{{#Wiki_filter:FLORIDA POWER&LIGHT COMPANY ST.LUCIE PLANT OPERATING PROOEDORE NIPIEER 0030119 REVIS ION 0 1 TITLE: POST TRIP REVIEW 2~PREPARED BY: Bob Storke 3~SUBCtMMITTEE REVIEW BY: Dan West for FPL NED 4~REVIEWED BY FACILITY REVIEW GROUP 5~APPROVED BY~0+~>'MPLANT MANAGER 6~REVIEWED BY F R G 7~APPROVED BY PLANT MANAGER 83081602h3 830811 PDR ADOCK 05000389 P PDR I l'1)(jf Page 1 of 5 FLORIDA POWER 6 LIGHT COMPANY ST.LUCIE PLANT OPERATING PROCEDURE AMBER 0030119 REVISION 0 1.0 Title: Post Trip Review 2.0 Review and A royal: Reviewed by Facility Review Group Approved by~lant Manager 1983 dZ~r'9 fZ Revision Reviewed by F R G Approved by Plant Manager 19 19 3.0~Pet ose: This procedure will identify any abnormal circumstances associated with a plant trip by'evaluating plant conditions immediately prior to and immediately after the trip.4.0.Limits and Precautions:
{{#Wiki_filter:FLORIDA POWER   & LIGHT COMPANY ST. LUCIE PLANT OPERATING PROOEDORE NIPIEER   0030119 REVIS ION   0 1     TITLE:                         POST TRIP REVIEW 2~     PREPARED BY:                     Bob Storke 3~     SUBCtMMITTEE REVIEW BY:         Dan West     for FPL NED 4~     REVIEWED BY FACILITY REVIEW GROUP 5~     APPROVED BY           ~ 0+~>'MPLANT MANAGER 6~     REVIEWED BY F R G 7~     APPROVED BY                               PLANT MANAGER 83081602h3 830811 PDR ADOCK   05000389 P                 PDR         I
4~1 If the cause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be returned to power until the events associated with the trip are evaluated by the Facility Review Group e 5~0 Related S stem Status: N/A 6 0  
 
l
  '1
    ) ( jf
 
Page   1 of 5 FLORIDA POWER 6 LIGHT COMPANY ST. LUCIE PLANT OPERATING PROCEDURE AMBER 0030119 REVISION 0
 
==1.0 Title==
Post Trip Review 2.0   Review and A     royal:
Reviewed by     Facility Review Group                                     1983 Approved by                                 ~lant   Manager         dZ~r'9 fZ Revision       Reviewed by F R G                                         19 Approved by                                   Plant Manager               19 3.0   ~Pet ose:
This procedure     will identify any abnormal circumstances associated with   a plant   trip by'evaluating plant conditions   immediately prior to and immediately after the trip.
4.0 . Limits and Precautions:
4~1   If the cause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be returned to power until the events associated with the trip are evaluated by the Facility Review Group e 5~0   Related   S stem Status:
N/A 6 0  


==References:==
==References:==


N/A A signed copy of this procedure with the applicable strip charts and printouts attached shall be retained in the plant files.
N/A A signed copy of this procedure with the applicable strip charts       and printouts attached shall be retained in the plant files.
Page 2 of 5 ST~LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW 8.0 Instructions:
 
F 1 This procedure will be performed following any unplanned reactor trip after plant conditions have been stabilized.
Page   2 of 5 ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119,             REVISION   0 POST TRIP REVIEW
The procedure need not be performed following a planned shutdown.8'Input from all plant personnel is vital to the correct identification of the cause of the plant trip and of any related malfunctions.
 
8.3.All data pertinent to the-plant trip should be collected and kept with this procedure.
==8.0 Instructions==
If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned-to its recorder..
F 1   This procedure   will be   performed following any unplanned reactor trip after plant conditions     have been stabilized. The procedure need not be performed following a planned shutdown.
8~4 All blanks on, the"POST-TRIP REVIEW CHECK SHEET" should be filled in, use N/A where not applicable.
8 '   Input from all plant personnel is   vital to the correct identification of the   cause of the   plant trip and of any related malfunctions.
sb 3m'Page 3 of 5 ST~LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET (Page 1 of 3)(I)UNIT NO, REACTOR S/D NO.DATE//(2)Reactor trip actuated by:)j MANUAL ((AUTO (RPS)A.Reason for Manual Trip: B.RPS trip unit initiating Reactor Tripf l.If hi pressurizer pressure trip, did PORV reclose?(3)All TCEs opee2[[YES+[NO All CEA Rod bottom lights2[[YES[[NO A.Actuation Time: Time Last TCB Open (SOE)Time of Trip Signal (SOE)Difference (4)Safety Features Actuation Required (Check)SIAN MS IS DIAS APAS CSAS A.If any system was required, did it function properly'l
8.3 . All data pertinent to the- plant trip should be collected and kept with this procedure. If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned- to its recorder..
)(YES ()NO (5)First out annunciator RTGB 102/202: (6)Plant Electrical Alignment (Check)BEFORE TRIP AFTER TRIP Auxiliary Transformer Startup Transformer Diesel Generator (7)Pressurizer pressure and level.control normal?((YES ((NO Page 4 of 5 ST~LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET Page of (8)Steam Generator Feed: (Check)MAIN FEED AUXILIARY FEED BEFORE TRIP A B AFTER TRIP A B (9)Did secondary systems function properly'BCS Feed Reg System Generator Lockout YES YES YES~NO NO NO (10)Plant Conditions immediately prior to trip: (11)Reason for Reactor Trip: (12)Any unusual conditions during Rx trip or trip.recovery: (13)Any unusual or unexplained annunciators during trip or trip recovery: (14)NRC notified within one (1)hourV ((YES ()NO Page 5 of 5 ST~LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET Page 3 of 3 (15)Emergency Plan implemented?(YES f/NO (if YES, give classification and explain)(16)Will maintenance be required prior to returning to power?((YES (/NO (If YES,.explain)(17)Attach DDPS, SOE printouts, and any other printout or chart used to determine cause of reactor trip or to show any abnormal condition during trip.I (18)Additional Remarks: (if NO was answered in Step 2(b), 3, 4(A), 7 6 9, explain)(19)The cause of reactor trip has been identified, no abnormal conditions exist.The plant can safely be returned to power.Nuclear Plant Supervisor S,T,Ai  
8~4   All blanks on, the "POST-TRIP   REVIEW CHECK SHEET" should be filled in, use N/A where not applicable.
~,C II 1 FLORIDA POWER 6 LIGHT C(MPANY ST.LUCIE PLANT OPERATING PROCEDURE NN BER-00301 19 REViSION 0 1.0 Title: Post Trip Review 2.0 Review and An royal: Reviewed by Facility Review Group Approved by'dt M<~~Revision Reviewed by F R G Approved by~ant Manager Plant Manager s P 2S 198'~~~19J'19 19 3.0~Por ose: This procedure will identify any abnormal circumstances associa'ted with a plant trip by evaluating plant conditions immediately prior to and immediately after the trip.4.0 Limits and Precautions:
 
4.1 If the cause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be returned to power until the events associated with the trip are evaluated by the Facility Review Groups 5.0 Related S stem Status: N/A 6.0  
                                                                                  'Page     3   of 5 sb 3m ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119,                   REVISION       0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET (Page 1 of 3)
(I) UNIT NO,             REACTOR S/D NO.           DATE       /     /
(2) Reactor   trip actuated by:       )   j MANUAL   ( (
AUTO (RPS)
A. Reason   for Manual Trip:
B. RPS trip unit initiating Reactor Tripf
: l. If hi pressurizer pressure trip, did           PORV   reclose?
(3) All TCEs   opee2   [   [YES +[NO All CEA       Rod bottom   lights2     [   [YES   [   [NO A. Actuation Time:         Time Last TCB Open (SOE)
Time of Trip Signal (SOE)
Difference (4) Safety Features Actuation Required         (Check)
SIAN                   MS IS DIAS                   APAS CSAS A. If any system was required, did       it function     properly'l )     (YES   (   )NO (5)   First out annunciator     RTGB   102/202:
(6)   Plant Electrical Alignment         (Check)
BEFORE TRIP     AFTER TRIP Auxiliary Transformer Startup Transformer Diesel Generator (7)   Pressurizer pressure and level. control normal?           (   (YES   (     (NO
 
Page 4 of 5 ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119,                             REVISION   0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET Page               of (8) Steam Generator Feed:     (Check)
BEFORE             TRIP        AFTER TRIP A                     B         A       B MAIN FEED AUXILIARYFEED (9) Did secondary systems   function   properly'BCS YES        NO Feed Reg System       YES        NO Generator Lockout       YES   ~   NO (10) Plant Conditions immediately prior to                     trip:
(11) Reason for Reactor Trip:
(12) Any unusual   conditions during   Rx             trip   or trip. recovery:
(13) Any unusual   or unexplained annunciators during                   trip or trip recovery:
(14) NRC notified within one (1) hourV               (   (YES (   )NO
 
Page   5   of 5 ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119,             REVISION   0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET Page 3 of 3 (15) Emergency Plan implemented?                 (YES f /NO (if YES, give classification and explain)
( 16) Will maintenance be required prior to returning to       power? (   (YES   (   /NO (If YES,. explain)
(17)   Attach DDPS, SOE printouts,   and any other printout or chart used to determine cause of reactor     trip or to show any abnormal condition during trip.               I (18)   Additional Remarks:
(if NO was answered   in Step 2(b), 3, 4(A),   7 6 9, explain)
(19)   The cause of reactor trip has been identified, no abnormal conditions exist. The plant can safely be returned to power.
Nuclear Plant Supervisor                             S,T,Ai
 
~,C II 1
 
FLORIDA POWER 6 LIGHT C(MPANY ST. LUCIE PLANT OPERATING PROCEDURE   NN BER-00301 19 REViSION 0 s
 
==1.0 Title==
Post   Trip Review 2.0   Review and An     royal:
Reviewed by Approved by Revision
                        'dt Facility  Review Group Reviewed by F M<
R G
                                          ~~ ~ant           Manager P 2S 198'~~~
19J' 19 Approved by                                    Plant Manager                19 3.0 ~Por ose:
This procedure     will identify any abnormal   circumstances associa'ted with       a plant   trip   by evaluating plant conditions immediately prior to and immediately     after the trip.
4.0   Limits   and   Precautions:
4.1   If the cause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be returned to power until the events associated with the trip are evaluated by the Facility Review Groups 5.0   Related   S stem Status:
N/A 6.0  


==References:==
==References:==


N/A 7.0 Records Re uired: A signed copy of this procedure with the applicable strip charts and printouts attached shall be retained in the plant files.
N/A 7.0   Records Re     uired:
1~,/l~1 e, i'ROC ED UR F.POST!.li (: 'i 8"!.A i~'!'V U.!8 E R')0 3 i)!l n, TR?P REVIEW 8.0 Ins tructions:
A signed copy of     this procedure with the applicable strip charts     and printouts attached shall     be retained in the plant files.
8.1 This procedure will be performed following any unplanned reactor trip after plant conditions have been stabilized.
 
The procedure need not be performed following a planned shutdown.8.2 Input t.~m all plant personnel is vital to the correct identification of the cause of the plant trip and of any related malfunctions.
  ~,/
8.3 All data pertinent to the plant trip should be collected and kept with this procedure.
l~
If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned to its recorder.8 4 All blanks on the"POST-TRIP REVIEW CHECK SHEET" should be filled in, use N/A where not applicable.  
1       1
~1 1 1 I~QI"!'.i/A'i'
 
'(i'8!lCEDiJR
e, i'ROC ED UR F.
';: 4'i~!i)i'.2,'I'I 3('i" POST TR IP Ri V IEW POST TRIP REVIEW CHECK SHEET (Page}of 3)(1)UNIT NO.REAC1'OR S/D NO.DATE//TIME (2)Reactor trip actuated by: j j MANUAL j j AUTO (RPS)A.Reason for Manual Trip: B.RPS trip unit initiating Reactor Trip?l.If hi pressurizer pressure trip, did PORV reclose?(3)All TCBs open?j jYES j jNO All CEA Rod bottom lights?j jYES j jNO A.Actuation Time: Time Last TCB Open (SOE)Time of Trip Signal (SOE)Dif ference (4)Safety Features Actuation Required (Check)SIAN DIAS CS AS MS IS AE AS A.If any syst: em was required, did it function properly?j jYES j jNO (5)First out annunciator RTGB 102/202: (6)Plant Electrical Alignment (Check)BEFORE TRIP AFTER TRIP Auxiliary Trans former S tartup Trans f ormer Diesel Generator (7)Pressurizer pressure and level control normal?j j YES j jNO  
                                          !. li (: 'i 8 "!. A i~
~~~!':."'"'.!'ii'.!;
POST TR?P
DUB!'.i"i<0!'.l(l!i!')'!"'OST T!<I!'i'.'~',!:W POST TRIP REVIEW CHECK SHEET Page of (8)Steam Generator Feed: (Check)MAIN FEED)AUXILIARY FEED BEFORE T''AFTER TRIP A B A B I (9)'id secondary systems function properly?SBCS Feed Reg S ys tern Generator Lockout YES YES YES NO NO NO (10)Plant Conditions immediately prior to trip: (ll)Reason for Reactor Trip: (12)Any unusual conditions during Rx trip or trip recovery: (13)Any unusual or unexplained annunciators during trip or trip recovery: (14)NRC notified within one (1)hour?ilYES i iNO  
                                                                '!'V U.! 8 E R ') 0 3 i) ! l REVIEW n,
<>P!.RAT LYLY:::!:(l<'.EDi>RE ViJ.!BE!',:>O 3O: i 9.R'.;'OST TRIP REVIEW POST TRlF REVIEW CHECK SHEET Page 3 of 3 (15)Emergency Plan implemented?
8.0 Ins tructions:
j YES j jNO (if YES, give classification and explain)(16)Will maintenance be required prior to returning to power?j j YES)j NO (If YES, explain)(17)Attach DDPS, SOE printouts, and any other printout or chart used to determine cause of reactor trip or to show any abnormal condition during trip.(18)Addi tional Remarks: (if NO was answered in Step 2(b), 3, 4(A), 7 6 9, explain)(19)The cause of reactor trip has been identified, no abnormal conditions exist.The plant can safely be returned to power.Nuclear Plant Supervisor S.T.A APPENDIX A TO I 2-PR/PSL-1 1.0 The descriptions listed below provide a scope of those activities which have been determined as requiring one or more aspects of the PSL Quality Program.A.Those items described in the FSAR as being safety related, or seismically or post loca qualified.
8.1   This procedure     will be performed following any unplanned reactor trip after plant conditions           have been stabilized.           The procedure need not be performed following a planned shutdown.
This includes clarifying documents such as Instrument Lists, Piping&Valve Line Lists, P&ID's, Drawings and original equipment specifi-cations.B.PC/M items identified as being safety related, seismically or post loca qualified.
8.2   Input t. ~m all plant personnel is           vital       to the correct identification of     the cause of the plant                 trip and of any related malfunctions.
C.10CFR-71, Radwaste Shipping.D.10CFR-20, Radiation Protection.
8.3   All data pertinent to the plant trip should be collected and kept with this procedure. If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned to its recorder.
E.Activities specified in the PSL Technical Specifications.
8 4   All blanks on the "POST-TRIP REVIEW                 CHECK SHEET"     should be filled in, use N/A where not applicable.
F.Activities under the jurisdiction of the ASME Boiler&Pressure Vessel, the IEEE and associated codes when referenced in items A&E above.G.Calibration of Measuring and Testing Equipment used for activities within the scope of the quality program.H.Contractor activities on items within the scope of the quality program.I.Replacement activities or items within the scope of this docu-ment.J.Fire Protection activities outlined in the PSL Fire Protection Program.K.Security activities outlined in the PSL Security Plan.L.Environmental activities specified in PSL Environmental Permits.M.Plant Start-up activities.
 
N.Certain consumable items for Plant Maintenance that are listed by Quality Control as being included in the program.2.0 The scope of the program delineated in this instruction or associated procedures may be changed by utilizing revision and approval methods included in QI 5-PR/PSL-l.
                                                        ~
1 1   1 I ~
QI
                  "!'.i/A'i' '(   i'8!lCEDiJR ';: 4'i~! i)i'.2,'I'I 3('     i" POST TR IP Ri V IEW POST   TRIP REVIEW CHECK SHEET (Page } of 3)
( 1)   UNIT NO.             REAC1'OR     S/D NO.                 DATE       /       /           TIME (2)   Reactor   trip   actuated by:           j j MANUAL       j   j AUTO   (RPS)
A. Reason   for   Manual   Trip:
B. RPS   trip unit initiating           Reactor Trip?
: l. If hi pressurizer             pressure     trip,     did   PORV   reclose?
(3)   All TCBs     open?   j   jYES   j   jNO     All CEA     Rod   bottom   lights?     j   jYES   j jNO A. Actuation Time:               Time Last TCB Open (SOE)
Time of Trip Signal (SOE)
Difference (4)     Safety Features Actuation Required                   (Check)
SIAN                       MS IS DIAS                        AE AS CS AS A. If any   syst: em was   required, did         it function       properly?   j   jYES j   jNO (5)   First   out annunciator         RTGB     102/202:
(6)     Plant Electrical Alignment               (Check)
BEFORE TRIP           AFTER TRIP Auxiliary Trans former S tartup Trans former Diesel Generator (7)     Pressurizer pressure and level control normal?                           j   j YES j   jNO
 
                                                ~                   ~
                ~
                          ! ':."'"'.!'ii'.!;DUB!'. i"i< 0!'.l( l! i! ') ' !
T!< I!'       i'.'~',!:W     "'OST POST   TRIP REVIEW CHECK SHEET Page       of (8)   Steam Generator         Feed:       (Check)
BEFORE       T''             AFTER TRIP A               B               A             B   I MAIN FEED
              )
AUXILIARYtern FEED (9) 'id secondary         systems     function properly?
SBCS           YES        NO Feed Reg   S ys               YES        NO Generator Lockout               YES       NO (10)   Plant Conditions immediately prior to                       trip:
(ll) Reason     for Reactor Trip:
(12)   Any unusual     conditions during           Rx   trip     or     trip   recovery:
(13)   Any unusual     or unexplained annunciators during                               trip or   trip recovery:
(14)   NRC notified within         one   (1) hour?       i    lYES      i   iNO
 
              <>P!.RAT LYLY:::!:(l<'.EDi>RE ViJ.! BE!',:>O 3O: i 9.
R'.;'OST TRIP REVIEW POST   TRlF REVIEW     CHECK SHEET Page   3 of   3 (15) Emergency Plan implemented?                     j YES j   jNO (if YES,   give classification       and   explain)
( 16) Will maintenance be required prior to returning to                       power? j j YES ) j NO (If YES, explain)
(17) Attach DDPS, SOE printouts, and any other printout or chart used to determine cause of reactor trip or to show any abnormal condition during trip.
(18)   Addi tional Remarks:
(if NO was answered   in   Step 2(b), 3, 4(A),         7 6   9, explain)
(19)   The cause   of reactor   trip   has been   identified,     no abnormal         conditions exist. The   plant can safely     be   returned to power.
Nuclear Plant Supervisor                                             S.T.A
 
APPENDIX A TO   I 2-PR/PSL-1 1.0 The descriptions listed below provide a scope of those activities which have been determined as requiring one or more aspects of the PSL Quality Program.
A. Those items described   in the FSAR as being safety related, or seismically or post loca qualified. This includes clarifying documents such as Instrument Lists, Piping & Valve Line Lists, P&ID's, Drawings and original equipment specifi-cations.
B. PC/M items identified as being   safety related, seismically or post loca qualified.
C. 10CFR-71, Radwaste   Shipping.
D. 10CFR-20, Radiation   Protection.
E. Activities specified in the PSL Technical Specifications.
F. Activities under the jurisdiction of the ASME Boiler &
Pressure Vessel, the IEEE and associated       codes when referenced in items A & E above.
G. Calibration of Measuring and Testing Equipment used for activities within the scope of the quality program.
H. Contractor activities   on   items within the scope of the quality program.
I. Replacement activities or     items within the scope of this docu-ment.
J. Fire Protection activities outlined in the       PSL Fire Protection Program.
K. Security activities outlined in the     PSL Security Plan.
L. Environmental activities specified in       PSL Environmental Permits.
M. Plant Start-up activities.
N. Certain consumable items for Plant Maintenance that are listed by Quality Control as being included in the program.
2.0 The scope of the program delineated in this instruction or associated procedures may be changed by utilizing revision and approval methods included in QI 5-PR/PSL-l.
3.0 The approval authority for revising specific technical, FSAR and PC/M items impacting the quality program is vested with Power Plant Engineering (EPP).}}
3.0 The approval authority for revising specific technical, FSAR and PC/M items impacting the quality program is vested with Power Plant Engineering (EPP).}}

Latest revision as of 10:20, 29 October 2019

Rev 0 to Operating Procedure 0030119, Post-Trip Review.
ML17301A052
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/11/1983
From: Storke B
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17214A376 List:
References
0030119, 30119, NUDOCS 8308160263
Download: ML17301A052 (15)


Text

FLORIDA POWER & LIGHT COMPANY ST. LUCIE PLANT OPERATING PROOEDORE NIPIEER 0030119 REVIS ION 0 1 TITLE: POST TRIP REVIEW 2~ PREPARED BY: Bob Storke 3~ SUBCtMMITTEE REVIEW BY: Dan West for FPL NED 4~ REVIEWED BY FACILITY REVIEW GROUP 5~ APPROVED BY ~ 0+~>'MPLANT MANAGER 6~ REVIEWED BY F R G 7~ APPROVED BY PLANT MANAGER 83081602h3 830811 PDR ADOCK 05000389 P PDR I

l

'1

) ( jf

Page 1 of 5 FLORIDA POWER 6 LIGHT COMPANY ST. LUCIE PLANT OPERATING PROCEDURE AMBER 0030119 REVISION 0

1.0 Title

Post Trip Review 2.0 Review and A royal:

Reviewed by Facility Review Group 1983 Approved by ~lant Manager dZ~r'9 fZ Revision Reviewed by F R G 19 Approved by Plant Manager 19 3.0 ~Pet ose:

This procedure will identify any abnormal circumstances associated with a plant trip by'evaluating plant conditions immediately prior to and immediately after the trip.

4.0 . Limits and Precautions:

4~1 If the cause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be returned to power until the events associated with the trip are evaluated by the Facility Review Group e 5~0 Related S stem Status:

N/A 6 0

References:

N/A A signed copy of this procedure with the applicable strip charts and printouts attached shall be retained in the plant files.

Page 2 of 5 ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW

8.0 Instructions

F 1 This procedure will be performed following any unplanned reactor trip after plant conditions have been stabilized. The procedure need not be performed following a planned shutdown.

8 ' Input from all plant personnel is vital to the correct identification of the cause of the plant trip and of any related malfunctions.

8.3 . All data pertinent to the- plant trip should be collected and kept with this procedure. If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned- to its recorder..

8~4 All blanks on, the "POST-TRIP REVIEW CHECK SHEET" should be filled in, use N/A where not applicable.

'Page 3 of 5 sb 3m ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET (Page 1 of 3)

(I) UNIT NO, REACTOR S/D NO. DATE / /

(2) Reactor trip actuated by: ) j MANUAL ( (

AUTO (RPS)

A. Reason for Manual Trip:

B. RPS trip unit initiating Reactor Tripf

l. If hi pressurizer pressure trip, did PORV reclose?

(3) All TCEs opee2 [ [YES +[NO All CEA Rod bottom lights2 [ [YES [ [NO A. Actuation Time: Time Last TCB Open (SOE)

Time of Trip Signal (SOE)

Difference (4) Safety Features Actuation Required (Check)

SIAN MS IS DIAS APAS CSAS A. If any system was required, did it function properly'l ) (YES ( )NO (5) First out annunciator RTGB 102/202:

(6) Plant Electrical Alignment (Check)

BEFORE TRIP AFTER TRIP Auxiliary Transformer Startup Transformer Diesel Generator (7) Pressurizer pressure and level. control normal? ( (YES ( (NO

Page 4 of 5 ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET Page of (8) Steam Generator Feed: (Check)

BEFORE TRIP AFTER TRIP A B A B MAIN FEED AUXILIARYFEED (9) Did secondary systems function properly'BCS YES NO Feed Reg System YES NO Generator Lockout YES ~ NO (10) Plant Conditions immediately prior to trip:

(11) Reason for Reactor Trip:

(12) Any unusual conditions during Rx trip or trip. recovery:

(13) Any unusual or unexplained annunciators during trip or trip recovery:

(14) NRC notified within one (1) hourV ( (YES ( )NO

Page 5 of 5 ST ~ LUCIE PLANT OPERATING PROCEDURE NUMBER 0030119, REVISION 0 POST TRIP REVIEW POST TRIP REVIEW CHECK SHEET Page 3 of 3 (15) Emergency Plan implemented? (YES f /NO (if YES, give classification and explain)

( 16) Will maintenance be required prior to returning to power? ( (YES ( /NO (If YES,. explain)

(17) Attach DDPS, SOE printouts, and any other printout or chart used to determine cause of reactor trip or to show any abnormal condition during trip. I (18) Additional Remarks:

(if NO was answered in Step 2(b), 3, 4(A), 7 6 9, explain)

(19) The cause of reactor trip has been identified, no abnormal conditions exist. The plant can safely be returned to power.

Nuclear Plant Supervisor S,T,Ai

~,C II 1

FLORIDA POWER 6 LIGHT C(MPANY ST. LUCIE PLANT OPERATING PROCEDURE NN BER-00301 19 REViSION 0 s

1.0 Title

Post Trip Review 2.0 Review and An royal:

Reviewed by Approved by Revision

'dt Facility Review Group Reviewed by F M<

R G

~~ ~ant Manager P 2S 198'~~~

19J' 19 Approved by Plant Manager 19 3.0 ~Por ose:

This procedure will identify any abnormal circumstances associa'ted with a plant trip by evaluating plant conditions immediately prior to and immediately after the trip.

4.0 Limits and Precautions:

4.1 If the cause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be returned to power until the events associated with the trip are evaluated by the Facility Review Groups 5.0 Related S stem Status:

N/A 6.0

References:

N/A 7.0 Records Re uired:

A signed copy of this procedure with the applicable strip charts and printouts attached shall be retained in the plant files.

~,/

l~

1 1

e, i'ROC ED UR F.

!. li (: 'i 8 "!. A i~

POST TR?P

'!'V U.! 8 E R ') 0 3 i) ! l REVIEW n,

8.0 Ins tructions:

8.1 This procedure will be performed following any unplanned reactor trip after plant conditions have been stabilized. The procedure need not be performed following a planned shutdown.

8.2 Input t. ~m all plant personnel is vital to the correct identification of the cause of the plant trip and of any related malfunctions.

8.3 All data pertinent to the plant trip should be collected and kept with this procedure. If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned to its recorder.

8 4 All blanks on the "POST-TRIP REVIEW CHECK SHEET" should be filled in, use N/A where not applicable.

~

1 1 1 I ~

QI

"!'.i/A'i' '( i'8!lCEDiJR ';: 4'i~! i)i'.2,'I'I 3(' i" POST TR IP Ri V IEW POST TRIP REVIEW CHECK SHEET (Page } of 3)

( 1) UNIT NO. REAC1'OR S/D NO. DATE / / TIME (2) Reactor trip actuated by: j j MANUAL j j AUTO (RPS)

A. Reason for Manual Trip:

B. RPS trip unit initiating Reactor Trip?

l. If hi pressurizer pressure trip, did PORV reclose?

(3) All TCBs open? j jYES j jNO All CEA Rod bottom lights? j jYES j jNO A. Actuation Time: Time Last TCB Open (SOE)

Time of Trip Signal (SOE)

Difference (4) Safety Features Actuation Required (Check)

SIAN MS IS DIAS AE AS CS AS A. If any syst: em was required, did it function properly? j jYES j jNO (5) First out annunciator RTGB 102/202:

(6) Plant Electrical Alignment (Check)

BEFORE TRIP AFTER TRIP Auxiliary Trans former S tartup Trans former Diesel Generator (7) Pressurizer pressure and level control normal? j j YES j jNO

~ ~

~

! ':."'"'.!'ii'.!;DUB!'. i"i< 0!'.l( l! i! ') '  !

T!< I!' i'.'~',!:W "'OST POST TRIP REVIEW CHECK SHEET Page of (8) Steam Generator Feed: (Check)

BEFORE T AFTER TRIP A B A B I MAIN FEED

)

AUXILIARYtern FEED (9) 'id secondary systems function properly?

SBCS YES NO Feed Reg S ys YES NO Generator Lockout YES NO (10) Plant Conditions immediately prior to trip:

(ll) Reason for Reactor Trip:

(12) Any unusual conditions during Rx trip or trip recovery:

(13) Any unusual or unexplained annunciators during trip or trip recovery:

(14) NRC notified within one (1) hour? i lYES i iNO

<>P!.RAT LYLY:::!:(l<'.EDi>RE ViJ.! BE!',:>O 3O: i 9.

R'.;'OST TRIP REVIEW POST TRlF REVIEW CHECK SHEET Page 3 of 3 (15) Emergency Plan implemented? j YES j jNO (if YES, give classification and explain)

( 16) Will maintenance be required prior to returning to power? j j YES ) j NO (If YES, explain)

(17) Attach DDPS, SOE printouts, and any other printout or chart used to determine cause of reactor trip or to show any abnormal condition during trip.

(18) Addi tional Remarks:

(if NO was answered in Step 2(b), 3, 4(A), 7 6 9, explain)

(19) The cause of reactor trip has been identified, no abnormal conditions exist. The plant can safely be returned to power.

Nuclear Plant Supervisor S.T.A

APPENDIX A TO I 2-PR/PSL-1 1.0 The descriptions listed below provide a scope of those activities which have been determined as requiring one or more aspects of the PSL Quality Program.

A. Those items described in the FSAR as being safety related, or seismically or post loca qualified. This includes clarifying documents such as Instrument Lists, Piping & Valve Line Lists, P&ID's, Drawings and original equipment specifi-cations.

B. PC/M items identified as being safety related, seismically or post loca qualified.

C. 10CFR-71, Radwaste Shipping.

D. 10CFR-20, Radiation Protection.

E. Activities specified in the PSL Technical Specifications.

F. Activities under the jurisdiction of the ASME Boiler &

Pressure Vessel, the IEEE and associated codes when referenced in items A & E above.

G. Calibration of Measuring and Testing Equipment used for activities within the scope of the quality program.

H. Contractor activities on items within the scope of the quality program.

I. Replacement activities or items within the scope of this docu-ment.

J. Fire Protection activities outlined in the PSL Fire Protection Program.

K. Security activities outlined in the PSL Security Plan.

L. Environmental activities specified in PSL Environmental Permits.

M. Plant Start-up activities.

N. Certain consumable items for Plant Maintenance that are listed by Quality Control as being included in the program.

2.0 The scope of the program delineated in this instruction or associated procedures may be changed by utilizing revision and approval methods included in QI 5-PR/PSL-l.

3.0 The approval authority for revising specific technical, FSAR and PC/M items impacting the quality program is vested with Power Plant Engineering (EPP).