis Middle of Cycle Point for Licensing Purposes Main steam isolation valve out of service Operating limit minimum critical power ratio Out of service Oscillation power range monitor Period based detection algorithm Power load unbalance out of service Pressure regulator out of service Recirculation pump trip out of service Rod withdrawal error Safety limit minimum critical power ratio Single loop operation Safety-relief valve out of service Turbine bypass valve Turbine bypass valve out of service Turbine control valve Turbine control valve slow closure Traversing in-core probe Traversing in-core probe out of service Turbine stop valve 3-D Monicore COLR LaSalle 1 Revision 14 Page 6 of 20
COLR LaSalle 1 Revision 14                           Page 5 of 20
: 2. Terms and Definitions ARTS       Average Power Range Monitor, Rod Block Monitor and Technical Specification Improvement Program ATRM10      AREVA ATRIUM-10 fuel type BOC        Beginning of cycle BWR        Boiling water reactor CFR        Code of Federal Regulations COLR        Core operating limits report CRD        Control rod drive mechanism DLO        Dual loop operation ELLLA      Extended load line limit analysis EOC        End of cycle EOOS        Equipment out of service EOR16      End of rated operation for Cycle 16 FFWTR      Final feedwater temperature reduction FWHOOS      Feedwater heater out of service GNF        Global Nuclear Fuels - Americas ICF        Increased core flow Kp          Power-dependent MCPR Multiplier L1C16      LaSalle Unit 1 Cycle 16 LHGR        Linear heat generation rate LHGRFACF    Flow-dependent LHGR multiplier LHGRFACP    Power-dependent LHGR multiplier LPRM        Local power range monitor MAPLHGR    Maximum average planar linear heat generation rate MCPR        Minimum critical power ratio MCPRF      Flow-dependent MCPR MELLLA      Maximum extended load line limit analysis MOC        Middle of Cycle Point for Licensing Purposes MSIVOOS    Main steam isolation valve out of service OLMCPR      Operating limit minimum critical power ratio OOS        Out of service OPRM        Oscillation power range monitor PBDA        Period based detection algorithm PLUOOS      Power load unbalance out of service PROOS      Pressure regulator out of service RPTOOS      Recirculation pump trip out of service RWE        Rod withdrawal error SLMCPR      Safety limit minimum critical power ratio SLO        Single loop operation SRVOOS      Safety-relief valve out of service TBV        Turbine bypass valve TBVOOS      Turbine bypass valve out of service TCV        Turbine control valve TCVSC      Turbine control valve slow closure TIP        Traversing in-core probe TIPOOS      Traversing in-core probe out of service TSV        Turbine stop valve 3DM        3-D Monicore
 
COLR LaSalle 1 Revision 14                                   Page 6 of 20
: 3. General Information Power and flow dependent limits are listed for various power and flow levels. Linear interpolation is to be used to find intermediate values.
: 3. General Information Power and flow dependent limits are listed for various power and flow levels. Linear interpolation is to be used to find intermediate values.
Rated core flow is 108.5 Mlbm/hr. Operation up to 105% rated flow is licensed for this cycle. Licensed rated thermal power is 3546 MWth.
Rated core flow is 108.5 Mlbm/hr. Operation up to 105% rated flow is licensed for this cycle. Licensed rated thermal power is 3546 MWth.
Line 75: Line 78:
The term (EOR - 3715 MWd/ST) means the FOR exposure minus 3715 MWd/ST of exposure. The value of the FOR exposure is based on actual plant operation and is thus determined from projections to this condition made near, but before, the time when the EOR16 - 3715 MWd/ST exposure will be reached. For cycle exposure dependent limits at the exact MOC exposure, the more limiting of the BOC to MOC and the MOC to EOC limits should be used. This can be achieved by applying the MOC to EOC limits to the MOC point as all cycle exposure dependent limits in the MOC to EOC limit sets are the same as, or more limiting than, those in the BOC to MOC limit sets.
The term (EOR - 3715 MWd/ST) means the FOR exposure minus 3715 MWd/ST of exposure. The value of the FOR exposure is based on actual plant operation and is thus determined from projections to this condition made near, but before, the time when the EOR16 - 3715 MWd/ST exposure will be reached. For cycle exposure dependent limits at the exact MOC exposure, the more limiting of the BOC to MOC and the MOC to EOC limits should be used. This can be achieved by applying the MOC to EOC limits to the MOC point as all cycle exposure dependent limits in the MOC to EOC limit sets are the same as, or more limiting than, those in the BOC to MOC limit sets.
Table 3-1 Cycle Exposure Range Definitions (Reference 7):
Table 3-1 Cycle Exposure Range Definitions (Reference 7):
Nomenclature Cycle Exposure Range BOC to MOC BOC16 to (EOR16 - 3715 MWd/ST)
Nomenclature                               Cycle Exposure Range BOC to MOC                         BOC16 to (EOR16 - 3715 MWd/ST)
MOC to EOC (EOR16 - 3715 MWd/ST) to EOC16 BOC to EOC BOC16 to EOC16 COLR LaSalle 1 Revision 14 Page 7 of 20
MOC to EOC                         (EOR16 - 3715 MWd/ST) to EOC16 BOC to EOC                                     BOC16 to EOC16
: 4. Average Planar Linear Heat Generation Rate Technical Specification Sections 3.2.1 and 3.4.1 The MAPLHGR values for the most limiting lattice of each fuel type as a function of average planar exposure aregiven in Tables 4-1 and 4-2. During single loop operation, these limits are multiplied by the fuel-dependent SLO multiplier listed in Table 4-3. The MAPLHGR values in Tables 4-1 and 4-2 along with the MAPLHGR SLO multipliers in Table 4-3 provide coverage for all modes of operation.Table 4-1 MAPLHGR for GNF2 Fuel (Reference 7)
 
Avg. Planar MAPLHGR Exposure (kW/FT)GWd/ST 0.00 13.78 17.15 13.78 60.78 6.87 63.50 5.50 Table 4-2 MAPLHGR for ATRIUM-10 Fuel (Reference 7)
COLR LaSalle 1 Revision 14                                 Page 7 of 20
Avg. Planar Exposure GWd/ST MAPLHGR (kW/FT)0 12.81 21.41 12.81 55.42 9.10 63.86 7.30 Table 4-3 MAPLHGR SLO Multiplier for GNF2 and ATRIUM
: 4. Average Planar Linear Heat Generation Rate Technical Specification Sections 3.2.1 and 3.4.1 The MAPLHGR values for the most limiting lattice of each fuel type as a function of average planar exposure are given in Tables 4-1 and 4-2. During single loop operation, these limits are multiplied by the fuel-dependent SLO multiplier listed in Table 4-3. The MAPLHGR values in Tables 4-1 and 4-2 along with the MAPLHGR SLO multipliers in Table 4-3 provide coverage for all modes of operation.
-10 Fuel, BOC to EOC (Reference 7)
Table 4-1 MAPLHGR for GNF2 Fuel (Reference 7)
SLO Fuel Type MAPLHGR Multi p lier GNF2 0.78 ATRIUM-10 0.78 COLR LaSalle 1 Revision 14 Page 8 of 20
Avg. Planar MAPLHGR Exposure (kW/FT)
: 5. Operating Limit Minimum Critical Power Ratio Technical Specification Sections 3.2.2, 3.3.4.1, 3.4.1, and 3.7.7 5.1.Manual Flow Control MCPR Limits The steady-state OLMCPRs given in Table 5-2 are the maximum values obtained from analysis of the pressurization events, non-pressurization events, and the Option III stability evaluation.
GWd/ST 0.00             13.78 17.15             13.78 60.78             6.87 63.50               5.50 Table 4-2 MAPLHGR for ATRIUM-10 Fuel (Reference 7)
MCPR values are determined by the cycle-specific fuel reload analyses in Reference 7. Table 5-2 is used in conjunction with the ARTS-based power (Kp) and flow (MCPRF) dependencies presented in Tables 5-3, 5-4, and 5-5 below. The OLMCPR is determined for a given power and flow condition by evaluating the power and flow dependent MCPR values and selecting the greater of the two.
Avg. Planar MAPLHGR Exposure (kW/FT)
5.1.1.Power-Dependent MCPR The power-dependent MCPR multiplier, Kp, is determined from Table 5-3, and is dependent only on the power level and the Application Group (EOOS). The product of the steady state OLMCPR and the proper KQ provides the power-dependent OLMCPR.
GWd/ST 0               12.81 21.41             12.81 55.42               9.10 63.86               7.30 Table 4 -3 MAPLHGR SLO Multiplier for GNF2 and ATRIUM -10 Fuel, BOC to EOC (Reference 7)
5.1.2. Flow
SLO Fuel Type         MAPLHGR Multiplier GNF2               0.78 ATRIUM-10             0.78
-Dependent MCPR Tables 5-4 through 5-5 give the MCPRF limit as a function of the core flow, based on the applicable plant conditions. The MCPRF limit determined from these tables is the flow-dependent OLMCPR.5.2.Scram Time Option A and Option B MCPR analyses and results are dependent upon core average control rod blade scram speed insertion times.
 
COLR LaSalle 1 Revision 14                                   Page 8 of 20
: 5. Operating Limit Minimum Critical Power Ratio Technical Specification Sections 3.2.2, 3.3.4.1, 3.4.1, and 3.7.7 5.1. Manual Flow Control MCPR Limits The steady-state OLMCPRs given in Table 5-2 are the maximum values obtained from analysis of the pressurization events, non-pressurization events, and the Option III stability evaluation. MCPR values are determined by the cycle-specific fuel reload analyses in Reference 7. Table 5-2 is used in conjunction with the ARTS-based power (Kp) and flow (MCPRF) dependencies presented in Tables 5-3, 5-4, and 5-5 below. The OLMCPR is determined for a given power and flow condition by evaluating the power and flow dependent MCPR values and selecting the greater of the two.
5.1.1. Power-Dependent MCPR The power-dependent MCPR multiplier, Kp, is determined from Table 5-3, and is dependent only on the power level and the Application Group (EOOS). The product of the steady state OLMCPR and the proper KQ provides the power-dependent OLMCPR.
5.1.2. Flow-Dependent MCPR Tables 5-4 through 5-5 give the MCPRF limit as a function of the core flow, based on the applicable plant conditions. The MCPRF limit determined from these tables is the flow-dependent OLMCPR.
5.2. Scram Time Option A and Option B MCPR analyses and results are dependent upon core average control rod blade scram speed insertion times.
The Option A scram time is the Improved Technical Specification scram speed based insertion time. The core average scram speed insertion time for 20% insertion must be less than or equal to the Technical Specification scram speed insertion time to utilize the Option A MCPR limits. Reload analyses performed by GNF for Cycle 16 Option A MCPR limits utilized a 20% core average insertion time of 0.900 seconds (Reference 10).
The Option A scram time is the Improved Technical Specification scram speed based insertion time. The core average scram speed insertion time for 20% insertion must be less than or equal to the Technical Specification scram speed insertion time to utilize the Option A MCPR limits. Reload analyses performed by GNF for Cycle 16 Option A MCPR limits utilized a 20% core average insertion time of 0.900 seconds (Reference 10).
To utilize the MCPR limits for the Option B scram speed insertion times, the core average scram speed insertion time for 20% insertion must be less than or equal to 0.694 seconds (Reference 10) (0.672 seconds at notch position 39, Reference 11). See Table 5-1 for a summary of scram time requirements related to the use of Option A and Option B MCPR limits.
To utilize the MCPR limits for the Option B scram speed insertion times, the core average scram speed insertion time for 20% insertion must be less than or equal to 0.694 seconds (Reference 10) (0.672 seconds at notch position 39, Reference 11). See Table 5-1 for a summary of scram time requirements related to the use of Option A and Option B MCPR limits.
If the core average scram insertion time does not meet the Option B criteria, but is within the Option A criteria, the appropriate steady state MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places.
If the core average scram insertion time does not meet the Option B criteria, but is within the Option A criteria, the appropriate steady state MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. When performing the linear interpolation to determine MCPR limits, ensure that the time used for Option A is 0.900 seconds (0.875 seconds to notch position 39, Reference 11). Note that making interpolations using the Table 5-2 data is conservative because the stability based OLMCPR sets the limit in many conditions. The Option A to Option B linear interpolation need not include the stability OLMCPR penalty on the endpoints when the calculation is made. However, the result of the linear interpolation is required to be 1.51 or greater for the steady state OLMCPR due to the OPRM PBDA setpoint (see Section 9 of the COLR and Reference 7).
When performing the linear interpolation to determine MCPR limits, ensure that the time used for Option A is 0.900 seconds (0.875 seconds to notch position 39, Reference 11). Note that making interpolations using the Table 5-2 data is conservative because the stability based OLMCPR sets the limit in many conditions. The Option A to Option B linear interpolation need not include the stability OLMCPR penalty on the endpoints when the calculation is made. However, the result of the linear interpolation is required to be 1.51 or greater for the steady state OLMCPR due to the OPRM PBDA setpoint (see Section 9 of the COLR and Reference 7).
 
COLR LaSalle 1 Revision 14 Page 9 of 20 Table 5-1 Scram Times Required for Option A and Option B Application at Notch Position 39 (References 10 and 11)
COLR LaSalle 1 Revision 14                                 Page 9 of 20 Table 5-1 Scram Times Required for Option A and Option B Application at Notch Position 39 (References 10 and 11)
Notch Position*Scram Time Required for Option A Application Scram Time Required for Option B Application 39<_ 0.875 sec.
Notch           Scram Time Required for Option A               Scram Time Required for Option B Position*                    Application                                    Application 39                         <_ 0.875 sec.                                 <_ 0.672 sec.
<_ 0.672 sec.
* - The insertion time to a notch position is conservatively calculated using the CRD reed switch drop-out time per Reference 11.
* - The insertion time to a notch position is conservatively calculated using the CRD reed switch drop-out time per Reference 11.
5.3.Recirculation Flow Control Valve Settings Cycle 16 was analyzed with a maximum core flow runout of 105%; therefore the recirculation pump flow control valves must be set to maintain core flow less than 105% (113.925 Mlbm/hr) for all runout events.
5.3. Recirculation Flow Control Valve Settings Cycle 16 was analyzed with a maximum core flow runout of 105%; therefore the recirculation pump flow control valves must be set to maintain core flow less than 105% (113.925 Mlbm/hr) for all runout events.
COLR LaSalle 1 Revision 14 Page 10 of 20Table 5-2 Operating Limit Minimum Critical Power Ratio (OLMCPR) for ATRIUM-10 and GNF2 Fuel (Reference 7)
 
A li ti G DLO/Exposure O p tion A O p tion B pp ca on roup SLO Ran g e GNF2 ATRMIO GNF2 ATRMIO BOC-MOC 1.51 1.51 1.51 1.51 B C DLO ase ase MOC-EOC 1.61 1.53 1.56 1.51 BOC-MOC 1.56 1.51 1.56 1.51 B C SLO ase ase MOC-EOC 1.63 1.55 1.58 1.52 BOC-MOC 1.58 1.56 1.51 1.51 Base Case+ TCVSC DLO+ RPTOOS + PRODS MOC-EOC 1.69 1.70 1.59 1.53 BOC-MOC 1.60 1.58 1.56 1.51 Base Case+ TCVSC+ RPTOOS + PRODS SLO MOC-EOC 1.71 1.72 1.61 1.55 BOC-MOC 1.53 1.51 1.51 1.51 Base Case + TCVSC +
COLR LaSalle 1 Revision 14                             Page 10 of 20 Table 5-2 Operating Limit Minimum Critical Power Ratio (OLMCPR) for ATRIUM-10 and GNF2 Fuel (Reference 7)
DLO/   Exposure             O ption A       O ption B A pp li cati on G roup SLO     Ran ge          GNF2 ATRMIO     GNF2     ATRMIO BOC-MOC             1.51       1.51 1.51       1.51 B ase C ase      DLO MOC-EOC             1.61       1.53 1.56       1.51 BOC-MOC             1.56       1.51 1.56       1.51 B ase C ase      SLO MOC-EOC             1.63       1.55 1.58       1.52 BOC-MOC             1.58       1.56 1.51       1.51 Base Case + TCVSC DLO
      + RPTOOS + PRODS MOC-EOC           1.69       1.70 1.59       1.53 BOC-MOC           1.60       1.58 1.56       1.51 Base Case + TCVSC SLO
      + RPTOOS + PRODS MOC-EOC           1.71       1.72 1.61       1.55 BOC-MOC           1.53       1.51 1.51       1.51 Base Case + TCVSC +
DLO TBVOOS (all 5 valves)
DLO TBVOOS (all 5 valves)
MOC-EOC 1.65 1.56 1.60 1.53 BOC-MOC 1.56 1.51 1.56 1.51 Base Case + TCVSC +
MOC-EOC           1.65       1.56 1.60       1.53 BOC-MOC           1.56       1.51 1.56       1.51 Base Case + TCVSC +
TBVOOS (all 5 valves)
SLO TBVOOS (all 5 valves)
SLO MOC-EOC 1.67 1.58 1.62 1.55 Base Case + TCVSC +
MOC-EOC           1.67       1.58 1.62       1.55 Base Case + TCVSC +             BOC-MOC           1.61       1.59 1.51       1.51 TBVOOS (a ll 5 va l ves) DLO
BOC-MOC 1.61 1.59 1.51 1.51 TBVOOS ll 5 l (a va ves)DLO+ RPTOOS + PROOS MOC-EOC 1.73 1.74 1.63 1.57 Base Case+ TCVSC +BOC-MOC 1.63 1.61 1.56 1.51 TBVOOS ll 5 l (a va ves)SLO+ RPTOOS + PROOS MOC-EOC 1.75 1.76 1.65 1.59 COLR LaSalle 1 Revision 14 Page 11 of 20 Table 5-3 Power-Dependent MCPR Multipliers (Kp) for ATRIUM-10 and GNF2 Fuel, DLO and SLO, BOC to EOC, Option A and Option B (Reference 7)
      + RPTOOS + PROOS               MOC-EOC           1.73       1.74 1.63       1.57 Base Case + TCVSC +             BOC-MOC           1.63       1.61 1.56       1.51 TBVOOS (a ll 5 va lves) SLO
      + RPTOOS + PROOS               MOC-EOC           1.75       1.76 1.65       1.59
 
COLR LaSalle 1 Revision 14                             Page 11 of 20 Table 5-3 Power-Dependent MCPR Multipliers (Kp) for ATRIUM-10 and GNF2 Fuel, DLO and SLO, BOC to EOC, Option A and Option B (Reference 7)
Kp, MCPR Limit Multiplier (as a function of % rated power)
Kp, MCPR Limit Multiplier (as a function of % rated power)
A lication Grou pp p 0% P 25%P 45% P 60%P 85% P 85.01%P 100% P Base Case 1.338 1.338 1.191 1.191 1.061 1.061 1.000 Base Case + TCVSC
A pp lication Grou p 0% P     25% P   45% P       60% P   85% P     85.01%P   100% P Base Case         1.338     1.338   1.191       1.191   1.061     1.061   1.000 Base Case + TCVSC
+ RPTOOS +
    + RPTOOS +         1.488     1.488   1.378       1.296   1.174     1.097   1.000 PROOS Base Case + TCVSC
1.488 1.488 1.378 1.296 1.174 1.097 1.000 PROOS Base Case + TCVSC
  + TBVOOS (all 5     1.379     1.379   1.228       1.207   1.097     1.097   1.000 valves)
+ TBVOOS (all 5 1.379 1.379 1.228 1.207 1.097 1.097 1.000 valves)Base Case + TCVSC
Base Case + TCVSC
+ TBVOOS (all 5 1.488 1.488 1.378 1.296 1.174 1 097 1 000 valves) +..RPTOOS + PROOS COLR LaSalle 1 Revision 14 Page 12 of 20 Table 5-4 DLO Flow-Dependent MCPR Limits (MCPRF)for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B (Reference 7)
  + TBVOOS (all 5 1.488     1.488   1.378       1.296   1.174     1 . 097 1 . 000 valves) +
Flow (% Rated)MCPRF 0.0 1.89 30.0 1.70 105.0 1.24 Table 5-5 SLO Flow
RPTOOS + PROOS
-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B (References 7 and 12)Flow (% Rated)MCPRF 0.0 1.91 30.0 1.72 105.0 1.26 COLR LaSalle 1 Revision 14Page 13 of 20
 
: 6. Linear Heat Generation Rate Technical Specification Sections 3.2.3 and 3.4.1 The linear heat generation rate (LHGR) limit is the product of the exposure dependent LHGR limit from Table 6-1 or Table 6-2 and the minimum of: the power dependent LHGR Factor, LHGRFACP, or the flow dependent LHGR Factor, LHGRFACF as applicable. The LHGRFACP multiplier is determined from Table 6-3. The LHGRFACF multiplier is determined from either Table 6-4 or Table 6-5. The SLO multipliers in Tables 6-4 and 6-5 have been limited to a maximum value of 0.78, the SLO LHGR multiplier for GNF2 and ATRIUM-10 fuel.Table 6-1 LHGR Limit for GNF2 Fuel (Reference 8)
COLR LaSalle 1 Revision 14                   Page 12 of 20 Table 5-4 DLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B (Reference 7)
Peak Pellet ExposureU02 LHGR Limit See Table B-1 of Reference 8 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit See Table B-2 of Reference 8Table 6-2 LHGR Limit for ATRIUM
Flow MCPRF
-10 Fuel (Reference 9)
(% Rated) 0.0               1.89 30.0               1.70 105.0               1.24 Table 5-5 SLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B (References 7 and 12)
Peak Pellet Exposure (GWd/ST)LHGR Limit (kW/ft)0.0 13.4 16.06 13.4 55.43 9.1 63.87 7.3 COLR LaSalle 1 Revision 14 Page 14 of 20 Table 6-3 Power-Dependent LHGR Multipliers (LHGRFACp) for ATRIUM-10 and GNF2 Fuel, DLO and SLO, BOC to EOC (Reference 7)
Flow MCPRF
(% Rated) 0.0               1.91 30.0               1.72 105.0               1.26
 
COLR LaSalle 1 Revision 14                                Page 13 of 20
: 6. Linear Heat Generation Rate Technical Specification Sections 3.2.3 and 3.4.1 The linear heat generation rate (LHGR) limit is the product of the exposure dependent LHGR limit from Table 6-1 or Table 6-2 and the minimum of: the power dependent LHGR Factor, LHGRFACP, or the flow dependent LHGR Factor, LHGRFACF as applicable. The LHGRFACP multiplier is determined from Table 6-3. The LHGRFACF multiplier is determined from either Table 6-4 or Table 6-5. The SLO multipliers in Tables 6-4 and 6-5 have been limited to a maximum value of 0.78, the SLO LHGR multiplier for GNF2 and ATRIUM-10 fuel.
Table 6-1 LHGR Limit for GNF2 Fuel (Reference 8)
Peak Pellet Exposure        U02 LHGR Limit See Table B-1 of Reference 8 Peak Pellet Exposure         Most Limiting Gadolinia LHGR Limit See Table B-2 of Reference 8 Table 6-2 LHGR Limit for ATRIUM-10 Fuel (Reference 9)
Peak Pellet Exposure                   LHGR Limit (GWd/ST)                           (kW/ft) 0.0                               13.4 16.06                             13.4 55.43                             9.1 63.87                             7.3
 
COLR LaSalle 1 Revision 14                         Page 14 of 20 Table 6-3 Power-Dependent LHGR Multipliers (LHGRFACp) for ATRIUM- 10 and GNF2 Fuel, DLO and SLO, BOC to EOC (Reference 7)
LHGRFACP (as a function of % rated power)
LHGRFACP (as a function of % rated power)
A lication Grou pp p 0% P 25%P 45% P 60% P 85% P 100% P Base Case 0.608 0.608 0.713 0.791 0.922 0.978 Base Case + TCVSC
A pp lication Grou p 0% P   25% P       45% P   60% P   85% P   100% P Base Case       0.608   0.608       0.713   0.791   0.922     0.978 Base Case + TCVSC
+ RPTOOS +
        + RPTOOS +       0.608   0.608       0.713   0.761   0.831     0.978 PROOS Base Case + TCVSC
0.608 0.608 0.713 0.761 0.831 0.978 PROOS Base Case + TCVSC
      + TBVOOS (all 5   0.608   0.608       0.713   0.791   0.922     0.978 valves)
+ TBVOOS (all 5 0.608 0.608 0.713 0.791 0.922 0.978 valves)Base Case + TCVSC
Base Case + TCVSC
+ TBVOOS (all 5 0.608 0.608 0 713 0 761 0 822 978 0 valves) +....RPTOOS + PROOS COLR LaSalle 1 Revision 14 Page 15 of 20 Table 6-4 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, Pressurization (1 TCV/TSV Closed or OOS), All Application Groups (Reference 7)
      + TBVOOS (all 5 0.608   0.608       0 . 713 0 . 761 0 . 822   0 . 978 valves) +
Flow (% Rated)DLO LHGRFACF SLO LHGRFACF 0.0 0.110 0.110 30.0 0.410 0.410 67.0 0.78 0.78 89.0 1.000 0.78 105.0 1.000 0.78 Table 6-5 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, No Pressurization (All TCVITSV In-Service), All Application Groups (Reference 7)
RPTOOS + PROOS
(% Flow (/&deg; Rated)
 
DLO LHGRFACF SLO LHGRFACF 0.0 0.250 0.250 30.0 0.550 0.550 53.0 0.78 0.78 75.0 1.000 0.78 105.0 1.000 0.78 COLR LaSalle 1 Revision 14 Page 16 of 20
COLR LaSalle 1 Revision 14                           Page 15 of 20 Table 6-4 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, Pressurization (1 TCV/TSV Closed or OOS), All Application Groups (Reference 7)
Flow DLO LHGRFACF                SLO LHGRFACF
(% Rated) 0.0                     0.110                       0.110 30.0                     0.410                       0.410 67.0                       0.78                       0.78 89.0                       1 .000                     0.78 105.0                     1.000                       0.78 Table 6-5 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, No Pressurization (All TCVITSV In-Service), All Application Groups (Reference 7)
(% Flow DLO LHGRFACF                SLO LHGRFACF
(/&deg; Rated) 0.0                     0.250                       0.250 30.0                     0.550                       0.550 53.0                       0.78                       0.78 75.0                     1.000                       0.78 105.0                     1.000                       0.78
 
COLR LaSalle 1 Revision 14                               Page 16 of 20
: 7. Rod Block Monitor Technical Specification Sections 3.3.2.1 and 3.4.1 The Rod Block Monitor Upscale Instrumentation Setpoints are determined from the relationships shown below (Reference 3):
: 7. Rod Block Monitor Technical Specification Sections 3.3.2.1 and 3.4.1 The Rod Block Monitor Upscale Instrumentation Setpoints are determined from the relationships shown below (Reference 3):
Table 7-1 Rod Block Monitor Setpoints Rod Block Monitor Upscale Trip Function Allowable Value Two Recirculation Loop 0.66 Wd + 54.0%
Table 7-1 Rod Block Monitor Setpoints Rod Block Monitor Upscale Trip Function                 Allowable Value Two Recirculation Loop 0.66 Wd + 54.0%
Operation Single Recirculation Loop 0.66 Wd + 48.7%
Operation Single Recirculation Loop 0.66 Wd + 48.7%
Operation The setpoint may be lower/higher and will still comply with the rod withdrawal error (RWE) analysis because RWE is analyzed unblocked. The allowable value is clamped with a maximum value not to exceed the allowable value for a recirculation loop drive flow (Wd) of 100%.
Operation The setpoint may be lower/higher and will still comply with the rod withdrawal error (RWE) analysis because RWE is analyzed unblocked. The allowable value is clamped with a maximum value not to exceed the allowable value for a recirculation loop drive flow (Wd) of 100%.
Wd - percent of recirculation loop drive flow required to produce a rated core flow of 108.5 Mlbm/hr.
Wd - percent of recirculation loop drive flow required to produce a rated core flow of 108.5 Mlbm/hr.
COLR LaSalle 1 Revision 14 Page 17 of 20 8.Traversing In-Core Probe System 8.1.Description When the traversing in-core probe (TIP) system (for the required measurement locations) is used for recalibration of the LPRM detectors and monitoring thermal limits, the TIP system shall be operable with the following:
 
1.movable detectors, drives and readout equipment to map the core in the required measurement locations, and 2.indexing equipment to allow all required detectors to be calibrated in a common location.
COLR LaSalle 1 Revision 14                                 Page 17 of 20
: 8. Traversing In-Core Probe System 8.1. Description When the traversing in-core probe (TIP) system (for the required measurement locations) is used for recalibration of the LPRM detectors and monitoring thermal limits, the TIP system shall be operable with the following:
: 1. movable detectors, drives and readout equipment to map the core in the required measurement locations, and
: 2. indexing equipment to allow all required detectors to be calibrated in a common location.
The following applies for use with 3DM (Reference 4):
The following applies for use with 3DM (Reference 4):
The total number of failed and/or bypassed LPRMs does not exceed 25%. In addition, no more than 14 TIP channels can be OOS (failed or rejected).
The total number of failed and/or bypassed LPRMs does not exceed 25%. In addition, no more than 14 TIP channels can be OOS (failed or rejected).
Otherwise, with the TIP system inoperable, suspend use of the system for the above applicable calibration functions.
Otherwise, with the TIP system inoperable, suspend use of the system for the above applicable calibration functions.
H.Z.Bases The operability of the TIP system with the above specified minimum complement of equipment ensures that the measurements obtained from use of this equipment accurately represent the spatial neutron flux distribution of the reactor core. The normalization of the required detectors is performed internal to the core monitoring software system.
H.Z. Bases The operability of the TIP system with the above specified minimum complement of equipment ensures that the measurements obtained from use of this equipment accurately represent the spatial neutron flux distribution of the reactor core. The normalization of the required detectors is performed internal to the core monitoring software system.
COLR LaSalle 1 Revision 14 Page 18 of 20 9.Stability Protection Setpoints Technical Specification Section 3.3.1.3 Table 9-1 OPRM PBDA Trip Setpoints (Reference 7)
 
PBDA Trip Amplitude Setpoint (Sp)
COLR LaSalle 1 Revision 14                             Page 18 of 20
Corresponding Maximum Confirmation Count Setpoint (Np) 1.11 14 The PBDA is the only OPRM setting credited in the safety analysis as documented in the licensing basis for the OPRM system.
: 9. Stability Protection Setpoints Technical Specification Section 3.3.1.3 Table 9 -1 OPRM PBDA Trip Setpoints (Reference 7)
The OPRM PBDA trip settings are based, in part, on the cycle specific OLMCPR and the power dependent MCPR limits.
Corresponding Maximum PBDA Trip Amplitude Setpoint (Sp)
Any change to the OLMCPR values and/or the power dependent MCPR limits should be evaluated for potential impact on the OPRM PBDA trip settings.
Confirmation Count Setpoint (Np) 1.11                                             14 The PBDA is the only OPRM setting credited in the safety analysis as documented in the licensing basis for the OPRM system.
The OPRM PBDA trip settings are based, in part, on the cycle specific OLMCPR and the power dependent MCPR limits. Any change to the OLMCPR values and/or the power dependent MCPR limits should be evaluated for potential impact on the OPRM PBDA trip settings.
The OPRM PBDA trip settings are applicable when the OPRM system is declared operable, and the associated Technical Specifications are implemented.
The OPRM PBDA trip settings are applicable when the OPRM system is declared operable, and the associated Technical Specifications are implemented.
COLR LaSalle 1 Revision 14 Page 19 of 20
 
COLR LaSalle 1 Revision 14                                     Page 19 of 20
: 10. Modes of Operation The allowed modes of operation with combinations of equipment out-of-service are as described below (Reference 7).
: 10. Modes of Operation The allowed modes of operation with combinations of equipment out-of-service are as described below (Reference 7).
Table 10-1 Allowed Modes of Operation and EOOS Combinations (Reference 7)
Table 10-1 Allowed Modes of Operation and EOOS Combinations (Reference 7)
Equipment Out of Service Options (1) (2)(4)(5)Short Name Base Case (Option A or B)
(1) (2) (4) (5)
(3)Base Base Case+ SLO (Option A or B)
Equipment Out of Service Options                                                Short Name (3)                                                                    Base Base Case (Option A or B)
Base SLO Base Case+ TCVSC + RPTOOS + PROOS (Option A or B)
Base Case + SLO (Option A or B)                                                                       Base SLO Base Case + TCVSC + RPTOOS + PROOS (Option A or B)                                               Combined EOOS 1 Base Case + TCVSC + RPTOOS + PROOS + SLO (Option A or B)                                     Combined EOOS 1 SLO Base Case + TCVSC + TBVOOS (all 5 valves) (Option A or B)                                         Combined EOOS 2 Base Case + TCVSC + TBVOOS (all 5 valves) + SLO (Option A or B)                               Combined EOOS 2 SLO Base Case + TCVSC + TBVOOS (all 5 valves) + RPTOOS + PROOS Combined EOOS 3 (Option A or B)
Combined EOOS 1 Base Case + TCVSC + RPTOOS + PROOS + SLO (Option A or B)
Base Case + TCVSC + TBVOOS (all 5 valves) + RPTOOS + PROOS + SLO Combined EOOS 3 SLO (Option A or B)
Combined EOOS 1 SLO Base Case + TCVSC + TBVOOS (all 5 valves)(Option A or B)
(1) Base case includes I SRVOOS + 1 TCVITSV OOS + FWHOOS/FFWTR + 1 MSIVOOS + 2 TBVOOS + PLUOOS, and also includes 1 TIPOOS (up to 14 TIP channels not available) any time during the cycle, including BOC, and up to 25% of the LPRMs out-of-service. The FWHOOS/FFWTR analyses cover a maximum reduction of 100&deg;F for the feedwater temperature.
Combined EOOS 2 Base Case + TCVSC + TBVOOS (all 5 valves)
+ SLO (Option A or B)
Combined EOOS 2 SLO Base Case + TCVSC + TBVOOS (all 5 valves) + RPTOOS + PROOS (Option A or B)
Combined EOOS 3 Base Case+ TCVSC + TBVOOS (all 5 valves) + RPTOOS + PROOS + SLO (Option A or B)
Combined EOOS 3 SLO (1)Base case includes I SRVOOS + 1 TCVITSV OOS + FWHOOS/FFWTR + 1 MSIVOOS + 2 TBVOOS + PLUOOS, and also includes 1 TIPOOS (up to 14 TIP channels not available) any time during the cycle, including BOC, and up to 25% of the LPRMs out-of-service. The FWHOOS/FFWTR analyses cover a maximum reduction of 100&deg;F for the feedwater temperature.
A nominal LPRM calibration interval of 2000 EFPH (2500 EFPH maximum) is supported for L1C16.
A nominal LPRM calibration interval of 2000 EFPH (2500 EFPH maximum) is supported for L1C16.
(2)TBVOOS (all 5 valves) is the turbine bypass system out of service which means that 5 TBVs are not credited for fast opening and 3 TBVs are not credited to open in pressure control. For the 2 TBVOOS condition that is a part of the base case, the assumption is that both of the TBVs do not open on any signal and thus remain shut for the transients analyzed (i.e. 3 TBVs are credited to open in pressure control). The MCFL is currently set at 126.6 and will only allow opening of TBV's #1,#2, #3, and #4 during a slow pressurization event. The MCFL does not use the TBV position feedback signal to know how many TBVs have opened or how far each has opened. The #5 TBV is not available based on the current MCFL setpoint and thus cannot be used as one of the credited valves to open in pressure control.
(2) TBVOOS (all 5 valves) is the turbine bypass system out of service which means that 5 TBVs are not credited for fast opening and 3 TBVs are not credited to open in pressure control. For the 2 TBVOOS condition that is a part of the base case, the assumption is that both of the TBVs do not open on any signal and thus remain shut for the transients analyzed (i.e. 3 TBVs are credited to open in pressure control). The MCFL is currently set at 126.6 and will only allow opening of TBV's #1,
(3)With all TCVITSV In-Service, the Base Case should be used with the LHGRFACF values from Table 6
#2, #3, and #4 during a slow pressurization event. The MCFL does not use the TBV position feedback signal to know how many TBVs have opened or how far each has opened. The #5 TBV is not available based on the current MCFL setpoint and thus cannot be used as one of the credited valves to open in pressure control.
-5 (Reference 7).
(3) With all TCVITSV In- Service, the Base Case should be used with the LHGRFACF values from Table 6 -5 (Reference 7).
With 1 TCV/TSV OOS, the Base Case must be used with the LHGRFACF values from Table 6-4. The one Stuck Closed TCV and/or TSV EOOS conditions require power levels 85% of rated. The one MSIVOOS condition is also supported as long as thermal power is maintained 5 75% of the rated.
With 1 TCV/TSV OOS, the Base Case must be used with the LHGRFACF values from Table 6-4. The one Stuck Closed TCV and/or TSV EOOS conditions require power levels 85% of rated. The one MSIVOOS condition is also supported as long as thermal power is maintained 5 75% of the rated.
(4)The + sign that is used in the Equipment Out of Service Option / Application Group descriptions designates an "and/or".
(4) The + sign that is used in the Equipment Out of Service Option / Application Group descriptions designates an "and/or".
(5)All EOOS Options (Reference 7 Application Groups) are applicable to ELLLA, MELLLA, ICF and Coastdown realms of operation with the exception that SLO is not applicable to MELLLA or ICF (References 5 and 6). The MOC to EOC exposure range limit sets are generated by GNF to include application to coastdown operation (Methodology Reference 5).
(5) All EOOS Options (Reference 7 Application Groups) are applicable to ELLLA, MELLLA, ICF and Coastdown realms of operation with the exception that SLO is not applicable to MELLLA or ICF (References 5 and 6). The MOC to EOC exposure range limit sets are generated by GNF to include application to coastdown operation (Methodology Reference 5).
COLR LaSalle 1 Revision 14 Page 20 of 20
 
COLR LaSalle 1 Revision 14                                 Page 20 of 20
: 11. Methodology The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
: 11. Methodology The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1.XN-NF-81-58 (P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," March 1984.
: 1. XN-NF-81-58 (P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," March 1984.
2.ANF-89-98 (P)(A), Revision 1 and Revision 1 Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," May 1995.
: 2. ANF-89-98 (P)(A), Revision 1 and Revision 1 Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," May 1995.
3.EMF-85-74 (P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," February 1998.
: 3. EMF-85-74 (P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," February 1998.
4.XN-NF-85-67 (P)(A) Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," September 1986.
: 4. XN-NF-85-67 (P)(A) Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel,"
5.N EDE-2401 1 -P-A-20 (Revision 20), "General Electric Standard Application for Reactor Fuel," December 2013 and the U.S. Supplement NEDE-2401 1 -P-A-20-US, of December 2013.
September 1986.
6.NEDC-33106P-A Revision 2, "GEXL97 Correlation for ATRIUM-10 Fuel," June 2004.
: 5. N EDE-2401 1 -P-A-20 (Revision 20), "General Electric Standard Application for Reactor Fuel," December 2013 and the U.S. Supplement NEDE-2401 1 -P-A-20-US, of December 2013.
7.NEDO-32465-A, "BWR Owner's Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.}}
: 6. NEDC-33106P-A Revision 2, "GEXL97 Correlation for ATRIUM-10 Fuel," June 2004.
: 7. NEDO-32465-A, "BWR Owner's Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.}}

Latest revision as of 09:00, 4 November 2019

Cycle 16 Core Operating Limits Report (COLR)
ML14051A818
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 02/20/2014
From: Karaba P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA14-011
Download: ML14051A818 (22)


Text

RA 14-011 10 CFR 50.59 February 20, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Unit 1 Facility Operating License No. NPF-1 1 NRC Docket No. 50-373

Subject:

Unit 1 Cycle 16 Core Operating Limits Report (COLR)

The purpose of this letter is to advise you of the Exelon Generation Company, LLC (EGC) review and approval of the LaSalle Unit 1 Cycle 16 reload licensing analyses under the provisions of 10 CFR 50.59, "Changes, tests and experiments," and to transmit Revision 0 of the Core Operating Limits Report (COLR) for Cycle 16, consistent with Generic Letter 88-16, "Removal of Cycle-Specific Parameter Limits From Technical Specifications." This report is being submitted in accordance with LaSalle County Station Technical Specifications (TS) 5.6.5, "Core Operating Limits Report (COLR)," item d.

The reload licensing analyses performed for Cycle 16 utilized NRC approved methodologies.

The Unit 1 Cycle 16 core, which consists of NRC approved fuel designs developed by AREVA NP Inc. and Global Nuclear Fuel - Americas, LLC (GNF-A) was designed to operate within approved fuel design criteria provided in the TS and related TS Bases.

EGC has performed a review of the relevant reload licensing documents, associated TS Bases, and references in accordance with 10 CFR 50.59. This review concluded that the reload licensing analyses does not require NRC review and approval.

February 20, 2014 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this submittal, please contact Mr. Guy V. Ford, Jr.,

Regulatory Assurance Manager, at (815) 415-2800.

Respectfully, Peter J. Karaba Site Vice President LaSalle County Station

Attachment:

Core Operating Limits Report for LaSalle Unit 1 Cycle 16, Revision 0 cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station

COLR LaSalle 1 Revision 14 Page 1 of 20 Core Operating Limits Report for LaSalle Unit I Cycle 16 Revision 0

COLR LaSalle 1 Revision 14 Page 2 of 20 Table of Contents

1. References ......................................................................................................................................4
2. Terms and Definitions ......................................................................................................................5
3. General Information .........................................................................................................................6
4. Average Planar Linear Heat Generation Rate ..................................................................................7
5. Operating Limit Minimum Critical Power Ratio ................................................................................. 8 5.1. Manual Flow Control MCPR Limits ...........................................................................................8 5.1.1. Power-Dependent MCPR ...................................................................................................8 5.1.2. Flow-Dependent MCPR ......................................................................................................8 5.2. Scram Time ..............................................................................................................................8 5.3. Recirculation Flow Control Valve Settings ................................................................................. 9
6. Linear Heat Generation Rate .........................................................................................................13
7. Rod Block Monitor .........................................................................................................................16
8. Traversing In-Core Probe System .................................................................................................17 8.1. Description ..............................................................................................................................17 8.2. Bases .....................................................................................................................................17
9. Stability Protection Setpoints ........................................................................................................18
10. Modes of Operation .....................................................................................................................19
11. Methodology ................................................................................................................................20

COLR LaSalle 1 Revision 14 Page 3 of 20 List of Tables 3-1 Cycle Exposure Range Definitions ................................................................................................................ 6 4-1 MAPLHGR for GNF2 Fuel .............................................................................................................................7 4-2 MAPLHGR for ATRIUM -10 Fuel ....................................................................................................................7 4-3 MAPLHGR SLO Multiplier for GNF2 and ATRIUM-10 Fuel, BOC to EOC ...................................................7 5-1 Scram Times Required for Option A and Option B Application at Notch Position 39 ...................................9 5-2 Operating Limit Minimum Critical Power Ratio (OLMCPR) for ATRIUM-10 and GNF2 Fuel ......................10 5-3 Power-Dependent MCPR Multipliers (Kp) for ATRIUM -10 and GNF2 Fuel, DLO and SLO, BOC to EOC, Option A and Option B .................................................................................................................................11 5-4 DLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM -10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B ................................................................................................12 5-5 SLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B ................................................................................................12 6-1 LHGR Limit for GNF2 Fuel .......................................................................................................................... 13 6-2 LHGR Limit for ATRIUM-10 Fuel ................................................................................................................. 13 6-3 Power-Dependent LHGR Multipliers (LHGRFACP) for ATRIUM-10 and GNF2 Fuel, DLO and SLO, BOC to EOC ......................................................................................................................................................... 14 6-4 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM -10 and GNF2 Fuel, BOC to EOC, Pressurization (1 TCV/TSV Closed or OOS), All Application Groups .........................................................15 6-5 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM -10 and GNF2 Fuel, BOC to EOC, No Pressurization (All TCV/TSV In-Service), All Application Groups .......................................................... 15 7-1 Rod Block Monitor Setpoints .......................................................................................................................16 9-1 OPRM PBDA Trip Setpoints ........................................................................................................................ 18 10-1 Allowed Modes of Operation and EOOS Combinations ..............................................................................19

COLR LaSalle 1 Revision 14 Page 4 of 20

1. References 1.

Exelon Generation Company, LLC Docket No. 50-373 LaSalle County Station, Unit 1, License No. NPF-1 1.

2. NRC Letter from D. M. Crutchfield to All Power Reactor Licensees and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Tech Specs, October 3, 1988.
3. Nuclear Fuels Letter NFM:MW:01-0106, from A. Giancatarino to J. Nugent, "LaSalle Unit 1 and Unit 2 Rod Block Monitor COLR Setpoint Change," April 3, 2001.
4. GE Nuclear Energy Report NEDC-32694P-A, Revision 0, "Power Distribution Uncertainties for Safety Limit MCPR Evaluations," August 1999.
5. GE Nuclear Energy Document GE-NE-A1300384-07-01, Revision 1, "LaSalle County Station Power Uprate Project Task 201: Reactor Power/Flow Map", September 1999.
6. GE Hitachi Nuclear Energy Report, GE-NE-0000-0099-8344-R1, Revision 1, "Exelon Nuclear LaSalle Units 1 and 2 Thermal Power Optimization Task T0201: Operating Power/Flow Map", November 2009.
7. GNF Report 000N0801-SRLR, Revision 1, "Supplemental Reload Licensing Report for LaSalle Unit 1 Reload 15 Cycle 16," January 2014.
8. GNF Letter from B. R. Moore to Document Control Desk,

Subject:

"GNF2 Advantage Generic Compliance with NEDE-2401 1-P-A (GESTAR II), NEDC-33270P, Revision 5, May 2013," MFN 13-029, May 24, 2013 (ADAMS Accession No. ML13148A318)

9. AREVA Report ANP-2914(P), Revision 1, "Mechanical Design Report for LaSalle Units 1 and 2 MUR ATRIUM-10 Fuel Assemblies," AREVA NP Inc., June 2010.
10. Exelon Transmittal ES1300014, Revision 0, "LaSalle Unit 1 Cycle 16 Final Resolved OPL-3 Parameters,"

August 21, 2013.

11. GNF DRF A12-00038-3, Vol. 4, "Scram Times Verses Notch Position," G. A. Watford, May 22, 1992.
12. GEH Nuclear Energy DRF Section 0000-0151-0765 Rev. 0, "Application of SLO MCPR", 2/12/13.

COLR LaSalle 1 Revision 14 Page 5 of 20

2. Terms and Definitions ARTS Average Power Range Monitor, Rod Block Monitor and Technical Specification Improvement Program ATRM10 AREVA ATRIUM-10 fuel type BOC Beginning of cycle BWR Boiling water reactor CFR Code of Federal Regulations COLR Core operating limits report CRD Control rod drive mechanism DLO Dual loop operation ELLLA Extended load line limit analysis EOC End of cycle EOOS Equipment out of service EOR16 End of rated operation for Cycle 16 FFWTR Final feedwater temperature reduction FWHOOS Feedwater heater out of service GNF Global Nuclear Fuels - Americas ICF Increased core flow Kp Power-dependent MCPR Multiplier L1C16 LaSalle Unit 1 Cycle 16 LHGR Linear heat generation rate LHGRFACF Flow-dependent LHGR multiplier LHGRFACP Power-dependent LHGR multiplier LPRM Local power range monitor MAPLHGR Maximum average planar linear heat generation rate MCPR Minimum critical power ratio MCPRF Flow-dependent MCPR MELLLA Maximum extended load line limit analysis MOC Middle of Cycle Point for Licensing Purposes MSIVOOS Main steam isolation valve out of service OLMCPR Operating limit minimum critical power ratio OOS Out of service OPRM Oscillation power range monitor PBDA Period based detection algorithm PLUOOS Power load unbalance out of service PROOS Pressure regulator out of service RPTOOS Recirculation pump trip out of service RWE Rod withdrawal error SLMCPR Safety limit minimum critical power ratio SLO Single loop operation SRVOOS Safety-relief valve out of service TBV Turbine bypass valve TBVOOS Turbine bypass valve out of service TCV Turbine control valve TCVSC Turbine control valve slow closure TIP Traversing in-core probe TIPOOS Traversing in-core probe out of service TSV Turbine stop valve 3DM 3-D Monicore

COLR LaSalle 1 Revision 14 Page 6 of 20

3. General Information Power and flow dependent limits are listed for various power and flow levels. Linear interpolation is to be used to find intermediate values.

Rated core flow is 108.5 Mlbm/hr. Operation up to 105% rated flow is licensed for this cycle. Licensed rated thermal power is 3546 MWth.

For thermal limit monitoring above 100% rated power or 100% rated core flow, the 100% rated power and the 100% core flow values, respectively, can be used unless otherwise indicated in the applicable table.

Table 3-1 defines the three exposure ranges used in the COLR. The end of rated (EOR) exposure is defined as the cycle exposure corresponding to all rods out, 100% power/100% flow, and normal feedwater temperature.

The term (EOR - 3715 MWd/ST) means the FOR exposure minus 3715 MWd/ST of exposure. The value of the FOR exposure is based on actual plant operation and is thus determined from projections to this condition made near, but before, the time when the EOR16 - 3715 MWd/ST exposure will be reached. For cycle exposure dependent limits at the exact MOC exposure, the more limiting of the BOC to MOC and the MOC to EOC limits should be used. This can be achieved by applying the MOC to EOC limits to the MOC point as all cycle exposure dependent limits in the MOC to EOC limit sets are the same as, or more limiting than, those in the BOC to MOC limit sets.

Table 3-1 Cycle Exposure Range Definitions (Reference 7):

Nomenclature Cycle Exposure Range BOC to MOC BOC16 to (EOR16 - 3715 MWd/ST)

MOC to EOC (EOR16 - 3715 MWd/ST) to EOC16 BOC to EOC BOC16 to EOC16

COLR LaSalle 1 Revision 14 Page 7 of 20

4. Average Planar Linear Heat Generation Rate Technical Specification Sections 3.2.1 and 3.4.1 The MAPLHGR values for the most limiting lattice of each fuel type as a function of average planar exposure are given in Tables 4-1 and 4-2. During single loop operation, these limits are multiplied by the fuel-dependent SLO multiplier listed in Table 4-3. The MAPLHGR values in Tables 4-1 and 4-2 along with the MAPLHGR SLO multipliers in Table 4-3 provide coverage for all modes of operation.

Table 4-1 MAPLHGR for GNF2 Fuel (Reference 7)

Avg. Planar MAPLHGR Exposure (kW/FT)

GWd/ST 0.00 13.78 17.15 13.78 60.78 6.87 63.50 5.50 Table 4-2 MAPLHGR for ATRIUM-10 Fuel (Reference 7)

Avg. Planar MAPLHGR Exposure (kW/FT)

GWd/ST 0 12.81 21.41 12.81 55.42 9.10 63.86 7.30 Table 4 -3 MAPLHGR SLO Multiplier for GNF2 and ATRIUM -10 Fuel, BOC to EOC (Reference 7)

SLO Fuel Type MAPLHGR Multiplier GNF2 0.78 ATRIUM-10 0.78

COLR LaSalle 1 Revision 14 Page 8 of 20

5. Operating Limit Minimum Critical Power Ratio Technical Specification Sections 3.2.2, 3.3.4.1, 3.4.1, and 3.7.7 5.1. Manual Flow Control MCPR Limits The steady-state OLMCPRs given in Table 5-2 are the maximum values obtained from analysis of the pressurization events, non-pressurization events, and the Option III stability evaluation. MCPR values are determined by the cycle-specific fuel reload analyses in Reference 7. Table 5-2 is used in conjunction with the ARTS-based power (Kp) and flow (MCPRF) dependencies presented in Tables 5-3, 5-4, and 5-5 below. The OLMCPR is determined for a given power and flow condition by evaluating the power and flow dependent MCPR values and selecting the greater of the two.

5.1.1. Power-Dependent MCPR The power-dependent MCPR multiplier, Kp, is determined from Table 5-3, and is dependent only on the power level and the Application Group (EOOS). The product of the steady state OLMCPR and the proper KQ provides the power-dependent OLMCPR.

5.1.2. Flow-Dependent MCPR Tables 5-4 through 5-5 give the MCPRF limit as a function of the core flow, based on the applicable plant conditions. The MCPRF limit determined from these tables is the flow-dependent OLMCPR.

5.2. Scram Time Option A and Option B MCPR analyses and results are dependent upon core average control rod blade scram speed insertion times.

The Option A scram time is the Improved Technical Specification scram speed based insertion time. The core average scram speed insertion time for 20% insertion must be less than or equal to the Technical Specification scram speed insertion time to utilize the Option A MCPR limits. Reload analyses performed by GNF for Cycle 16 Option A MCPR limits utilized a 20% core average insertion time of 0.900 seconds (Reference 10).

To utilize the MCPR limits for the Option B scram speed insertion times, the core average scram speed insertion time for 20% insertion must be less than or equal to 0.694 seconds (Reference 10) (0.672 seconds at notch position 39, Reference 11). See Table 5-1 for a summary of scram time requirements related to the use of Option A and Option B MCPR limits.

If the core average scram insertion time does not meet the Option B criteria, but is within the Option A criteria, the appropriate steady state MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. When performing the linear interpolation to determine MCPR limits, ensure that the time used for Option A is 0.900 seconds (0.875 seconds to notch position 39, Reference 11). Note that making interpolations using the Table 5-2 data is conservative because the stability based OLMCPR sets the limit in many conditions. The Option A to Option B linear interpolation need not include the stability OLMCPR penalty on the endpoints when the calculation is made. However, the result of the linear interpolation is required to be 1.51 or greater for the steady state OLMCPR due to the OPRM PBDA setpoint (see Section 9 of the COLR and Reference 7).

COLR LaSalle 1 Revision 14 Page 9 of 20 Table 5-1 Scram Times Required for Option A and Option B Application at Notch Position 39 (References 10 and 11)

Notch Scram Time Required for Option A Scram Time Required for Option B Position* Application Application 39 <_ 0.875 sec. <_ 0.672 sec.

  • - The insertion time to a notch position is conservatively calculated using the CRD reed switch drop-out time per Reference 11.

5.3. Recirculation Flow Control Valve Settings Cycle 16 was analyzed with a maximum core flow runout of 105%; therefore the recirculation pump flow control valves must be set to maintain core flow less than 105% (113.925 Mlbm/hr) for all runout events.

COLR LaSalle 1 Revision 14 Page 10 of 20 Table 5-2 Operating Limit Minimum Critical Power Ratio (OLMCPR) for ATRIUM-10 and GNF2 Fuel (Reference 7)

DLO/ Exposure O ption A O ption B A pp li cati on G roup SLO Ran ge GNF2 ATRMIO GNF2 ATRMIO BOC-MOC 1.51 1.51 1.51 1.51 B ase C ase DLO MOC-EOC 1.61 1.53 1.56 1.51 BOC-MOC 1.56 1.51 1.56 1.51 B ase C ase SLO MOC-EOC 1.63 1.55 1.58 1.52 BOC-MOC 1.58 1.56 1.51 1.51 Base Case + TCVSC DLO

+ RPTOOS + PRODS MOC-EOC 1.69 1.70 1.59 1.53 BOC-MOC 1.60 1.58 1.56 1.51 Base Case + TCVSC SLO

+ RPTOOS + PRODS MOC-EOC 1.71 1.72 1.61 1.55 BOC-MOC 1.53 1.51 1.51 1.51 Base Case + TCVSC +

DLO TBVOOS (all 5 valves)

MOC-EOC 1.65 1.56 1.60 1.53 BOC-MOC 1.56 1.51 1.56 1.51 Base Case + TCVSC +

SLO TBVOOS (all 5 valves)

MOC-EOC 1.67 1.58 1.62 1.55 Base Case + TCVSC + BOC-MOC 1.61 1.59 1.51 1.51 TBVOOS (a ll 5 va l ves) DLO

+ RPTOOS + PROOS MOC-EOC 1.73 1.74 1.63 1.57 Base Case + TCVSC + BOC-MOC 1.63 1.61 1.56 1.51 TBVOOS (a ll 5 va lves) SLO

+ RPTOOS + PROOS MOC-EOC 1.75 1.76 1.65 1.59

COLR LaSalle 1 Revision 14 Page 11 of 20 Table 5-3 Power-Dependent MCPR Multipliers (Kp) for ATRIUM-10 and GNF2 Fuel, DLO and SLO, BOC to EOC, Option A and Option B (Reference 7)

Kp, MCPR Limit Multiplier (as a function of % rated power)

A pp lication Grou p 0% P 25% P 45% P 60% P 85% P 85.01%P 100% P Base Case 1.338 1.338 1.191 1.191 1.061 1.061 1.000 Base Case + TCVSC

+ RPTOOS + 1.488 1.488 1.378 1.296 1.174 1.097 1.000 PROOS Base Case + TCVSC

+ TBVOOS (all 5 1.379 1.379 1.228 1.207 1.097 1.097 1.000 valves)

Base Case + TCVSC

+ TBVOOS (all 5 1.488 1.488 1.378 1.296 1.174 1 . 097 1 . 000 valves) +

RPTOOS + PROOS

COLR LaSalle 1 Revision 14 Page 12 of 20 Table 5-4 DLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B (Reference 7)

Flow MCPRF

(% Rated) 0.0 1.89 30.0 1.70 105.0 1.24 Table 5-5 SLO Flow-Dependent MCPR Limits (MCPRF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, All Application Groups, Option A and Option B (References 7 and 12)

Flow MCPRF

(% Rated) 0.0 1.91 30.0 1.72 105.0 1.26

COLR LaSalle 1 Revision 14 Page 13 of 20

6. Linear Heat Generation Rate Technical Specification Sections 3.2.3 and 3.4.1 The linear heat generation rate (LHGR) limit is the product of the exposure dependent LHGR limit from Table 6-1 or Table 6-2 and the minimum of: the power dependent LHGR Factor, LHGRFACP, or the flow dependent LHGR Factor, LHGRFACF as applicable. The LHGRFACP multiplier is determined from Table 6-3. The LHGRFACF multiplier is determined from either Table 6-4 or Table 6-5. The SLO multipliers in Tables 6-4 and 6-5 have been limited to a maximum value of 0.78, the SLO LHGR multiplier for GNF2 and ATRIUM-10 fuel.

Table 6-1 LHGR Limit for GNF2 Fuel (Reference 8)

Peak Pellet Exposure U02 LHGR Limit See Table B-1 of Reference 8 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit See Table B-2 of Reference 8 Table 6-2 LHGR Limit for ATRIUM-10 Fuel (Reference 9)

Peak Pellet Exposure LHGR Limit (GWd/ST) (kW/ft) 0.0 13.4 16.06 13.4 55.43 9.1 63.87 7.3

COLR LaSalle 1 Revision 14 Page 14 of 20 Table 6-3 Power-Dependent LHGR Multipliers (LHGRFACp) for ATRIUM- 10 and GNF2 Fuel, DLO and SLO, BOC to EOC (Reference 7)

LHGRFACP (as a function of % rated power)

A pp lication Grou p 0% P 25% P 45% P 60% P 85% P 100% P Base Case 0.608 0.608 0.713 0.791 0.922 0.978 Base Case + TCVSC

+ RPTOOS + 0.608 0.608 0.713 0.761 0.831 0.978 PROOS Base Case + TCVSC

+ TBVOOS (all 5 0.608 0.608 0.713 0.791 0.922 0.978 valves)

Base Case + TCVSC

+ TBVOOS (all 5 0.608 0.608 0 . 713 0 . 761 0 . 822 0 . 978 valves) +

RPTOOS + PROOS

COLR LaSalle 1 Revision 14 Page 15 of 20 Table 6-4 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, Pressurization (1 TCV/TSV Closed or OOS), All Application Groups (Reference 7)

Flow DLO LHGRFACF SLO LHGRFACF

(% Rated) 0.0 0.110 0.110 30.0 0.410 0.410 67.0 0.78 0.78 89.0 1 .000 0.78 105.0 1.000 0.78 Table 6-5 Flow-Dependent LHGR Multipliers (LHGRFACF) for ATRIUM-10 and GNF2 Fuel, BOC to EOC, No Pressurization (All TCVITSV In-Service), All Application Groups (Reference 7)

(% Flow DLO LHGRFACF SLO LHGRFACF

(/° Rated) 0.0 0.250 0.250 30.0 0.550 0.550 53.0 0.78 0.78 75.0 1.000 0.78 105.0 1.000 0.78

COLR LaSalle 1 Revision 14 Page 16 of 20

7. Rod Block Monitor Technical Specification Sections 3.3.2.1 and 3.4.1 The Rod Block Monitor Upscale Instrumentation Setpoints are determined from the relationships shown below (Reference 3):

Table 7-1 Rod Block Monitor Setpoints Rod Block Monitor Upscale Trip Function Allowable Value Two Recirculation Loop 0.66 Wd + 54.0%

Operation Single Recirculation Loop 0.66 Wd + 48.7%

Operation The setpoint may be lower/higher and will still comply with the rod withdrawal error (RWE) analysis because RWE is analyzed unblocked. The allowable value is clamped with a maximum value not to exceed the allowable value for a recirculation loop drive flow (Wd) of 100%.

Wd - percent of recirculation loop drive flow required to produce a rated core flow of 108.5 Mlbm/hr.

COLR LaSalle 1 Revision 14 Page 17 of 20

8. Traversing In-Core Probe System 8.1. Description When the traversing in-core probe (TIP) system (for the required measurement locations) is used for recalibration of the LPRM detectors and monitoring thermal limits, the TIP system shall be operable with the following:
1. movable detectors, drives and readout equipment to map the core in the required measurement locations, and
2. indexing equipment to allow all required detectors to be calibrated in a common location.

The following applies for use with 3DM (Reference 4):

The total number of failed and/or bypassed LPRMs does not exceed 25%. In addition, no more than 14 TIP channels can be OOS (failed or rejected).

Otherwise, with the TIP system inoperable, suspend use of the system for the above applicable calibration functions.

H.Z. Bases The operability of the TIP system with the above specified minimum complement of equipment ensures that the measurements obtained from use of this equipment accurately represent the spatial neutron flux distribution of the reactor core. The normalization of the required detectors is performed internal to the core monitoring software system.

COLR LaSalle 1 Revision 14 Page 18 of 20

9. Stability Protection Setpoints Technical Specification Section 3.3.1.3 Table 9 -1 OPRM PBDA Trip Setpoints (Reference 7)

Corresponding Maximum PBDA Trip Amplitude Setpoint (Sp)

Confirmation Count Setpoint (Np) 1.11 14 The PBDA is the only OPRM setting credited in the safety analysis as documented in the licensing basis for the OPRM system.

The OPRM PBDA trip settings are based, in part, on the cycle specific OLMCPR and the power dependent MCPR limits. Any change to the OLMCPR values and/or the power dependent MCPR limits should be evaluated for potential impact on the OPRM PBDA trip settings.

The OPRM PBDA trip settings are applicable when the OPRM system is declared operable, and the associated Technical Specifications are implemented.

COLR LaSalle 1 Revision 14 Page 19 of 20

10. Modes of Operation The allowed modes of operation with combinations of equipment out-of-service are as described below (Reference 7).

Table 10-1 Allowed Modes of Operation and EOOS Combinations (Reference 7)

(1) (2) (4) (5)

Equipment Out of Service Options Short Name (3) Base Base Case (Option A or B)

Base Case + SLO (Option A or B) Base SLO Base Case + TCVSC + RPTOOS + PROOS (Option A or B) Combined EOOS 1 Base Case + TCVSC + RPTOOS + PROOS + SLO (Option A or B) Combined EOOS 1 SLO Base Case + TCVSC + TBVOOS (all 5 valves) (Option A or B) Combined EOOS 2 Base Case + TCVSC + TBVOOS (all 5 valves) + SLO (Option A or B) Combined EOOS 2 SLO Base Case + TCVSC + TBVOOS (all 5 valves) + RPTOOS + PROOS Combined EOOS 3 (Option A or B)

Base Case + TCVSC + TBVOOS (all 5 valves) + RPTOOS + PROOS + SLO Combined EOOS 3 SLO (Option A or B)

(1) Base case includes I SRVOOS + 1 TCVITSV OOS + FWHOOS/FFWTR + 1 MSIVOOS + 2 TBVOOS + PLUOOS, and also includes 1 TIPOOS (up to 14 TIP channels not available) any time during the cycle, including BOC, and up to 25% of the LPRMs out-of-service. The FWHOOS/FFWTR analyses cover a maximum reduction of 100°F for the feedwater temperature.

A nominal LPRM calibration interval of 2000 EFPH (2500 EFPH maximum) is supported for L1C16.

(2) TBVOOS (all 5 valves) is the turbine bypass system out of service which means that 5 TBVs are not credited for fast opening and 3 TBVs are not credited to open in pressure control. For the 2 TBVOOS condition that is a part of the base case, the assumption is that both of the TBVs do not open on any signal and thus remain shut for the transients analyzed (i.e. 3 TBVs are credited to open in pressure control). The MCFL is currently set at 126.6 and will only allow opening of TBV's #1,

  1. 2, #3, and #4 during a slow pressurization event. The MCFL does not use the TBV position feedback signal to know how many TBVs have opened or how far each has opened. The #5 TBV is not available based on the current MCFL setpoint and thus cannot be used as one of the credited valves to open in pressure control.

(3) With all TCVITSV In- Service, the Base Case should be used with the LHGRFACF values from Table 6 -5 (Reference 7).

With 1 TCV/TSV OOS, the Base Case must be used with the LHGRFACF values from Table 6-4. The one Stuck Closed TCV and/or TSV EOOS conditions require power levels 85% of rated. The one MSIVOOS condition is also supported as long as thermal power is maintained 5 75% of the rated.

(4) The + sign that is used in the Equipment Out of Service Option / Application Group descriptions designates an "and/or".

(5) All EOOS Options (Reference 7 Application Groups) are applicable to ELLLA, MELLLA, ICF and Coastdown realms of operation with the exception that SLO is not applicable to MELLLA or ICF (References 5 and 6). The MOC to EOC exposure range limit sets are generated by GNF to include application to coastdown operation (Methodology Reference 5).

COLR LaSalle 1 Revision 14 Page 20 of 20

11. Methodology The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1. XN-NF-81-58 (P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," March 1984.
2. ANF-89-98 (P)(A), Revision 1 and Revision 1 Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," May 1995.
3. EMF-85-74 (P) Revision 0 Supplement 1(P)(A) and Supplement 2(P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," February 1998.
4. XN-NF-85-67 (P)(A) Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel,"

September 1986.

5. N EDE-2401 1 -P-A-20 (Revision 20), "General Electric Standard Application for Reactor Fuel," December 2013 and the U.S. Supplement NEDE-2401 1 -P-A-20-US, of December 2013.
6. NEDC-33106P-A Revision 2, "GEXL97 Correlation for ATRIUM-10 Fuel," June 2004.
7. NEDO-32465-A, "BWR Owner's Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.