|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:September 21, 2015 | | {{#Wiki_filter:September 21, 2015 |
| | Mr. Edward D. Halpin, Senior Vice President |
| | and Chief Nuclear Officer |
| | Pacific Gas and Electric Company |
| | Diablo Canyon Power Plant |
| | P.O. Box 56, Mail Code 104/6 |
| | Avila Beach, CA 93424 |
| | SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC |
| | INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016301; |
| | 05000323/2016301 |
| | Dear Mr. Halpin: |
| | In a telephone conversation on September 3, 2015, between Messrs. R. Fortier, Lead |
| | Examination Developer, and K. Clayton, Chief Examiner, arrangements were made for the |
| | administration of licensing examinations at Diablo Canyon Power Plant, Units 1 and 2, during |
| | the week of April 18, 2016. |
| | As agreed during the telephone conversation, your staff will prepare the examinations based on |
| | the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power |
| | Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power |
| | Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your |
| | staff any changes that might be necessary before the examinations are administered. |
| | To meet the above schedule, it will be necessary for your staff to furnish the examination |
| | outlines by January 16, 2016. The written examinations, operating tests, and supporting |
| | reference materials identified in Attachment 3 of ES-201 will be due by February 15, 2016. |
| | Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations |
| | (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the |
| | outlines, examinations, and tests before they are submitted to the NRC for review and approval. |
| | All materials shall be complete and ready to use. We request that any personal, proprietary, |
| | sensitive unclassified, or Safeguards Information in your response be contained in a separate |
| | enclosure and appropriately marked. Any delay in receiving the required examinations and |
| | reference materials, or the submittal of inadequate or incomplete materials, may cause the |
| | examinations to be rescheduled. In addition, your support for on-site validation of the |
| | examinations is required during the week of March 21, 2016. |
| | In order to conduct the requested written examinations and operating tests, it will be necessary |
| | for your staff to provide adequate space and accommodations in accordance with ES-402, and |
| | to make the simulation facility available on the dates noted above. In accordance with ES-302, |
| | your staff should retain the original simulator performance data (e.g., system pressures, |
| | temperatures, and levels) generated during the dynamic operating tests until the examination |
| | results are final. |
|
| |
|
|
| | E. Halpin -2- |
|
| | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in |
|
| | effect while the written examinations and operating tests are being administered. |
| Mr. Edward D. Halpin, Senior Vice President | | To permit timely NRC review and evaluation, your staff should submit preliminary operator and |
| | senior operator license applications (Office of Management and Budget (OMB) approval |
| | number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver |
| | requests (if any) (OMB approval number 3150-0090) at least 30 days before the first |
| | examination date. If the applications are not received at least 30 days before the examination |
| | date, a postponement may be necessary. Signed applications certifying that all training has |
| | been completed should be submitted at least 14 days before the first examination date. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act of |
| | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under |
| | approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for |
| | this collection of information is estimated to average 50 hours per response, including the time |
| | for reviewing instructions, gathering and maintaining the data needed, and completing and |
| | reviewing the collection of information. Send comments regarding this burden estimate or any |
| | other aspect of these information collections, including suggestions for reducing the burden, to |
| | the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory |
| | Commission, Washington, DC 20555-0001, or by Internet electronic mail to |
| | INFOCOLLECTS@NRC.GOV. |
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an |
| | information collection, unless it displays a currently valid OMB control number. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of |
| | this letter will be available electronically for public inspection in the NRCs Public Document |
| | Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide |
| | Documents Access and Management System (ADAMS). ADAMS is accessible from the |
| | electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading- |
| | rm/adams.html. |
| | Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies |
| | and guidelines referenced in this letter. If you have any questions regarding the NRCs |
| | examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216, or myself |
| | at 817-200-1159. |
| | Sincerely, |
| | /RA/ |
| | Vincent G. Gaddy, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket Nos. 50-275 and 50-323 |
| | License Nos. DPR-80 and DPR-82 |
|
| |
|
| and Chief Nuclear Officer
| | E. Halpin -3- |
| | cc: Electronic Distribution |
|
| |
|
| Pacific Gas and Electric Company
| |
|
| |
| Diablo Canyon Power Plant
| |
|
| |
| P.O. Box 56, Mail Code 104/6
| |
|
| |
| Avila Beach, CA 93424
| |
|
| |
|
| |
| SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016301;
| |
|
| |
| 05000323/2016301
| |
|
| |
| Dear Mr. Halpin:
| |
|
| |
|
| |
| In a telephone conversation on September 3, 2015, between Messrs. R. Fortier, Lead
| |
|
| |
| Examination Developer, and K. Clayton, Chie
| |
| f Examiner, arrangements were made for the
| |
| administration of licensing examinations at Diablo Canyon Power Plant, Units 1 and 2, during
| |
|
| |
| the week of April 18, 2016.
| |
|
| |
|
| |
| As agreed during the telephone conversation, your
| |
| staff will prepare the examinations based on
| |
| the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
| |
|
| |
| Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power
| |
|
| |
| Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your
| |
|
| |
| staff any changes that might be necessary bef
| |
| ore the examinations are administered.
| |
|
| |
| To meet the above schedule, it will be necessary
| |
| for your staff to furnish the examination
| |
| outlines by January 16, 2016. The written examinations, operating tests, and supporting
| |
|
| |
| reference materials identified in Attachment 3 of ES-201 will be due by February 15, 2016.
| |
|
| |
| Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
| |
|
| |
| (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
| |
|
| |
| outlines, examinations, and tests before they ar
| |
| e submitted to the NRC for review and approval.
| |
| All materials shall be complete and ready to use. We request that any personal, proprietary,
| |
| sensitive unclassified, or Safeguards Information in your response be contained in a separate
| |
|
| |
| enclosure and appropriately marked. Any delay
| |
| in receiving the required examinations and
| |
| reference materials, or the submittal of inadequate or incomplete materials, may cause the
| |
|
| |
| examinations to be rescheduled. In addition, your support for on-site validation of the
| |
|
| |
| examinations is required during the week of March 21, 2016.
| |
|
| |
|
| |
| In order to conduct the requested written examinations and operating tests, it will be necessary
| |
|
| |
| for your staff to provide adequate space and accommodations in accordance with ES-402, and
| |
|
| |
| to make the simulation facility available on the dates noted above. In accordance with ES-302,
| |
| your staff should retain the original simulator performance data (e.g., system pressures,
| |
| temperatures, and levels) generated during the dy
| |
| namic operating tests until the examination
| |
| results are final.
| |
| E. Halpin - 2 -
| |
|
| |
| Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
| |
|
| |
| effect while the written examinations and operating tests are being administered.
| |
|
| |
|
| |
| To permit timely NRC review and evaluation, your
| |
| staff should submit preliminary operator and
| |
| senior operator license applications (Offi
| |
| ce of Management and Budget (OMB) approval
| |
| number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
| |
| requests (if any) (OMB approval number 3150-
| |
| 0090) at least 30 days before the first
| |
| examination date. If the applications are not
| |
| received at least 30 days before the examination
| |
| date, a postponement may be necessary. Signed applications certifying that all training has
| |
|
| |
| been completed should be submitted at least 14 days before the first examination date.
| |
|
| |
|
| |
| This letter contains information collections that are subject to the
| |
| Paperwork Reduction Act of
| |
| 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
| |
| approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
| |
|
| |
| this collection of information is estimated to average 50 hours per response, including the time
| |
|
| |
| for reviewing instructions, gathering and maintaining the data needed, and completing and
| |
|
| |
| reviewing the collection of information. Send comments regarding this burden estimate or any
| |
|
| |
| other aspect of these information collections, including suggestions for reducing the burden, to
| |
|
| |
| the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
| |
|
| |
| Commission, Washington, DC 20555-0001, or by Internet electronic mail to
| |
|
| |
| INFOCOLLECTS@NRC.GOV.
| |
| The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
| |
|
| |
| information collection, unless it displays a currently valid OMB control number.
| |
|
| |
|
| |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
| |
|
| |
| this letter will be available electronically for public inspection in the NRC's Public Document
| |
|
| |
| Room or from the Publicly Available Reco
| |
| rds (PARS) component of the NRC's Agencywide
| |
| Documents Access and Management System (ADA
| |
| MS). ADAMS is accessible from the
| |
| electronic Reading Room page of the NRC's public Web site at
| |
| http://www.nrc.gov/reading-
| |
| rm/adams.html.
| |
| Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies
| |
|
| |
| and guidelines referenced in this letter. If you have any questions regarding the NRC's
| |
|
| |
| examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216, or myself
| |
|
| |
| at 817-200-1159.
| |
|
| |
|
| |
| Sincerely,
| |
|
| |
|
| |
| /RA/
| |
| Vincent G. Gaddy, Chief
| |
| Operations Branch
| |
| Division of Reactor Safety
| |
|
| |
|
| |
| Docket Nos. 50-275 and 50-323
| |
|
| |
| License Nos. DPR-80 and DPR-82
| |
|
| |
|
| |
| E. Halpin - 3 -
| |
|
| |
| cc: Electronic Distribution
| |
|
| |
| ML15265A080 SUNSI Review By: VGaddy
| |
| ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE:OB C:OB NAME KClayton VGaddy SIGNATURE /RA/ /RA/ DATE 9/21/15 9/21/15
| |
| Letter to Edward D. Halpin from Vincent G. Gaddy, dated September 21, 2015
| |
|
| |
|
| |
| SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016301;
| |
|
| |
| 05000323/2016301
| |
|
| |
| Electronic distribution by RIV
| |
| : Regional Administrator (Marc.Dapas@nrc.gov)
| |
|
| |
| Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
| |
|
| |
| DRP Director (Troy.Pruett@nrc.gov)
| |
|
| |
| DRP Deputy Director (Ryan.Lantz@nrc.gov)
| |
|
| |
| DRS Director (Anton.Vegel@nrc.gov)
| |
|
| |
| DRS Deputy Director (Jeff.Clark@nrc.gov)
| |
|
| |
| Senior Resident Inspector (Tom.Hipschman@nrc.gov)
| |
|
| |
| Resident Inspector (John.Reynoso@nrc.gov)
| |
|
| |
| Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
| |
|
| |
| Acting Branch Chief, DRP/A (Ryan.Alexander@nrc.gov)
| |
|
| |
| Project Engineer, DRP/A (Mathew.Kirk@nrc.gov)
| |
|
| |
| Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
| |
| Public Affairs Officer (Victor.Dricks@nrc.gov)
| |
|
| |
| Public Affairs Officer (Lara.Uselding@nrc.gov)
| |
|
| |
| Project Manager (Siva.Lingam@nrc.gov)
| |
|
| |
| Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
| |
|
| |
| RITS Coordinator (Marisa.Herrera@nrc.gov)
| |
|
| |
| ACES (R4Enforcement.Resource@nrc.gov)
| |
|
| |
| Regional Counsel (Karla.Fuller@nrc.gov)
| |
|
| |
| Technical Support Assistant (Loretta.Williams@nrc.gov)
| |
|
| |
| Congressional Affairs Officer (Jenny.Weil@nrc.gov)
| |
|
| |
| RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
| |
|
| |
| RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
| |
|
| |
|
| | ML15265A080 |
| | SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: |
| | By: VGaddy Yes No Non-Publicly Available Sensitive RGN-002 |
| | OFFICE SOE:OB C:OB |
| | NAME KClayton VGaddy |
| | SIGNATURE /RA/ /RA/ |
| | DATE 9/21/15 9/21/15 |
| | |
| | Letter to Edward D. Halpin from Vincent G. Gaddy, dated September 21, 2015 |
| | SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC |
| | INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016301; |
| | 05000323/2016301 |
| | Electronic distribution by RIV: |
| | Regional Administrator (Marc.Dapas@nrc.gov) |
| | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | DRP Director (Troy.Pruett@nrc.gov) |
| | DRP Deputy Director (Ryan.Lantz@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| | Senior Resident Inspector (Tom.Hipschman@nrc.gov) |
| | Resident Inspector (John.Reynoso@nrc.gov) |
| | Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) |
| | Acting Branch Chief, DRP/A (Ryan.Alexander@nrc.gov) |
| | Project Engineer, DRP/A (Mathew.Kirk@nrc.gov) |
| | Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | Project Manager (Siva.Lingam@nrc.gov) |
| | Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | ACES (R4Enforcement.Resource@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| | RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) |
| ROPreports | | ROPreports |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20233012023-07-25025 July 2023 NRC Initial Operator Licensing Examination Approval 05000275/2023301, 05000323/2023301 IR 05000275/20163012016-06-0707 June 2016 NRC Examination Report 05000275/2016301; 05000323/2016301 ML15265A0802015-09-21021 September 2015 Notification of NRC Initial Operator Licensing Examination 05000275/2016301; 05000323/2016301 IR 05000275/20143012014-09-25025 September 2014 Er 050002752014301; 050003232014301; on August 8 - August 27, 2014; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000275/20123022013-01-0303 January 2013 IR 05000275-12-302; Pacific Gas & Electric Company; 05000323-12-302;11/21- 12/3/ 2012; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000275/20123012012-04-0303 April 2012 Er 05000275-12-301, 05000323-12-301, March 9, 2012 to March 27, 2012, Diablo Canyon Power Plant, Units 1 and 2, Initial Operator Licensing Retake Written Examination Report IR 05000275/20113022012-01-18018 January 2012 Er 05000275-11-302; 05000323-11-302; November 15 - 21, 2011; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000275/20113012011-09-20020 September 2011 Er 05000275-11-301; 05000323-11-301; July 8 - August 22, 2011; Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report DCL-11-074, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations2011-07-0101 July 2011 Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20103012010-02-24024 February 2010 Er 05000275-10-301, 05000323-10-301; on January 8 - 28, 2010; Diablo Canyon Power Plant, Units 1 & 2; Initial Operator Licensing Examination Report IR 05000275/20093012009-03-31031 March 2009 IR 05000275-09-301, 05000323-09-301 on 02/06/09 - 02/20/09 for Diablo Canyon, Units 1 and 2, Initial Operator Licensing Examination Report IR 05000275/20083012008-07-22022 July 2008 Er 05000275-08-301, 05000323-08-301, on June 13 - 23, 2008, Diablo Canyon Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report ML0901405642008-06-27027 June 2008 DC - 2008 -06 - Post Examination Comments DCL-05-107, Response to NRC Regulatory Issue Summary 2005-19; Preparation and Scheduling of Operator Licensing Examinations2005-09-16016 September 2005 Response to NRC Regulatory Issue Summary 2005-19; Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20053012005-03-31031 March 2005 Er 05000275-05-301 and 05000323-05-301, on 2/8-16/2005, Diablo Canyon Generating Station, Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination DCL-02-078, Response to NRC Regulatory Issue Summary 2002-09; Preparation and Scheduling of Operator Licensing Examinations2002-07-12012 July 2002 Response to NRC Regulatory Issue Summary 2002-09; Preparation and Scheduling of Operator Licensing Examinations 2024-08-26
[Table view] |
See also: IR 05000275/2016301
Text
September 21, 2015
Mr. Edward D. Halpin, Senior Vice President
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC
INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016301;
05000323/2016301
Dear Mr. Halpin:
In a telephone conversation on September 3, 2015, between Messrs. R. Fortier, Lead
Examination Developer, and K. Clayton, Chief Examiner, arrangements were made for the
administration of licensing examinations at Diablo Canyon Power Plant, Units 1 and 2, during
the week of April 18, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by January 16, 2016. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 of ES-201 will be due by February 15, 2016.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready to use. We request that any personal, proprietary,
sensitive unclassified, or Safeguards Information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of March 21, 2016.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
E. Halpin -2-
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216, or myself
at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-275 and 50-323
License Nos. DPR-80 and DPR-82
E. Halpin -3-
cc: Electronic Distribution
ML15265A080
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: VGaddy Yes No Non-Publicly Available Sensitive RGN-002
OFFICE SOE:OB C:OB
NAME KClayton VGaddy
SIGNATURE /RA/ /RA/
DATE 9/21/15 9/21/15
Letter to Edward D. Halpin from Vincent G. Gaddy, dated September 21, 2015
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC
INITIAL OPERATOR LICENSING EXAMINATION 05000275/2016301;
05000323/2016301
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Tom.Hipschman@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Acting Branch Chief, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Mathew.Kirk@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
ROPreports