{{#Wiki_filter:ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE (---B-70_6_1 o-o=--0=3=-6--;-----;s:;-::7=--:o=-6:--:0:-:3:---
{{#Wiki_filter:ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION UNIT NOS. 1 AND 2
P DR ADOCI.<. 05000280 p PDR \ SURRY POWER STATION UNIT NOS. 1 AND 2 e TS 6.1-12 6. Any other matter involving safe operation of the nuclear power stations which is referred to the Director -Safety Evaluation and Control. 7. Reports and meeting minutes of the Station Nuclear Safety and Operating Committee.
(---B-70_6_1o-o=--0=3=-6--;-----;s:;-::7=--:o=-6:--:0:-:3:--- \
: f. Authority The Supervisor-IOER shall report to and advise the Director -SEC regarding any safety concern discovered during the independent review process the Director -Safety Evaluation and Control shall report to and advise the Manager -Nuclear Programs and Licensing, who shall advise the Vice President  
P DR ADOCI.<. 05000280 p                                   PDR
-Nuclear Operations on those areas of responsibility specified in Section 6.1.C.2.e.
 
: g. Records Records of IOER 6.1.C.2.e shall activities be prepared required by Specification and maintained in the SEC files and a summary shall be disseminated each calendar month as follows: 1. Vice President  
e                                                     TS 6.1-12
-Nuclear Operations
: 6. Any   other   matter   involving   safe   operation of the nuclear power     stations   which   is   referred     to   the Director - Safety Evaluation and Control.
: 2. Nuclear Power Station Managers 3. Manager -Nuclear Operations Support 4. Manager -Nuclear Programs and Licensing
: 7. Reports   and   meeting   minutes of the Station Nuclear Safety and Operating Committee.
: 5. 6. Manager -Corporate Quality Assurance Others that the Director -Safety Evaluation and Control may designate
: f. Authority The   Supervisor-IOER     shall   report   to   and   advise     the Director - SEC regarding       any safety   concern   discovered during   the   independent     review   process   the   Director -
'* e e TS 6.1-14 6. The Station Security Plan and implementing procedures at least once per 12 months. 7. Any other area of facility operation considered appropriate by the Manager -Corporate Quality Assurance or the Senior Vice President  
Safety Evaluation and Control shall report to         and   advise the Manager - Nuclear     Programs   and Licensing, who shall advise the Vice President - Nuclear       Operations     on   those areas of responsibility specified in Section 6.1.C.2.e.
-Power Operations.
: g. Records Records   of   IOER   activities    required    by  Specification 6.1.C.2.e   shall   be   prepared   and   maintained in the SEC files and a summary shall be       disseminated     each   calendar month as follows:
: 8. The Station Fire Protection Program and implementing procedures at least once per 24 months. 9. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm. 10. An inspection and audit of the fire prevention program shall be performed by protection a qualified fire consultant at least once per 36 months. and loss outside 11. The radiological environmental monitoring program at least once per 12 months. 12. The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months. I _I TS 6.l-14a 13. The Process Control Program and implementing procedures for processing and packaging of radioactive waste at lest once per 24 months. b. Authority The Quality Assurance Department shall report to and advise the Manager -Corporate Quality Assurance, who shall advise the Senior Vice President  
: 1. Vice President - Nuclear Operations
-Engineering and Construction on those areas of responsibility specified in Specification 6.1.C.3.a above.
: 2. Nuclear Power Station Managers
.. TS 6.1-15 c. Records Records of the Quality Assurance Department audits shall be prepared and maintained in the department files. Audit reports shall be disseminated as indicated below: 1. Vice President  
: 3. Manager - Nuclear Operations Support
-Nuclear Operations
: 4. Manager - Nuclear Programs and Licensing
: 2. Nuclear Power Station Manager 3. Manager -Nuclear Operations Support 4. Manager -Corporate Quality Assurance
: 5. Manager - Corporate Quality Assurance
: 5. Manager -Nuclear Programs and Licensing
: 6. Others   that   the   Director - Safety     Evaluation     and Control may designate
: 6. Director -Safety Evaluation and Control 7. Supervisor of area audited 8. Nuclear Power Station Manager -Quality Assurance
 
\ Figure 6.1-1 Offsite Organization for Facility Management and Technical Support PRESIDENT POWER COMPANY SENIOR VICE PRESIDENT POWER OPERATIONS SENIOR VICE PRESIDENT ENGINEERING  
e                                 e               TS 6.1-14
& CONSTRUCTION  
'*
...---------------------1
: 6. The Station Security Plan and implementing procedures at       least once per 12 months.
----------------MANAGER MAINTENANCE  
: 7. Any other area of facility operation considered appropriate by the Manager - Corporate Quality Assurance or     the Senior   Vice I President - Power Operations.
& PERFORMANCE SERVICES MANAGER POWER TRAINING SERVICES MANAGER NUCLEAR OPERATIONS SUPPORT VICE PRESIDENT NUCLEAR OPERATIONS*
: 8. The Station Fire Protection Program and implementing procedures at least once per 24 months.
I I 111:1:::11~,-11111 1 11:11 1/l//i//!!fi1~11 11///IIIII :::::::1:M.ANAG.e.R:i:YI:
: 9. An independent fire   protection and   loss   prevention   program inspection   and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
H:iHM*-~&#xa2;.t(iHU Ytl:U$qfflfft1/J:/:J:/  
: 10. An inspection   and audit of the fire     protection  and loss prevention program shall be performed by     a   qualified   outside fire consultant at least once per 36 months.
!U!!~tt~NNff
: 11. The radiological environmental monitoring program at least once per 12 months.
:!!:! I I I I
: 12. The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months.
* I I ,---------------
_I
I LH:c:::::::::::=,=,::::::=::::::::=
 
I !~iii"" 1 I I DIRECTOR HEALTH PHYSICS DIRECTOR OPERATIONS
TS 6.l-14a
& MAINTENANCE SUPPORT DIRECTOR ADMINISTRATIVE . SERVICES
: 13. The Process Control Program and implementing procedures for processing and packaging of radioactive waste at lest once   per 24 months.
* Responsible for Corporate Fire Protection Program MANAGER NUCLEAR PROGRAMS AND LICENSING I SUPERVISOR CORPORATE EMERGENCY PLANNING I MANAGER CORPORATE QUALITY ASSURANCE DIRECTOR SAFETY EVALUATION AND CONTROL ---Communications CJ Onsite e UPERINTENDENT NUCLEAR TRAINING SUPERVISOR PLANNING AND SUPPORT SERVICES UPERINTENDENT OPERATIONS SL SHIFT SUPERVISOR SL ASST. SHIFT SUPERVISOR SL CONTROL ROOM OPERATOR OL CONTROL ROOM OPERATOR/
: b. Authority The Quality Assurance Department shall report to and   advise the Manager - Corporate Quality Assurance, who shall advise the Senior Vice President - Engineering and Construction on those   areas of responsibility specified in Specification 6.1.C.3.a above.
TRAINEE SL -Senior License OL -Operator's License ---Communications CJ Off-site ASSISTANT STATION MANAGER (O&M) UPERINTENDENT MAINTENANCE SUPERVISOR MECHANICAL MAINTENANCE SUPERVISOR ELECTRICAL MAINTENANCE SUPERVISOR MAINTENANCE SERVICES UPERINTENDENT TECHNICAL SERVICES SUPERVISOR CHEMISTRY INSTRUMENT SUPERVISOR SUPERVISOR SURVEILLANCE AND TEST ENGINEERING SUPERVISOR PLANT ENGINEERING STATION MANAGER UPERINTENDENT PROJECTS LICENSING COORDINATOR ASSISTANT STATION MANAGER (NS & L) SUPERVISOR SAFETY ENG. NUCLEAR SHIFT TECHNICAL ADVISORS MANAGER QUALITY ASSURANCE SUPERVISORS QUALITY STATION SECURITY SUPERVISOR
 
--_I UPERINTENDENT HEALTH PHYSICS SUPERVISOR ADM IN ISTRA TIVE SERVICES COORDINATOR SUPERVISOR BUSINESS EMERGENCY RECORDS SYSTEMS PLANNING MANAGEMENT SUPERVISOR STATION SUPERVISOR SAFETY PERSONNEL COORDINATOR SERVICES ST A TION LOSS PREVENTION COORDINATOR Figure 6.1-2 SURRY POWER STATION ORGANIZATION CHART -
TS 6.1-15
e ' , ATTACHMENT 2 SAFETY EVALUATION SURRY POWER STATION UNIT NOS. 1 AND 2 e --,, Description of Change This proposed change will modify Section 6 of the Surry Technical Specifications to reflect a company reorganization in which the Quality Assurance organization will now report to the Senior Vice President Engineering and Construction, rather than the Senior Vice President  
..
-Power Operations.
: c. Records Records of the Quality Assurance   Department audits   shall be prepared and maintained in the department files. Audit reports shall be disseminated as indicated below:
It also changes the titles of several on-site and off-site managers and supervisors, and deletes the Director, Nuclear Training.
: 1. Vice President - Nuclear Operations
As the major emphasis of the Company's nuclear program is on operations rather than construction, it is appropriate that the QA organization report to Engineering and Construction to enhance the independence of the QA organization.
: 2. Nuclear Power Station Manager
Basis for No Significant Hazards Consideration The proposed amendment does not involve a significant hazards consideration because operation of Surry Units 1 and 2 in accordance with the change would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated.
: 3. Manager - Nuclear Operations Support
This change merely revises where the QA organization reports to enhance independence and corrects titles in the on-site and off-site organization charts. Thus, this change does not change plant design or operation and does not increase the probability or consequences of an accident.
: 4. Manager - Corporate Quality Assurance
(2) create the possibility of a new or different kind of accident from any previously analyzed.
: 5. Manager - Nuclear Programs and Licensing
It has been determined that a new or different kind of accident will not be possible due to this change. Realigning the QA organization with Engineering and Construction, revising supervisor or manager titles or deleting the Director, Nuclear Training position do not create the possibility of a new or different kind of accident.
: 6. Director - Safety Evaluation and Control
(3) involve a significant reduction in a margin of safety. This change doesn't involve a change in the basis for any Technical Specification or the Updated Final Safety Analysis Report accident analysis.
: 7. Supervisor of area audited
Therefore, the change doesn't involve a significant reduction in the margin of safety. 50.59 Safety Review The proposed change does not involve a unreviewed safety question because operation of Surry Units 1 and 2 in accordance with this change would not: (1) increase the probability of occurrence or consequences of an accident or malfunction of equipment previously evaluated in the safety analysis report because these organizational changes and titles do not effect plant design or operations; (2) increase the possibility of an accident or malfunction of a different type than previously evaluated in the safety analysis report because the organization change does not effect plant design or operations.
: 8. Nuclear Power Station Manager - Quality Assurance
;, (3) reduce the margin of safety Specification because the Technical Specification or safety analysis.
 
as defined in change does the Updated the not Final e basis for a Technical effect the basis of any Safety Analysis Report Pursuant to 10 CFR 50.59 and 50.92, it has been determined that this change does not involve a unreviewed safety question or a significant safety hazards consideration.}}
Figure 6.1-1 Offsite Organization for Facility Management and Technical Support PRESIDENT POWER COMPANY SENIOR                                                            SENIOR VICE PRESIDENT                                                     VICE PRESIDENT POWER                                                        ENGINEERING &
e OPERATIONS                                                      CONSTRUCTION
                  ...-------------------- - - - - - - - - - - - - - - -
VICE PRESIDENT NUCLEAR MANAGER OPERATIONS*
MAINTENANCE                                                                                                                                       MANAGER
  & PERFORMANCE                                                                                                                                       CORPORATE SERVICES                                                                                                                                       QUALITY I                          I                                          ASSURANCE MANAGER NUCLEAR           111:1:::11~,-11111111:11 1
                                                                                              /l//i//!!fi1~11 11
                                                                                                                ///IIIII     MANAGER NUCLEAR MANAGER OPERATIONS          :::::::1:M.ANAG.e.R:i:YI: H:iHM*-~&#xa2;.t(iHU                 PROGRAMS AND POWER TRAINING SUPPORT          Ytl:U$qfflfft1/J:/:J:/ !U!!~tt~NNff:!!:!                     LICENSING
\      SERVICES                                                              I                           I I                           I
                                      ,---------                           * -
I - - - - -I 1                          I                          I                        I                I DIRECTOR                                                SUPERVISOR        DIRECTOR DIRECTOR DIRECTOR            OPERATIONS &                                              CORPORATE          SAFETY ADMINISTRATIVE I HEALTH PHYSICS        MAINTENANCE
                                                                                            . SERVICES EMERGENCY        EVALUATION SUPPORT                                                PLANNING      AND CONTROL LH:c:::::::::::=,=,::::::=::::::::= I
  !~iii""
* Responsible for Corporate Fire Protection Program                                     -  -  -
CJ Communications Onsite
 
MANAGER
                                                                                                                                                          -
STATION                      QUALITY MANAGER                   ASSURANCE SUPERVISORS                              STATION QUALITY                               SECURITY SUPERVISOR ASSISTANT                                          ASSISTANT STATION MANAGER STATION MANAGER
                                                                                                                                    - - _I (O&M)                                                (NS & L)
UPERINTENDENT        UPERINTENDENT UPERINTENDENT    UPERINTENDENT  UPERINTENDENT                            UPERINTENDENT       SUPERVISOR NUCLEAR               OPERATIONS  MAINTENANCE        TECHNICAL      PROJECTS                                  HEALTH          ADM IN ISTRATIVE TRAINING           SL                                  SERVICES                                                  PHYSICS            SERVICES SUPERVISOR               SHIFT PLANNING AND                         SUPERVISOR        SUPERVISOR             LICENSING  SUPERVISOR COORDINATOR          SUPERVISOR            BUSINESS SUPPORT              SUPERVISOR  MECHANICAL                                          SAFETY ENG. EMERGENCY            RECORDS              SYSTEMS MAINTENANCE        CHEMISTRY            COORDINATOR SERVICES          SL                                                                   NUCLEAR    PLANNING          MANAGEMENT            SUPERVISOR ASST. SHIFT  SUPERVISOR        INSTRUMENT                            SHIFT                          STATION           SUPERVISOR SUPERVISOR   ELECTRICAL         SUPERVISOR                       TECHNICAL                          SAFETY            PERSONNEL MAINTENANCE                                           ADVISORS                      COORDINATOR            SERVICES SL CONTROL ROOM    SUPERVISOR         SUPERVISOR                                                       STATION LOSS OPERATOR  MAINTENANCE      SURVEILLANCE                                                         PREVENTION SERVICES          AND TEST                                                       COORDINATOR OL                                ENGINEERING CONTROL ROOM                      SUPERVISOR OPERATOR/                        PLANT TRAINEE                      ENGINEERING SL - Senior License OL - Operator's License
    - - - Communications Figure 6.1-2   SURRY POWER STATION ORGANIZATION CHART CJ Off-site
 
e
' ,
ATTACHMENT 2 SAFETY EVALUATION SURRY POWER STATION UNIT NOS. 1 AND 2
 
,, Description of Change e                                --
This proposed change will modify Section 6 of         the   Surry   Technical Specifications to reflect a company reorganization in which the Quality Assurance organization will now report to the Senior Vice President Engineering and Construction, rather than the Senior Vice President - Power Operations. It also changes the titles of several on-site and off-site managers and supervisors, and deletes the Director, Nuclear Training. As the major emphasis of the Company's nuclear program is on operations rather than construction, it is appropriate that the QA organization report to Engineering and Construction to enhance the independence of the QA organization.
Basis for No Significant Hazards Consideration The proposed amendment does not involve a significant hazards consideration because operation of Surry Units 1 and 2 in accordance with the change would not:
(1) involve a significant increase in the probability or consequences of an accident previously evaluated. This change merely revises where the QA organization reports to enhance independence and corrects titles in the on-site and off-site organization charts. Thus, this change does not change plant design or operation and does not increase the probability or consequences of an accident.
(2) create the possibility of a new or different kind of accident from any previously analyzed. It has been determined that a new or different kind of accident will not be possible due to this change. Realigning the QA organization with Engineering and Construction, revising supervisor or manager titles or deleting the Director, Nuclear Training position do not create the possibility of a new or different kind of accident.
(3) involve a significant reduction in a margin of safety.       This change doesn't involve a change in the basis for any Technical Specification or the Updated Final Safety Analysis Report accident analysis. Therefore, the change doesn't involve a significant reduction in the margin of safety.
50.59 Safety Review The proposed change does not involve a unreviewed safety question because operation of Surry Units 1 and 2 in accordance with this change would not:
(1) increase the probability of occurrence or consequences of an accident or malfunction of equipment previously evaluated in the safety analysis report because these organizational changes and titles do not effect plant design or operations; (2) increase the possibility of an accident or malfunction of a different type than previously evaluated in the safety analysis report because the organization change does not effect plant design or operations.
 
e
;, (3) reduce the margin of safety as defined in the basis for a Technical Specification because the change does not effect the basis of any Technical Specification or the Updated Final Safety Analysis Report safety analysis.
Pursuant to 10 CFR 50.59 and 50.92, it has been determined that this change does not involve a unreviewed safety question or a significant safety hazards consideration.}}

Revision as of 01:45, 21 October 2019

Proposed Tech Specs Re Reorganization of QA Organization
ML18150A139
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/03/1987
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18150A128 List:
References
NUDOCS 8706100036
Download: ML18150A139 (10)


Text

ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION UNIT NOS. 1 AND 2

(---B-70_6_1o-o=--0=3=-6--;-----;s:;-::7=--:o=-6:--:0:-:3:--- \

P DR ADOCI.<. 05000280 p PDR

e TS 6.1-12

6. Any other matter involving safe operation of the nuclear power stations which is referred to the Director - Safety Evaluation and Control.
7. Reports and meeting minutes of the Station Nuclear Safety and Operating Committee.
f. Authority The Supervisor-IOER shall report to and advise the Director - SEC regarding any safety concern discovered during the independent review process the Director -

Safety Evaluation and Control shall report to and advise the Manager - Nuclear Programs and Licensing, who shall advise the Vice President - Nuclear Operations on those areas of responsibility specified in Section 6.1.C.2.e.

g. Records Records of IOER activities required by Specification 6.1.C.2.e shall be prepared and maintained in the SEC files and a summary shall be disseminated each calendar month as follows:
1. Vice President - Nuclear Operations
2. Nuclear Power Station Managers
3. Manager - Nuclear Operations Support
4. Manager - Nuclear Programs and Licensing
5. Manager - Corporate Quality Assurance
6. Others that the Director - Safety Evaluation and Control may designate

e e TS 6.1-14

'*

6. The Station Security Plan and implementing procedures at least once per 12 months.
7. Any other area of facility operation considered appropriate by the Manager - Corporate Quality Assurance or the Senior Vice I President - Power Operations.
8. The Station Fire Protection Program and implementing procedures at least once per 24 months.
9. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
10. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outside fire consultant at least once per 36 months.
11. The radiological environmental monitoring program at least once per 12 months.
12. The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months.

_I

TS 6.l-14a

13. The Process Control Program and implementing procedures for processing and packaging of radioactive waste at lest once per 24 months.
b. Authority The Quality Assurance Department shall report to and advise the Manager - Corporate Quality Assurance, who shall advise the Senior Vice President - Engineering and Construction on those areas of responsibility specified in Specification 6.1.C.3.a above.

TS 6.1-15

..

c. Records Records of the Quality Assurance Department audits shall be prepared and maintained in the department files. Audit reports shall be disseminated as indicated below:
1. Vice President - Nuclear Operations
2. Nuclear Power Station Manager
3. Manager - Nuclear Operations Support
4. Manager - Corporate Quality Assurance
5. Manager - Nuclear Programs and Licensing
6. Director - Safety Evaluation and Control
7. Supervisor of area audited
8. Nuclear Power Station Manager - Quality Assurance

Figure 6.1-1 Offsite Organization for Facility Management and Technical Support PRESIDENT POWER COMPANY SENIOR SENIOR VICE PRESIDENT VICE PRESIDENT POWER ENGINEERING &

e OPERATIONS CONSTRUCTION

...-------------------- - - - - - - - - - - - - - - -

VICE PRESIDENT NUCLEAR MANAGER OPERATIONS*

MAINTENANCE MANAGER

& PERFORMANCE CORPORATE SERVICES QUALITY I I ASSURANCE MANAGER NUCLEAR 111:1:::11~,-11111111:11 1

/l//i//!!fi1~11 11

///IIIII MANAGER NUCLEAR MANAGER OPERATIONS  :::::::1:M.ANAG.e.R:i:YI: H:iHM*-~¢.t(iHU PROGRAMS AND POWER TRAINING SUPPORT Ytl:U$qfflfft1/J:/:J:/ !U!!~tt~NNff:!!:! LICENSING

\ SERVICES I I I I

,--------- * -

I - - - - -I 1 I I I I DIRECTOR SUPERVISOR DIRECTOR DIRECTOR DIRECTOR OPERATIONS & CORPORATE SAFETY ADMINISTRATIVE I HEALTH PHYSICS MAINTENANCE

. SERVICES EMERGENCY EVALUATION SUPPORT PLANNING AND CONTROL LH:c:::::::::::=,=,::::::=::::::::= I

!~iii""

CJ Communications Onsite

MANAGER

-

STATION QUALITY MANAGER ASSURANCE SUPERVISORS STATION QUALITY SECURITY SUPERVISOR ASSISTANT ASSISTANT STATION MANAGER STATION MANAGER

- - _I (O&M) (NS & L)

UPERINTENDENT UPERINTENDENT UPERINTENDENT UPERINTENDENT UPERINTENDENT UPERINTENDENT SUPERVISOR NUCLEAR OPERATIONS MAINTENANCE TECHNICAL PROJECTS HEALTH ADM IN ISTRATIVE TRAINING SL SERVICES PHYSICS SERVICES SUPERVISOR SHIFT PLANNING AND SUPERVISOR SUPERVISOR LICENSING SUPERVISOR COORDINATOR SUPERVISOR BUSINESS SUPPORT SUPERVISOR MECHANICAL SAFETY ENG. EMERGENCY RECORDS SYSTEMS MAINTENANCE CHEMISTRY COORDINATOR SERVICES SL NUCLEAR PLANNING MANAGEMENT SUPERVISOR ASST. SHIFT SUPERVISOR INSTRUMENT SHIFT STATION SUPERVISOR SUPERVISOR ELECTRICAL SUPERVISOR TECHNICAL SAFETY PERSONNEL MAINTENANCE ADVISORS COORDINATOR SERVICES SL CONTROL ROOM SUPERVISOR SUPERVISOR STATION LOSS OPERATOR MAINTENANCE SURVEILLANCE PREVENTION SERVICES AND TEST COORDINATOR OL ENGINEERING CONTROL ROOM SUPERVISOR OPERATOR/ PLANT TRAINEE ENGINEERING SL - Senior License OL - Operator's License

- - - Communications Figure 6.1-2 SURRY POWER STATION ORGANIZATION CHART CJ Off-site

e

' ,

ATTACHMENT 2 SAFETY EVALUATION SURRY POWER STATION UNIT NOS. 1 AND 2

,, Description of Change e --

This proposed change will modify Section 6 of the Surry Technical Specifications to reflect a company reorganization in which the Quality Assurance organization will now report to the Senior Vice President Engineering and Construction, rather than the Senior Vice President - Power Operations. It also changes the titles of several on-site and off-site managers and supervisors, and deletes the Director, Nuclear Training. As the major emphasis of the Company's nuclear program is on operations rather than construction, it is appropriate that the QA organization report to Engineering and Construction to enhance the independence of the QA organization.

Basis for No Significant Hazards Consideration The proposed amendment does not involve a significant hazards consideration because operation of Surry Units 1 and 2 in accordance with the change would not:

(1) involve a significant increase in the probability or consequences of an accident previously evaluated. This change merely revises where the QA organization reports to enhance independence and corrects titles in the on-site and off-site organization charts. Thus, this change does not change plant design or operation and does not increase the probability or consequences of an accident.

(2) create the possibility of a new or different kind of accident from any previously analyzed. It has been determined that a new or different kind of accident will not be possible due to this change. Realigning the QA organization with Engineering and Construction, revising supervisor or manager titles or deleting the Director, Nuclear Training position do not create the possibility of a new or different kind of accident.

(3) involve a significant reduction in a margin of safety. This change doesn't involve a change in the basis for any Technical Specification or the Updated Final Safety Analysis Report accident analysis. Therefore, the change doesn't involve a significant reduction in the margin of safety.

50.59 Safety Review The proposed change does not involve a unreviewed safety question because operation of Surry Units 1 and 2 in accordance with this change would not:

(1) increase the probability of occurrence or consequences of an accident or malfunction of equipment previously evaluated in the safety analysis report because these organizational changes and titles do not effect plant design or operations; (2) increase the possibility of an accident or malfunction of a different type than previously evaluated in the safety analysis report because the organization change does not effect plant design or operations.

e

, (3) reduce the margin of safety as defined in the basis for a Technical Specification because the change does not effect the basis of any Technical Specification or the Updated Final Safety Analysis Report safety analysis.

Pursuant to 10 CFR 50.59 and 50.92, it has been determined that this change does not involve a unreviewed safety question or a significant safety hazards consideration.