MONTHYEARML22146A3732022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 2 of 7 (ML22111A240 Redacted) ML22146A3742022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 3 of 7 (ML22111A241 Redacted) ML22146A3762022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 4 of 7 (ML22111A242 Redacted) RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted)2022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) ML22146A3782022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 6 of 7 (ML22111A244 Redacted) ML22146A3792022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 7 of 7 (ML22111A245 Redacted) ML22111A2392022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 RS-21-034, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair2021-03-0707 March 2021 Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair RA20-016, Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan2020-03-24024 March 2020 Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) RS-18-037, Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 152018-05-0909 May 2018 Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 15 ML18130A7522018-05-0909 May 2018 Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figure 1, FLEX Hose Deployment ML16167A5232016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 13 of 14 - Redacted ML16167A4612016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 02 Figures Part 2 of 2 - Redacted ML16167A4842016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 6 of 14 - Redacted ML16167A4562016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 02 Figures Part 1 of 2 - Redacted ML16167A5012016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 11 of 14 - Redacted ML16167A4852016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 7 of 14 - Redacted ML16167A4992016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 9 of 14 - Redacted ML16167A5242016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 14 of 14 - Redacted ML16167A5002016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 10 of 14 Redacted ML16167A4822016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 4 of 14 - Redacted ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML13282A3482013-10-0404 October 2013 County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H RS-13-151, LaSalle County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H2013-10-0404 October 2013 LaSalle County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H ML12269A0712012-09-17017 September 2012 Attachment 8 - Aerial Photographs from Www.Bing.Com/Maps and Site Layout Drawings (I.E., Figures 4A-4E), Site Layout Drawings 1 E-0-4900A, 1 E-0-4900B, and S-1 561, Revision B ML1003213712010-01-27027 January 2010 Attachment 14 - Mechanical Drawings for Leading Edge Flowmeter Installation 2022-04-13
[Table view] Category:Letter type:RA
MONTHYEARRA23-072, Regulatory Commitment Change Summary Report2023-12-15015 December 2023 Regulatory Commitment Change Summary Report RA23-057, Registration of Use of Cask to Store Spent Fuel2023-08-11011 August 2023 Registration of Use of Cask to Store Spent Fuel RA23-055, Registration of Use of Cask to Store Spent Fuel2023-08-11011 August 2023 Registration of Use of Cask to Store Spent Fuel RA23-052, Registration of Use of Cask to Store Spent Fuel2023-08-0404 August 2023 Registration of Use of Cask to Store Spent Fuel RA23-051, Registration of Use of Cask to Store Spent Fuel2023-07-21021 July 2023 Registration of Use of Cask to Store Spent Fuel RA23-048, Registration of Use of Cask to Store Spent Fuel2023-07-14014 July 2023 Registration of Use of Cask to Store Spent Fuel RA23-045, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2023-06-30030 June 2023 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation RA23-047, Registration of Use of Cask to Store Spent Fuel2023-06-30030 June 2023 Registration of Use of Cask to Store Spent Fuel RA23-018, Post-Outage Inservice Inspection (ISI) Summary Report2023-06-27027 June 2023 Post-Outage Inservice Inspection (ISI) Summary Report RA23-046, Registration of Use of Cask to Store Spent Fuel2023-06-23023 June 2023 Registration of Use of Cask to Store Spent Fuel RA23-042, Registration of Use of Cask to Store Spent Fuel2023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel RA23-029, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report RA23-028, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RA23-027, Annual Dose Report for 20222023-04-21021 April 2023 Annual Dose Report for 2022 RA23-025, Post Accident Monitoring Report2023-04-0707 April 2023 Post Accident Monitoring Report RA23-013, Submittal of Triennial Chlorine Survey Report2023-03-30030 March 2023 Submittal of Triennial Chlorine Survey Report RA23-019, Cycle 20 Core Operating Limits Reports2023-03-21021 March 2023 Cycle 20 Core Operating Limits Reports RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter RA22-060, Regulatory Commitment Change Summary Report2022-11-30030 November 2022 Regulatory Commitment Change Summary Report RA22-051, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval2022-11-16016 November 2022 Submittal of the Snubber Program Plan for the Fourth 10-Year Interval RA22-041, Unit 2 Cycle 19 Core Operating Limits Report Revision2022-10-0505 October 2022 Unit 2 Cycle 19 Core Operating Limits Report Revision RA22-029, Cycle 20 Startup Test Report Summary2022-06-10010 June 2022 Cycle 20 Startup Test Report Summary RA22-021, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report2022-06-0808 June 2022 Post-Outage 90-Day Inservice Inspection (ISI) Summary Report RA22-020, Annual Radiological Environmental Operating Report2022-05-13013 May 2022 Annual Radiological Environmental Operating Report RA22-018, Annual Dose Report for 20212022-04-22022 April 2022 Annual Dose Report for 2021 RA22-010, Cycle 20 Core Operating Limits Reports2022-03-21021 March 2022 Cycle 20 Core Operating Limits Reports RA21-059, Regulatory Commitment Change Summary Report2021-11-30030 November 2021 Regulatory Commitment Change Summary Report RA21-050, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2021-11-0909 November 2021 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation RA21-051, County Station Physical Security Plan (Revision 18)2021-09-29029 September 2021 County Station Physical Security Plan (Revision 18) RA21-052, Registration of Use of Cask Store Spent Fuel2021-09-17017 September 2021 Registration of Use of Cask Store Spent Fuel RA21-046, Registration of Use of Cask to Store Spent Fuel2021-08-0505 August 2021 Registration of Use of Cask to Store Spent Fuel RA21-043, Cycle 19 Startup Test Report Summary2021-07-15015 July 2021 Cycle 19 Startup Test Report Summary RA21-031, 2020 Annual Radiological Environmental Operating Report2021-05-13013 May 2021 2020 Annual Radiological Environmental Operating Report RA21-029, Unit 2 - 2020 Annual Radioactive Effluent Release Report2021-04-29029 April 2021 Unit 2 - 2020 Annual Radioactive Effluent Release Report RA21-026, Annual Dose Report for 20202021-04-22022 April 2021 Annual Dose Report for 2020 RA21-016, Netco Rack Insert 10-year Surveillance Report2021-04-15015 April 2021 Netco Rack Insert 10-year Surveillance Report RA21-017, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report2021-04-0909 April 2021 Post-Outage 90-Day Inservice Inspection (ISI) Summary Report RA21-019, Unit 2 Cycle 19 Core Operating Limits Reports2021-04-0707 April 2021 Unit 2 Cycle 19 Core Operating Limits Reports RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter RA20-044, Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report2020-09-10010 September 2020 Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report RA20-026, 2019 Annual Radiological Environmental Operating Report2020-05-13013 May 2020 2019 Annual Radiological Environmental Operating Report RA20-023, Annual Dose Report for 20192020-04-28028 April 2020 Annual Dose Report for 2019 RA20-016, Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan2020-03-24024 March 2020 Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan RA20-015, Triennial Chlorine Survey Report2020-03-20020 March 2020 Triennial Chlorine Survey Report RA20-014, Cycle 19 and Cycle 18 Core Operating Limits Reports2020-03-12012 March 2020 Cycle 19 and Cycle 18 Core Operating Limits Reports RA19-048, Registration of Use of Cask to Store Spent Fuel2019-09-0606 September 2019 Registration of Use of Cask to Store Spent Fuel RA19-045, Registration of Use of Cask to Store Spent Fuel2019-08-0909 August 2019 Registration of Use of Cask to Store Spent Fuel RA19-041, Registration of Use of Cask to Store Spent Fuel2019-07-0303 July 2019 Registration of Use of Cask to Store Spent Fuel RA19-039, Registration of Use of Cask to Store Spent Fuel2019-06-25025 June 2019 Registration of Use of Cask to Store Spent Fuel RA19-034, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report2019-06-0707 June 2019 Post-Outage 90-Day Inservice Inspection (ISI) Summary Report 2023-08-04
[Table view] |
Text
La$aUe C~unty Station *.
260t N.orth' ~1st Bead.
Marseilles, IL 61341
.815415-2000 Teiephone WWli\(eX~lon~orp.COJTI
- RA20-016 10.Cf=R 50.9 March 24, 2020 .
.**~~~&J1~'1J~iii~j{[Jif~;t*i~n
. W~$hingtoh, oc.--205s5~0.001.:~ *..
. .--*- *- **- - -* ***-_,--- ,. --1* *--* '. - - ..,__ ..
' . - - - . ,. . . . . *:. . .. - -~*-- .* - ~ *-* . * . - - *---,.... ::._:_ ~. -- *. . :;_*: - **. - --r .* . ~ - .* *.-. . ' .-, - - ~~------ - - - - - .-**--~--------*-*.-. - .....- - - - - - . - * - - . ____,_;. ---- - - - - --- ~ -- **. * -
. L~$alle Cou11ty 'Station, Unit 1 and Unit 2 Reb'ev.iedFatility Operating Liceilse No. NFP-11 and NPF-18 .
NRG b6cket*1'.ic>:*50-373 and 50~374 * * \ '
Subject:
'Gorre.Gted drawing for on~-iine el~ctrical powersuppl{for !-aSalle Hardened C6nt~irii:lie,ntVenF$ysJe,rn (HCVS) Final l,ntegrated Plari (FIP) : ..* . *.. : ** .*
Reference:
- *Exelqn letter Jc:> NRG,* R,~p'6rt qt FuU Compliance with Pt)ase 1 and Phase 2 of J.une q, 201 ~ Ctjhimission Order f\llodifyjng License,s with Regardtq Reliable .
Hardened Containment Vents Capab(e of Operation Under SevereiAcddent Conditions . ' :
(Orp,er
109),
date*q,
.. *,* OeGenib~r
' ' ~. . .
14, *.~018.,, . '
(rvi L 1&~481;3252)' .
0 In 8CG0rdi:i!1CE(with 1Q. gi=A:~.o.}{ ;,Cgmpl~tE!n~ss ahd 'accura~y: of information": La:salle 'Gounty Station (!.,$CS) is j:>rov)ding .*~. cqrr~ct~d drawing f pr the HCVS fl P r~pbfi :previpus,ly .* , *,.
- communicated.to NRG by leUEl(dated Deceirtber 14, 2018.: While reviewing porti.o'ns of LaSalle sf~tionis FIP fo~ the Hc\1$, .it\JVas: discovered thqt the incorrect diagram .Y"as s.ubmjttE!d in *
- Attachmerif3. The *attachm.ent :is *,lab~led *as the "One Line Di.agrani of HCVS E;lectrical Power
. Supply." The draWfr)g tt")at shoulci have been *submitted .in that attachment is 1E-b-4000FA, enclosed .with this letter. . . . .
There we no regulatory commitments contained wi'thin this lette*r.
Should you have ahy .questio"r1s* concerning this letter, please contact Mr. Dan Mearhoff, R~gulatciry Ass*urance Manager, ai (815) 415.:.2aoo. .
.. Respectfully,
- - - - ~ ~ ~ * * * * *.*..*..*. *.*.. *....~. >**.*... * ..* .*. - ..*..*.....*.* *******.** "***** APt.g-~=*****~
- LaSall~ Cotmty Station .* * /J ,. *
- Attachments: Drawing 1E-0~4000FA, revision A, Key Diagram Hardened Containment Vent System (~CV$) 12~VDC Distribution Panel ODC52E cc: NRC Senior Resident lrispector'- La$alle County Station
ii Ii 1
II Ii*I:
8 1* !i 7 6 5 4 3 2 VJ000v-0-3 l ii ii E E D
I I T~ f HCVS 125VDC DISTRIBUTION PANEL 0DC52E rrr r r (W/0 1E-0-4504CA) rrf I
j.
11 f f 12 13 D
IE-2-4031ZF 1E-B-45B4CA 1E-0-4~1Hc.l. 1£-2-46~ 1[-ll-4!167,tJ>
AMP I~
'" .21lA
,! t.lCRPNL BATT(RYTESTING sPARc SERVICE 01'Mll!!J COKN(CTTO~
C C B I ' B
' I NOTES 1 J A A cosr f'CR RECORD PER EC J~2l5.l. KEY DIAGRAM A.
1* ' HARDENED CONTAINMENT VENT SYSTEM {HCVS) *125VDC .
,f i:
I, DISTRIBUTION PANEL 0DC52E I* 1E-0-4000FA
!f SHEET NO: SIZE, D E04 I
! I 6 5 4 3 2 8 ~i i
3/1.3/2020
- .' ~l ,;*
DtieDate~
- .1J:'., /~*,*:.~,: _"*,
C\03/1 a/2020 *ivent o~te: . 11 /f1/i019,
'[,
Orlglriatloh Dc1te:
.Affect~~ Facilitf. .*LASA[LE .* Aff~cteclUnit: , NOT APPLICABLE ' Affected ~~e~:'
GENI;:RATING
- STATION ARTYi>e:** ,CR . OwedTo: REG ASSURANCE CR Level/Class: 4/D CAP EVAL
Su~Jf§; ' :11;J~z~,~g'1)1fG~~ :~p,BMl~TE~,WITH Hqv~ Fl,NALJNJEGRA"fED PLA,N , ,
p~sc:i'iptlpn: * , *. *. O~ig.ir:i:a,t9( ~ND,~EW RWAIU~Efll: /$up~ G~ntacted:' !ylcBree~. Harcharic~'. Mearh~ff .
~-~~-+~""~-;;~.--:~~---.* e~fid1if~~:oes{dpifciri: ',: .*>:.> );:~~t * . ,:~~~-~~ . :.'\~;~~:;_"~2;.;::
- . . . . While'.reviewin/j'pci'rt16ns*of LaSalle'Stati6h's Fi~al Integrated Plan (FIP,) for the hardened coritainniehtverftsystein . . *
- . : ~~~-* . *"--'*.*_ :~-~ . :, i * ... :~--:*-**:-,~_,;_;~*-,;-.. ~
, . (1-ibV~): ffaf~!spqxer~ftt:ic!}th~)hcofrect di,ag!.an,'fas, ~ub-rni~te~ ifr ~ttachrrient 3. The a,tt~9~rnen~ is iabe!e~as .,
- th¥ on'?"hne d1,agrarr:i o(HCV_S ell;!ctnc~I power supi:ilY: The dr~wmg Ihat sho"!ld )lave been su9m_1tted m tt:iat -*
attachment*i~.s}E,o-:4000FA.* * * * *
~ ..':.'*}:
l~ryiediate,~tticfr1~,ta~eri: , *S .. , . . , . * . *. .
Cohtaqted Superyisb(,Program ..,E:ngineer <!nd. Reg Assurance Manager. . Wrpte IR.
~ ~ ; . , . ' , . .. . .
Recoirimerided Actions': ' '. ' '. , : ' '
Act'ioh.
to Reg " ' ..
Ass'ofan'ce
- '.. . ici submit supplement
. ~ .
List.C>f kno~ledge~ble indiJiduals; '
. Warren-* . . . , .
Meartioff *
.lnlUal Scre'enirig Que8tio~s': '. . ,.. ..* . . . * *. * * : , . . * : * . *. , ...* " . , ..
Etjulp_meiit'i~~u~ IOcatedJrdhe ,Vital Area; Protected Area, or other owner control.led properti~s such as. switchyarcls orLake/River Screei{House? no ' ' ' ' ' ' >' ' ' ' '
Pro9edure 9/pro9es§ iisu~s with the potential to affect complia11ce wi,th TS o(ncerise c'on~itiOns? i,Q P,oferitiai'repcirt~bility conce,rns?.nci , *..* . ' . . * * . . : , .. , . , * ,
Analy'si~ or s~tpginfdeficiencies'\hafirTipact onsite or offsite dose or dose rates? no Nuclear saf¢ty issue? 110 . . , . . *. *. .
- Significant lridustrial Safety issue (ie;' excluding First Aids, non-work related issues, PPE Issues, etc)? no Persor/rie.1 injury requiring offsite medical attention? no . * .* .
- Tamperjng, v~ndalism or malicious mischief? rio . , -
Shift Review Not Required:*
true *
Shift Revie~Not Required
=*"* ~ - - - - -
. ,Report~ple B~sis:
- . --*~*****,-:--*--:-sl1JffReviewN,prR~q~ired
. , -,-~ ---': **-*--**** ******'--*-*:-*;****--- -- ....................~,.,..., . _~~==-.. --------,=-~*****= =~ ...~
0
-=--
Furictiorial Basis:'
Shift Revi~w Not Required .
. *:c~c: tc:_: ;~~~~~~!'IE~~P~k)\~c1:,~Tg'b~1~~~:' :c:~CC*==:c"'~="**cc'.:~. 2c'E.:**** .cc' ...........
..~i,rblllLts.upp11;m1ent to LaSalle Station's, Final lnfegrated Plari (FIP).":(rwd)
-~~--'--~~-'Clqse.'tg.ALgenerat~ *'. "d.1<>J~.eg.~ssui<!OC.e_to "', *,', .. ,,* '" .......... . ,................
Good Catch .
WOltKAGAlll,IST __:
No W.orl<Ag~inst Details Found.
QYN~ICAh~;:~UTES ',
newcap.exeloncorii'.ccirn/arreport/4296569 1/2
3/13/2020 ' },ieWCAP2
. Goo,d ca~,ch 08610
,,TREND CO'oES' N~Tr.e'r\d Codes Found.
ASSIGNl'AENTS Assignment Ql Assigned To Statuf!: COMPLETE No., *. _"
Affected LASALLE GENERATING STATION Primary ALL SITE CAPCOS Due Date: 11/17/2019
,J=acility: . . Group:_
Assignment .CAP MODEL-TRACKING ASSIGNMENT (CRS.eqqndary Orlginal Due
.!ifi;i; PI-M-120) *. Grau(): '.
Date: * .
}'- ~
Unijt,.
Condition:
~~bjec:t: INCORRECT DiAGRAM SUl3MITJED WITH HCVS FINALINTEGRATED PLAN
. . .. Assignment . . 02 . * : . . .. * . . .. 'Assigned To TERRY U'.ANC . <Status:, . . ACC/ASG '
- --*****----*~1tec:te~~ - .
r=a6i,iity:
.* . li:~~ . ..
Group:
R~GULAf~~;-
ASSURANCE .
. '~Du~D~~~: . 0~/18/;620 ..
Assighmerit . ACTION ITEMS (CR PI-M-125) sJcon'dary Original Due 12/15/2019 Type:*.. . . Group: .. bat~:
. -,. . RE!f: . Co'ndition:
- Sµbject: Reg Assurance to submit supplement to LaSalle St11tiori's Final Integrated Plan (FIP) ..*