| {{#Wiki_filter:/RA Serita Sanders for | | {{#Wiki_filter:June 15, 2018 Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 |
|
| |
|
| for}} | | ==SUBJECT:== |
| | FINAL SAFETY EVALUATION FOR WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-18124-NP, REVISION 0, FLUENCE DETERMINATION WITH RAPTOR-M3G AND FERRET (CAC NO. MF9141) |
| | |
| | ==Dear Mr. Gresham:== |
| | |
| | By letter dated January 25, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17030A377), Westinghouse Electric Company (Westinghouse) submitted for the U. S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) |
| | WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET." By letter dated November 21, 2017 (ADAMS Accession No. ML17290A147), NRC issued requests for additional information for the review of TR WCAP-18124-NP, Revision 0. |
| | The enclosed final SE addresses the applicability of the WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," TR. |
| | The NRC staff has found that WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," is acceptable for referencing in licensing applications provided that the limitations and conditions stipulated in the Section 4.0 and applicability defined in the enclosed NRC final SE are met along with the proper documentation. |
| | Our acceptance applies only to material provided in the subject TRs. In accordance with the guidance provided on the NRC website, we request that Westinghouse publish accepted proprietary and non-proprietary versions of these TRs within three months of receipt of this letter. |
| | The accepted versions shall incorporate this letter and the enclosed final SE after the title page. |
| | Also, they must contain historical review information, including NRC requests for additional Information (RAIs) and your responses. The accepted versions shall include an "-A"(designating accepted) following the TRs identification symbol. |
| | |
| | J. Gresham As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TRs were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs: |
| | : 1. The RAIs and RAI responses can be included as an Appendix to the accepted version. |
| | : 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TRs. |
| | The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TRs. |
| | If future changes to the NRCs regulatory requirements affect the acceptability of this TR, Westinghouse will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR. |
| | Sincerely, |
| | /RA Serita Sanders for Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation |
| | |
| | ==Enclosure:== |
| | |
| | As stated |
| | |
| | ML18155A186 Package; ML18156A018 Letter; ML18156A066 Safety Evaluation; ML18155A215 Attachment |
| | *concurrence via email NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DSS/SNPB* NRR/DLP/PLPB NAME ELenning DHarrison SKrepel DMorey SSanders for DATE 6/5/2018 6/7/2018 6/12/2018 6/15/2018}} |
Latest revision as of 23:53, 20 October 2019
Letter Sequence Approval |
---|
|
|
MONTHYEARML18134A2832018-05-0808 May 2018 Review of Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret (CAC No. MF9141) Project stage: Draft Other ML18156A0662018-06-15015 June 2018 Enclosure Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor and Ferret (Non-Proprietary) Project stage: Approval ML18155A1862018-06-15015 June 2018 Cover Letter for the Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret Project stage: Request ML18156A0182018-06-15015 June 2018 Cover Letter for the Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret Project stage: Approval ML18155A2152018-06-15015 June 2018 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18124-NP, Revision 0, Fluence Determination with Raptor M3G and Ferret (Non-Proprietary) Project stage: Approval ML18204A0102018-07-20020 July 2018 WCAP-18124-NP-A, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret, July 2018 Project stage: Other ML18204A0092018-07-20020 July 2018 Transmittal of WCAP-18124-NP-A, Revision 0, Fluence Determination with RAPTOR-M3G and Ferret, Dated July 2018 Project stage: Request 2018-06-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan ML22363A0152022-12-29029 December 2022 Westinghouse Electric Co - 60-Day Report Regarding the November 1, 2022, Incident Reported Under 10 CFR 70 Appendix a 24-Hr Report, Columbia Fuel Fabrication Facility (License No. SNM-1107, Docket No. 70-1151) ML22354A2912022-12-20020 December 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML22347A1162022-12-13013 December 2022 Westinghouse 2021-2022 Annual Groundwater Monitoring Report ML22336A1742022-12-0202 December 2022 Westinghouse Request for Temporary License Amendment for Storage of Hematite Ash ML22316A0052022-11-10010 November 2022 Westinghouse Electric Company LLC, Submittal of Amendment to Trust Agreement for License Number SNM-1107, Surety Bond Rider for SNM-1107, and Certification of Financial Assurance for SNM-1107 (Proprietary/Non-Proprietary) ML22298A0432022-10-28028 October 2022 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2022003 ML22294A1792022-10-21021 October 2022 Westinghouse, Request to Amend License SNM-1107 and Submittal of SNM-1107 License Application Page Changes ML22259A1802022-09-27027 September 2022 Letter -WEC 2022 DFP Approval MD ML22157A3492022-09-12012 September 2022 Westinghouse Electric Company, LLC - Renewal of Materials License SNM-1107 (Enterprise Project Identifier: L-2017-RNW-0016) ML22249A2252022-09-0606 September 2022 EPA Comments_Columbia Fuels Feis 2022 ML22228A1812022-08-16016 August 2022 Westinghouse, NRC Semi-Annual Discharge Report January - June 2022 ML22217A0422022-08-0505 August 2022 Response Ltr. to Mmitchum, Chief, Pine Hill Indian Tribe, the First People of Fort Jackson Re., Correspondence Related to the Proposed License Renewal for the WEC Cfff in Richland, Sc ML22214A1492022-08-0202 August 2022 Letter to Ms. Michelle Mitchum, Pine Hill Indian Tribe; Re. Westinghouse Cfff ML22215A1952022-08-0202 August 2022 Letter to USNRC and Schpo 8-2-22 from Pine Hill Indian Tribe Re Columbia Fuel Fabrication Facility ML22182A4352022-07-29029 July 2022 Letter to Applicant - Notice of Availability of the Final Environmental Impact Statement for Westinghouse Columbia Fuel Fabrication Facility 2024-01-26
[Table view] |
Text
June 15, 2018 Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
SUBJECT:
FINAL SAFETY EVALUATION FOR WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-18124-NP, REVISION 0, FLUENCE DETERMINATION WITH RAPTOR-M3G AND FERRET (CAC NO. MF9141)
Dear Mr. Gresham:
By letter dated January 25, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17030A377), Westinghouse Electric Company (Westinghouse) submitted for the U. S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR)
WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET." By letter dated November 21, 2017 (ADAMS Accession No. ML17290A147), NRC issued requests for additional information for the review of TR WCAP-18124-NP, Revision 0.
The enclosed final SE addresses the applicability of the WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," TR.
The NRC staff has found that WCAP-18124-NP, Revision 0, "Fluence Determination with RAPTOR-M3G and FERRET," is acceptable for referencing in licensing applications provided that the limitations and conditions stipulated in the Section 4.0 and applicability defined in the enclosed NRC final SE are met along with the proper documentation.
Our acceptance applies only to material provided in the subject TRs. In accordance with the guidance provided on the NRC website, we request that Westinghouse publish accepted proprietary and non-proprietary versions of these TRs within three months of receipt of this letter.
The accepted versions shall incorporate this letter and the enclosed final SE after the title page.
Also, they must contain historical review information, including NRC requests for additional Information (RAIs) and your responses. The accepted versions shall include an "-A"(designating accepted) following the TRs identification symbol.
J. Gresham As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TRs were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
- 1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
- 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TRs.
The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TRs.
If future changes to the NRCs regulatory requirements affect the acceptability of this TR, Westinghouse will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR.
Sincerely,
/RA Serita Sanders for Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated
ML18155A186 Package; ML18156A018 Letter; ML18156A066 Safety Evaluation; ML18155A215 Attachment
- concurrence via email NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DSS/SNPB* NRR/DLP/PLPB NAME ELenning DHarrison SKrepel DMorey SSanders for DATE 6/5/2018 6/7/2018 6/12/2018 6/15/2018