|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:0 REGULATOR INFORMATION DISTRIBUTION i'EM (RIDS)ACCESSION NSR:0501200200 DOC,DATE: 05/01/17 NOTARIZED: | | {{#Wiki_filter:0 REGULATOR INFORMATION DISTRIBUTION i'EM (RIDS) |
| YES DOCKETi 0 FACIL:50 397 NPPSS Nuclear Projects Unit-2g Washington Public.Powe'5000397 AUTH>>NAME AUTHOR AFFILIATION SORENSENEG>>CD Washington Public Power Supply System RECIP,NAME RECIPIENT AFFILIATION SCHHENCERiA'0 Licensing Branch 2 | | ACCESSION NSR:0501200200 DOC,DATE: 05/01/17 NOTARIZED: YES DOCKETi 0 FACIL:50 397 NPPSS Nuclear Projects Unit- 2g Washington Public. Powe'5000397 AUTH>>NAME AUTHOR AFFILIATION SORENSENEG>>CD Washington Public Power Supply System RECIP,NAME RECIPIENT AFFILIATION SCHHENCERiA'0 Licensing Branch 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Application to amend License, NPF 2iiextending required'ate> | | Application to amend License, NPF 2iiextending required'ate> |
| for30 days to replace e.lectrical equipment, Amend due to design changesidelays in procurementEtest complications. | | for30 days to replace e.lectrical equipment, Amend due to design changesidelays in procurementEtest complications. L installation problems.Fee paid, DISTRIBUTION CODE: A048D COPIES RECEI VED>> LiTR ENCLA "'IZE; TITLE: OR/Licensing Submittal: Equipment Qualification NOTES! 05000397 OL>> 12'/20/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME" LTTR ENCL ID CODE/NAME LTTR. |
| L installation problems.Fee paid, DISTRIBUTION CODE: A048D COPIES RECEI VED>>LiTR ENCLA"'IZE;TITLE: OR/Licensing Submittal: | | AULUCKgR'1 ENCL'= |
| Equipment Qualification NOTES!OL>>12'/20/83 05000397 RECIPIENT ID CODE/NAME" NRR'B2 BC 12'NTERNAL; ACRS 15 ELD/HDS2'2 NRR, KARSCHiR NRR/DL DIR 10 NRR/DSI/AE8 RGNS COPIES LTTR ENCL 1 0 8 8 l.1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME AULUCKgR'1 ADM/LFflB, GC.13<NRR/DE/EQB 07 N/ORAB 06" G 04 COPIES LTTR.ENCL'=1 1~0.1 1 2'2.1 1 1 1.EXTERNAL>>LPDR NSIC 03 05 1 1 1 NRC PDR 02~Wll'>>0.9+/po$+o TOTAL NUMBER" OF COPIES REQUIRED'TTR 20 ENCL 22 II i e~(II f'4 II iaaf't'L f'~5 F, tf II I III ll lh V 4 V ,~'g6+P I p I Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 January 17, 1985 G02-85-021 Docket No.50-397 I Director of Nuclear Reactor Regulation Attention: | | NRR'B2 BC 1 0 1 ACRS 12'NTERNAL; 15 8 8 ADM/LFflB, 1 ~ |
| Mr.A.Schwencer, Chief'icensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
| | 0. |
| | ELD/HDS2'2 l. 1 GC. 13< 1 1 |
| | '2. |
| | NRR, KARSCHiR 1 NRR/DE/EQB 07 2 NRR/DL DIR 10 1 1 N /ORAB 06" 1 1 NRR/DSI/AE8 1 1 G 04 1 1. |
| | RGNS 1 1 EXTERNAL>> LPDR 03 1 NRC PDR 02 NSIC 05 1 1 |
| | ~ Wll'>>0. 9 |
| | +/po $ +o TOTAL NUMBER" OF COPIES REQUIRED'TTR 20 ENCL 22 |
|
| |
|
| ==Dear Mr.Schwencer:== | | II i |
| | e iaaf |
| | ~ ( II f ' |
| | 4 II |
| | 't |
| | 'L f ' |
| | 5 |
| | ~ |
| | F, tf II I |
| | III ll lh V |
| | 4 , |
| | ~ |
| | ' g6+P V |
| | I p I |
| | |
| | Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 17, 1985 G02-85-021 Docket No. 50-397 I |
| | Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Branch No. 2 'icensing Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 |
| | |
| | ==Dear Mr. Schwencer:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| | NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) |
| | NOT I F I CAT ION |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | Letter, G02-83-842,.G. C. Sorensen (SS) to A. |
| | Schwencer (NRC), "Environmental Qualification Report for Safety Related Equipment, September 1983", dated September 16, 1983 The subject license condition requires the Supply System to environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 prior to March 31, 1985. In order to satisfy this condition, the equipment identified in Attachment 1 must be replaced. This will require plant shut-down while systems are removed from service for component replacement. |
| | The Supply System has determined that due to recent design changes, delays in procurement, test complications, and installation problems, we must request an extension for thirty .(30) days from the required date for the items identified in Attachment 1. Accordingly, in accordance with the Code of Federal Regulations,'arts 50.90 and 2. 101, the Supply System requests that the subject license condition be amended to read as follows: |
| | 850i240208 850il7 PDR ADOCK 050003'P7 P PDR |
| | ~ol+q )~.e4 |
| | @ ~@V~ |
| | |
| | N |
| | ~ \ |
| | C |
| | |
| | A. Schwencer Page Two REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) NOTIFICATION "Prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 with exception of the equipment listed below, which shall be qualified on or before April 30, 1985." |
| | MS-LITS-26A PSR-V-X77A/1 MS-L ITS-26B PSR-V-X77A/3 MS-L ITS-26C RRA-RMS-FN/1 MS-L ITS-26D RRA-RMS-FN/2 REA- E/P- lA RRA-RMS-FN/3 REA-E/P-1B L PCS-PIS-1 The Supply System has reviewed this change per 10 CFR 50.59 and determined that no unreviewed safety questions will result from this extension. |
| | The Supply System has reviewed this change per 10 CFR 50.92 and determined that it does not: |
| | : 1) involve a significant increase in the probability or consequences of an accident previously evaluated because (a) overall equipment qualification requirements applicable to WNP-2 are themselves more stringent than similar require-ments applicable to plants licensed to operate prior to February 22, 1983 and (b) given the overall requirements governing the operation of WNP-2, the requested amendment does not constitute a significant change to the licensing basis of the plant; or |
| | : 2) create the possibility of a new or different kind of accident from any accident previously evaluated because no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible; or |
| | : 3) involve a significant reduction in a margin of safety because no original design parameters are being reduced. |
| | This amendment is being requested in the spirit of the extension for environ-mental qualification under which the industry operates. Namely, deferral is technically justified and allows .utilities the opportunity to install qualified equipment on a reasonable schedule with minimal impact to resources. Such would also coincide with our presently scheduled outage of mid to late an'xtension April, 1985. WNP-2, through agreements with Bonneville Power Administration (BPA), must schedule our planned outages to coincide with the peak river flow and hydro. generation in the Pacific Northwest. This extension would accommodate BPA's request and be in the public interest. |
| | |
| | P g~ |
| | pC < |
| | i'$ |
| | i |
| | |
| | A. Schwencer Page Three REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) NOTIFICATION The Supply System would also like to take this opportunity to advise you of another matter concerning environmental qualification related to high energy line break analysis (i.e. RWCU and. RCIC lines, Refer to Licensee Event Report 85-001). We are presently undertaking an independent assessment of the appropriateness of the stroke times of the valves identified in Attach-ment 2. These valves are presently identified on Table B of the Justification for Interim Operation (JIO) as being qualified. We expect this study to be completed in 6 to 8 weeks. Until this study is completed, we have insufficient basis upon which to conclude that an application for a license amendment is necessary. If the results indicate that a change is necessary in order to satisfy qualification design criteria, an emergency license condition amend-ment will be requested prior to March 31, 1985. If a change is necessitated, we plan to block the valves to reduce the stroke times during the next sched-uled outage, and procure the replacement parts on an expedited basis. |
| | The Supply System has evaluated this request in accordance with the criteria in 10 CFR 170.21, and has included a warrant for one hundred fifty dollars |
| | ($ 150.00) as initial payment for this application for amendment under Facility Category A (Power Reactors). |
| | In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter. |
| | This letter also, provides notification per 10 CFR 50.49(h). |
| | Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing. As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2 requires approval of this amendment no later than March 31, 1985. |
| | G. C. Sorensen, Manager Regulatory Programs PLP/tmh Attachments cc: R Auluck - NRC WS Chin - BPA N Lewis - EFSEC JB Martin - NRC RV AD Toth - NRC Site |
| | |
| | ) |
| | S r.:o. |
| | gN' |
| | |
| | Attachment 1 Equipment Proposed for Replacement by A ril 30, 1985 for Environmental uglification Replacement EPN Descri tion E ui ment MS-L ITS-26A Level Transmitter Rosemount 1153 |
| | -26B Static. 0 Ring D05PA |
| | -26C |
| | -26D PSR-V-X77A/1 Solenoid Valve Upgrade Kit |
| | -X77A/3 RRA-RMS-FN/1 Remote Manual Switch Electroswitch |
| | -FN/2 |
| | -FN/3 REA-E/P-1A El ectro/Pneumati c ITT Conoflow |
| | -1B Converters LPCS-PIS-1 Pressure Switch Static 0 Ring |
| | |
| | N il FF |
| | ) |
| | I |
| | ,' |
| | |
| | Attachment 2 E ui ment Presentl Bein Evaluated EPN Descri tion Modification RCIC-MO-V/63 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available RWCU-MO-V/1 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available |
| | |
| | ~ ~ |
| | I |
| | ~'s l" |
| | t |
| | |
| | h |
| | ~ 4 h t ~ |
| | I |
| | 'HNP-2 OL NPF-23, Request fop . |
| | Amendment to Licensing Gondstion (28) 8 Environmental gualification STATE OF WASHINGTON ) |
| | lOCFR50.49(h) Notification |
| | ) |
| | County of Benton ) |
| | I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true. |
| | OATE / cJAQ , 1985 or sen, anager Regulatory Programs On this day personally appeared before me G. C. SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned. |
| | GIVEN under my hand and seal this day of , 1985. |
| | otry u c xnan orte State of Washing o Residing at h t tp t htt' h p |
| | I' |
|
| |
|
| NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO LICENSE CONDITION (28)AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h)NOT I F I CAT ION Letter, G02-83-842,.G.
| | F, ~ ~ |
| C.Sorensen (SS)to A.Schwencer (NRC),"Environmental Qualification Report for Safety Related Equipment, September 1983", dated September 16, 1983 The subject license condition requires the Supply System to environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 prior to March 31, 1985.In order to satisfy this condition, the equipment identified in Attachment 1 must be replaced.This will require plant shut-down while systems are removed from service for component replacement.
| | S |
| The Supply System has determined that due to recent design changes, delays in procurement, test complications, and installation problems, we must request an extension for thirty.(30)days from the required date for the items identified in Attachment 1.Accordingly, in accordance with the Code of Federal Regulations,'arts 50.90 and 2.101, the Supply System requests that the subject license condition be amended to read as follows: 850i240208 850il7 PDR ADOCK 050003'P7 P PDR q)~.e4@~@V~~ol+
| | ~ |
| N~\C A.Schwencer Page Two REQUEST FOR AMENDMENT TO LICENSE CONDITION (28)AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h)NOTIFICATION"Prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 with exception of the equipment listed below, which shall be qualified on or before April 30, 1985." MS-LITS-26A MS-L ITS-26B MS-L ITS-26C MS-L ITS-26D REA-E/P-lA REA-E/P-1B PSR-V-X77A/1 PSR-V-X77A/3 RRA-RMS-FN/1 RRA-RMS-FN/2 RRA-RMS-FN/3 L PCS-PIS-1 The Supply System has reviewed this change per 10 CFR 50.59 and determined that no unreviewed safety questions will result from this extension.
| | J I |
| The Supply System has reviewed this change per 10 CFR 50.92 and determined that it does not: 1)involve a significant increase in the probability or consequences of an accident previously evaluated because (a)overall equipment qualification requirements applicable to WNP-2 are themselves more stringent than similar require-ments applicable to plants licensed to operate prior to February 22, 1983 and (b)given the overall requirements governing the operation of WNP-2, the requested amendment does not constitute a significant change to the licensing basis of the plant;or 2)create the possibility of a new or different kind of accident from any accident previously evaluated because no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible;or 3)involve a significant reduction in a margin of safety because no original design parameters are being reduced.This amendment is being requested in the spirit of the extension for environ-mental qualification under which the industry operates.Namely, deferral is technically justified and allows.utilities the opportunity to install qualified equipment on a reasonable schedule with minimal impact to resources.
| | I |
| Such an'xtension would also coincide with our presently scheduled outage of mid to late April, 1985.WNP-2, through agreements with Bonneville Power Administration (BPA), must schedule our planned outages to coincide with the peak river flow and hydro.generation in the Pacific Northwest.
| | ,~yeas ~ |
| This extension would accommodate BPA's request and be in the public interest.
| | e |
| P g~pC<i'$i A.Schwencer Page Three REQUEST FOR AMENDMENT TO LICENSE CONDITION (28)AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h)NOTIFICATION The Supply System would also like to take this opportunity to advise you of another matter concerning environmental qualification related to high energy line break analysis (i.e.RWCU and.RCIC lines, Refer to Licensee Event Report 85-001).We are presently undertaking an independent assessment of the appropriateness of the stroke times of the valves identified in Attach-ment 2.These valves are presently identified on Table B of the Justification for Interim Operation (JIO)as being qualified.
| | -3 d}} |
| We expect this study to be completed in 6 to 8 weeks.Until this study is completed, we have insufficient basis upon which to conclude that an application for a license amendment is necessary.
| |
| If the results indicate that a change is necessary in order to satisfy qualification design criteria, an emergency license condition amend-ment will be requested prior to March 31, 1985.If a change is necessitated, we plan to block the valves to reduce the stroke times during the next sched-uled outage, and procure the replacement parts on an expedited basis.The Supply System has evaluated this request in accordance with the criteria in 10 CFR 170.21, and has included a warrant for one hundred fifty dollars ($150.00)as initial payment for this application for amendment under Facility Category A (Power Reactors).
| |
| In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.This letter also, provides notification per 10 CFR 50.49(h).Should you have any questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.
| |
| As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2 requires approval of this amendment no later than March 31, 1985.G.C.Sorensen, Manager Regulatory Programs PLP/tmh Attachments cc: R Auluck-NRC WS Chin-BPA N Lewis-EFSEC JB Martin-NRC RV AD Toth-NRC Site
| |
| )S r.:o.gN' Attachment 1 Equipment Proposed for Replacement by A ril 30, 1985 for Environmental uglification EPN Descri tion Replacement E ui ment MS-L ITS-26A-26B-26C-26D Level Transmitter Rosemount 1153 Static.0 Ring D05PA PSR-V-X77A/1-X77A/3 Solenoid Valve Upgrade Kit RRA-RMS-FN/1-FN/2-FN/3 Remote Manual Switch Electroswitch REA-E/P-1A
| |
| -1B El ectro/Pneumati c Converters ITT Conoflow LPCS-PIS-1 Pressure Switch Static 0 Ring N il)FF I ,'
| |
| Attachment 2 E ui ment Presentl Bein Evaluated EPN Descri tion Modification RCIC-MO-V/63 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available RWCU-MO-V/1 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available
| |
| ~~I~'s l" t h~4 h t~I STATE OF WASHINGTON
| |
| ))County of Benton)'HNP-2 OL NPF-23, Request fop.Amendment to Licensing Gondstion (28)8 Environmental gualification lOCFR50.49(h)
| |
| Notification I, G.C.SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.OATE/cJAQ , 1985 or sen, anager Regulatory Programs , 1985.On this day personally appeared before me G.C.SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.
| |
| GIVEN under my hand and seal this day of h t tp h t htt'p I'otry u c xnan orte State of Washing o Residing at F,~~~J S I I ,~yeas~e-3 d}}
| |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
0 REGULATOR INFORMATION DISTRIBUTION i'EM (RIDS)
ACCESSION NSR:0501200200 DOC,DATE: 05/01/17 NOTARIZED: YES DOCKETi 0 FACIL:50 397 NPPSS Nuclear Projects Unit- 2g Washington Public. Powe'5000397 AUTH>>NAME AUTHOR AFFILIATION SORENSENEG>>CD Washington Public Power Supply System RECIP,NAME RECIPIENT AFFILIATION SCHHENCERiA'0 Licensing Branch 2
SUBJECT:
Application to amend License, NPF 2iiextending required'ate>
for30 days to replace e.lectrical equipment, Amend due to design changesidelays in procurementEtest complications. L installation problems.Fee paid, DISTRIBUTION CODE: A048D COPIES RECEI VED>> LiTR ENCLA "'IZE; TITLE: OR/Licensing Submittal: Equipment Qualification NOTES! 05000397 OL>> 12'/20/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME" LTTR ENCL ID CODE/NAME LTTR.
AULUCKgR'1 ENCL'=
NRR'B2 BC 1 0 1 ACRS 12'NTERNAL; 15 8 8 ADM/LFflB, 1 ~
0.
ELD/HDS2'2 l. 1 GC. 13< 1 1
'2.
NRR, KARSCHiR 1 NRR/DE/EQB 07 2 NRR/DL DIR 10 1 1 N /ORAB 06" 1 1 NRR/DSI/AE8 1 1 G 04 1 1.
RGNS 1 1 EXTERNAL>> LPDR 03 1 NRC PDR 02 NSIC 05 1 1
~ Wll'>>0. 9
+/po $ +o TOTAL NUMBER" OF COPIES REQUIRED'TTR 20 ENCL 22
II i
e iaaf
~ ( II f '
4 II
't
'L f '
5
~
F, tf II I
III ll lh V
4 ,
~
' g6+P V
I p I
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 17, 1985 G02-85-021 Docket No. 50-397 I
Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Branch No. 2 'icensing Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Schwencer:
Subject:
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h)
NOT I F I CAT ION
Reference:
Letter, G02-83-842,.G. C. Sorensen (SS) to A.
Schwencer (NRC), "Environmental Qualification Report for Safety Related Equipment, September 1983", dated September 16, 1983 The subject license condition requires the Supply System to environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 prior to March 31, 1985. In order to satisfy this condition, the equipment identified in Attachment 1 must be replaced. This will require plant shut-down while systems are removed from service for component replacement.
The Supply System has determined that due to recent design changes, delays in procurement, test complications, and installation problems, we must request an extension for thirty .(30) days from the required date for the items identified in Attachment 1. Accordingly, in accordance with the Code of Federal Regulations,'arts 50.90 and 2. 101, the Supply System requests that the subject license condition be amended to read as follows:
850i240208 850il7 PDR ADOCK 050003'P7 P PDR
~ol+q )~.e4
@ ~@V~
N
~ \
C
A. Schwencer Page Two REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) NOTIFICATION "Prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 with exception of the equipment listed below, which shall be qualified on or before April 30, 1985."
MS-LITS-26A PSR-V-X77A/1 MS-L ITS-26B PSR-V-X77A/3 MS-L ITS-26C RRA-RMS-FN/1 MS-L ITS-26D RRA-RMS-FN/2 REA- E/P- lA RRA-RMS-FN/3 REA-E/P-1B L PCS-PIS-1 The Supply System has reviewed this change per 10 CFR 50.59 and determined that no unreviewed safety questions will result from this extension.
The Supply System has reviewed this change per 10 CFR 50.92 and determined that it does not:
- 1) involve a significant increase in the probability or consequences of an accident previously evaluated because (a) overall equipment qualification requirements applicable to WNP-2 are themselves more stringent than similar require-ments applicable to plants licensed to operate prior to February 22, 1983 and (b) given the overall requirements governing the operation of WNP-2, the requested amendment does not constitute a significant change to the licensing basis of the plant; or
- 2) create the possibility of a new or different kind of accident from any accident previously evaluated because no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible; or
- 3) involve a significant reduction in a margin of safety because no original design parameters are being reduced.
This amendment is being requested in the spirit of the extension for environ-mental qualification under which the industry operates. Namely, deferral is technically justified and allows .utilities the opportunity to install qualified equipment on a reasonable schedule with minimal impact to resources. Such would also coincide with our presently scheduled outage of mid to late an'xtension April, 1985. WNP-2, through agreements with Bonneville Power Administration (BPA), must schedule our planned outages to coincide with the peak river flow and hydro. generation in the Pacific Northwest. This extension would accommodate BPA's request and be in the public interest.
P g~
pC <
i'$
i
A. Schwencer Page Three REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) AND ENVIRONMENTAL QUALIFICATION 10 CFR 50.49(h) NOTIFICATION The Supply System would also like to take this opportunity to advise you of another matter concerning environmental qualification related to high energy line break analysis (i.e. RWCU and. RCIC lines, Refer to Licensee Event Report 85-001). We are presently undertaking an independent assessment of the appropriateness of the stroke times of the valves identified in Attach-ment 2. These valves are presently identified on Table B of the Justification for Interim Operation (JIO) as being qualified. We expect this study to be completed in 6 to 8 weeks. Until this study is completed, we have insufficient basis upon which to conclude that an application for a license amendment is necessary. If the results indicate that a change is necessary in order to satisfy qualification design criteria, an emergency license condition amend-ment will be requested prior to March 31, 1985. If a change is necessitated, we plan to block the valves to reduce the stroke times during the next sched-uled outage, and procure the replacement parts on an expedited basis.
The Supply System has evaluated this request in accordance with the criteria in 10 CFR 170.21, and has included a warrant for one hundred fifty dollars
($ 150.00) as initial payment for this application for amendment under Facility Category A (Power Reactors).
In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
This letter also, provides notification per 10 CFR 50.49(h).
Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing. As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2 requires approval of this amendment no later than March 31, 1985.
G. C. Sorensen, Manager Regulatory Programs PLP/tmh Attachments cc: R Auluck - NRC WS Chin - BPA N Lewis - EFSEC JB Martin - NRC RV AD Toth - NRC Site
)
S r.:o.
gN'
Attachment 1 Equipment Proposed for Replacement by A ril 30, 1985 for Environmental uglification Replacement EPN Descri tion E ui ment MS-L ITS-26A Level Transmitter Rosemount 1153
-26B Static. 0 Ring D05PA
-26C
-26D PSR-V-X77A/1 Solenoid Valve Upgrade Kit
-X77A/3 RRA-RMS-FN/1 Remote Manual Switch Electroswitch
-FN/2
-FN/3 REA-E/P-1A El ectro/Pneumati c ITT Conoflow
-1B Converters LPCS-PIS-1 Pressure Switch Static 0 Ring
N il FF
)
I
,'
Attachment 2 E ui ment Presentl Bein Evaluated EPN Descri tion Modification RCIC-MO-V/63 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available RWCU-MO-V/1 Motor Operator Block Valve Travel Partially Closed Until Replacement Parts Available
~ ~
I
~'s l"
t
h
~ 4 h t ~
I
'HNP-2 OL NPF-23, Request fop .
Amendment to Licensing Gondstion (28) 8 Environmental gualification STATE OF WASHINGTON )
lOCFR50.49(h) Notification
)
County of Benton )
I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.
OATE / cJAQ , 1985 or sen, anager Regulatory Programs On this day personally appeared before me G. C. SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this day of , 1985.
otry u c xnan orte State of Washing o Residing at h t tp t htt' h p
I'
F, ~ ~
S
~
J I
I
,~yeas ~
e
-3 d