|
|
Line 3: |
Line 3: |
| | issue date = 03/06/2015 | | | issue date = 03/06/2015 |
| | title = 2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-4 | | | title = 2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-4 |
| | author name = McNeil D R | | | author name = Mcneil D |
| | author affiliation = NRC/RGN-III/DRS/OLB | | | author affiliation = NRC/RGN-III/DRS/OLB |
| | addressee name = | | | addressee name = |
Revision as of 01:15, 21 June 2019
|
---|
Category:License-Operator
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 2024-07-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 2024-07-11
[Table view] |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 1 / Group 1 APE 022AK1.04 Loss of Reactor Coolant Makeup Reason for changing from manual to automatic control of charging flow valve controller
- PBNP does not have a Charging Flow V alve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 /
Group 1 EPE 038EK1.04 Steam Generator Tube Rupture (SGTR)
- Reflux boiling: Reflux boiling is not used as a mitigation strategy for SGTR at PBNP
- Reselected 038EK1.01 RO Tier 1 /
Group 1 APE 054K2.* Loss of Main Feedwater (MFW)
- No K2.* K/A with an RO Importance Rating : Reselected 054G2.2.36 RO Tier 1 /
Group 1 EPE 055EK2.* Loss of Offsite and Onsite Power (Station Blackout)
- No K2.* K/A with an RO : Reselected 055G2.4.8 RO Tier 1 /
Group 1 W/E04EA2.1 LOCA Outside Containment
- Facility conditions and selection of appropriate procedures during abnormal and emergency operations
- Determined to be an SRO level question due to selection of procedures while within the EOP network: Reselected W/E04EA2.2 RO Tier 1 /
Group 2 APE 059AK1.05 Accidental Liquid Radioactive
-Waste Release
- The calculation of offsite doses due to a release from the power plant
- This is not an RO responsibility/job at PBNP
- Reselected 059AK1.01 RO Tier 1 /
Group 2 W/E13EA2.
1 Steam Generator Overpressure
- Facility conditions and selection of appropriate procedures during abnormal and emergency operations: This is not an RO responsibility at PBNP due to being a "Yellow" Critical Safety Function Path: Reselected W/E13EA2.2 RO Tier 2 /
Group 1 SYS 010A3.01 Pressurizer Pressure Control System (PZR PCS)
- PRT temperature and pressure during PORV testing
- No PORV testing is performed at PBNP which causes a temperature change in the PRT
- Reselected 010A3.02 RO Tier 2 /
Group 1 SYS 078K5.* Instrument Air System (IAS)
- No K5.* K/A 2.5: Reselected 078K1.04, see explanation below (061K1.*)
RO Tier 2 /
Group 1 SYS 061K1.* Auxiliary / Emergency Feedwater (AFW) System
- Was not used due to no he randomly exchanged it with an already selected K/A (i.e., 061K1.*)
- Reselected 061K5.05 RO Tier 2 /
Group 1 SYS103K5.*
Containment System
- No K5.* K/A with an RO Importance Rating
- Reselected 103K3.01, see explanation below (073K3.*)
RO Tier 2 /
Group 1 SYS 073K3.* Process Radiation (PRM) System
- Was not used due to no 103K5.* K/A with 103 (Calready selected K/A (i.e., 073K3.*)
- Reselected 073K5.01 RO Tier 2 /
Group 1 SYS 076K4.01 Service Water System (SWS)
- Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves
- The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure
- Reselected 076K4.06
Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 /
Group 1 SYS 076K4.06 Service Water System (SWS)
- Service water train separation
- Train separation is only achieved by Service Water Pump power supplies at PBNP
- Reselected 076K4.02 RO Tier 2 /
Group 2 SYS 029A4.04 Containment Purge System (CPS)
- Containment evacuation signal
- Unable to construct a question with the required level of difficulty: Reselected 029A4.01 RO Tier 2 /
Group 2 SYS 029A4.01 Containment Purge System (CPS)
- Containment purge flow rate
- Purge flow rate of the Containment Purge System is not monitored
- No further A4.* K/A 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 /
Group 2 SYS 041K1.02 Steam Dump System (SDS) and Turbine Bypass Control
- S/G level: Unable to construct a question with the required level of difficulty
- Reselected 041K1.05 SRO Tier 1 / Group 1 APE 026G2.2.4 Loss of Component Cooling Water (CCW)
- (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility
- No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 026G2.2.38 SRO Tier 1 / Group 1 APE 040AA2.02 Steam Line Rupture
- Conditions requiring a reactor trip
- Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 040AA2.04 SRO Tier 1 / Group 2 APE 036G2.1.25 Fuel Handling Incidents
- Ability to interpret reference materials, such as graphs, curves, tables, etc
- Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 036G2.1.31 SRO Tier 1 / Group 2 APE 036G2.1.31 Fuel Handling Incidents
- Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 036G2.1.23 SRO Tier 2 / Group 1 SY S 007A2.06 Pressurizer Relief Tank/Quench Tank System (PRTS)
- Bubble formation in PZR: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 007A2.07 SRO Tier 2 / Group 1 SYS 007A2.07 Pressurizer Relief Tank/Quench Tank System (PRTS)
- Recirculating quench tank: There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 007A2.01 SRO Tier 2 / Group 2 SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS)
- Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup
- Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
- Reselected 011G2.1.32
Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 /
Group 2 SYS 022G2.2.4 Containment Spray System (CSS)
- (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility
- Unable to write a question to meet this K/A due to no major differences between units for this system
- Reselected 022G2.2.39 RO Tier 2 /
Group 1 SYS 078K1.0 4 Instrument Air System (IAS)
- Cooling water to compressor
- Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature)
- Reselected 078K1.05 RO Tier 1 / Group 2 APE 033AA2.12 Loss of Intermediate Range Nuclear Instrumentation
- Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation: Maximum allowable channel disagreement.
- Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw: Reselected 033AA2.01