Application for Amend to Licenses DPR-32 & DPR-37,revising Tech Specs to Reflect Addl Reorganization of QA Organization
ML18150A127
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/03/1987
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18150A128 List:
References
87-279, NUDOCS 8706100030
Download: ML18150A127 (3)


Text

e e 10 CFR 50.90 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWABT VICE PRESIDENT NUCLEAR OPERATIONS June 3, 1987 U. S. Nuclear Regulatory Commission Serial No.87-279 Attn: Document Control Desk NO/ETS:vlh Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE REORGANIZATION OF THE QUALITY ASSURANCE ORGANIZATION Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Unit Nos. 1 and 2.

This Technical Specification change request supersedes our previous submittal dated July 14, 1986, Serial No.86-366. This change includes additional organization changes since the previous submittal.

The proposed change will modify Section 6 of the Surry Technical Specifications to reflect a company reorganization in which the Quality Assurance organization reports to the Senior Vice President - Engineering and Construction, rather than the Senior Vice President - Power Operations. As the major emphasis of the Company's nuclear program is presently on operations rather than construction, it is no longer appropriate that the Quality Assurance organization report to Power Operations. This change is intended to enhance the independence of the Quality Assurance Organization. In addition, the proposed change corrects the titles of several on-site and off-site managers and supervisors. The Director-Nuclear Training position has been deleted.

r~-a;;;*ru~~~~~~----

1 706100030 870603 '

PDR ADOCK 05000280 p PDR

e

,. The proposed changes to the Technical Specifications are provided in Attachment 1. A discussion of the proposed changes to the Technical Specifications is provided in Attachment 2. The proposed changes and the safety evaluation have been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control staff.

It has been determined that this request does not pose a significant hazards consideration as defined in 10 CFR 50.92 or an unreviewed safety question as defined in 10 CFR 50.59. The application fee was submitted with our July 14, 1986 Technical Specification change request.

Very truly yours, W. L.

Attachments

1. Proposed Technical Specification Change
2. Safety Evaluation cc: U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRG Senior Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219 Mr. Chandu P. Patel NRG Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A

e e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND )

  • The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W. L. Stewart who is Vice President -

Nuclear Operations, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 3 day of _a..,,...IUU.;-

____ , 19 -=/. . 7 My Commission expires: J,1&a,,,.!J .;?5" , g :z'.0 ~,

(SEAL)

S/001