{{#Wiki_filter:Inspection / Activity PlanPage 1 of 209/01/200907:52:15Report 2209/01/2009
{{#Wiki_filter:Page 1 of 2                                                                                North Anna 09/01/2009    07:52:15                                                          Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit        Planned Dates                                                                                                                  No. of Staff Number        Start      End    Inspection Activity                                                                Title                        on Site ISFSI          - ISFSI OPERATIONAL INSPECTION                                                                         2 1, 2       07/01/2009  10/15/2009  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants TFPI          - TRIENNIEL FIRE PROTECTION INSPECTION                                                                 7 1, 2       09/14/2009  09/18/2009  IP 7111105T              Fire Protection [Triennial]
-12/31/2010UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteNorth AnnaISFSI-ISFSI OPERATIONAL INSPECTION 21, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/200910/15/2009TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 71, 2 IPFire Protection [Triennial]7111105T09/14/200909/18/20091, 2 IPFire Protection [Triennial]7111105T09/28/200910/02/2009EB1-CDBI-COMPONENT DESIGN BASIS INSPECTION 61, 2 IPComponent Design Bases Inspection711112110/19/200910/23/20091, 2 IPComponent Design Bases Inspection711112111/02/200911/06/20091, 2 IPComponent Design Bases Inspection711112111/16/200911/20/20091, 2 IPComponent Design Bases Inspection711112112/07/200912/11/2009OL RQ-REQUAL INSPECTION 31, 2 IPLicensed Operator Requalification Program7111111B01/11/201001/15/2010EB3ISI-UNIT 1 ISI 11 IPInservice Inspection Activities - PWR7111108P03/22/201003/26/2010EB3TI172-EB3 RCS DM BUTT WELDS 11, 2 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17203/22/201003/26/2010OL EXAM-INITIAL EXAM PREP 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333305/17/201005/21/2010OL EXAM-INITIAL EXAM - WEEK 1 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333306/07/201006/11/2010OL EXAM-INITIAL EXAM - WEEK 2 41 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIESV2333306/21/201006/25/2010PSB1EP-EMERGENCY PREPARENESS EXERCISE 31, 2 IPExercise Evaluation711140107/19/201007/23/20101, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140507/19/201007/23/20101, 2 IPPerformance Indicator Verification7115107/19/201007/23/2010PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 21, 2 IPAccess Control to Radiologically Significant Areas711210109/13/201009/17/20101, 2 IPALARA - Required7112102-7112102R09/13/201009/17/20101, 2 IPRadioactive Material Processing and Transportation711220209/13/201009/17/20101, 2 IPPerformance Indicator Verification7115109/13/201009/17/2010EB3ISI-UNIT 2 INSERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P09/20/201009/24/2010EB3TI172-EB3 RX COOLANT SYS DM BUTT WELDS 12 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17209/20/201009/24/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
1, 2      09/28/2009  10/02/2009  IP 7111105T              Fire Protection [Triennial]
Inspection / Activity PlanPage 2 of 209/01/200907:52:15Report 2209/01/2009
EB1-CDBI       - COMPONENT DESIGN BASIS INSPECTION                                                                   6 1, 2       10/19/2009  10/23/2009  IP 7111121              Component Design Bases Inspection 1, 2       11/02/2009  11/06/2009  IP 7111121              Component Design Bases Inspection 1, 2       11/16/2009  11/20/2009  IP 7111121              Component Design Bases Inspection 1, 2       12/07/2009  12/11/2009  IP 7111121              Component Design Bases Inspection OL RQ         - REQUAL INSPECTION                                                                                   3 1, 2       01/11/2010  01/15/2010  IP 7111111B              Licensed Operator Requalification Program EB3ISI        - UNIT 1 ISI                                                                                           1 1          03/22/2010  03/26/2010  IP 7111108P              Inservice Inspection Activities - PWR EB3TI172      - EB3 RCS DM BUTT WELDS                                                                               1 1, 2       03/22/2010  03/26/2010  IP 2515/172              Reactor Coolant System Dissimiliar Metal Butt Welds OL EXAM       - INITIAL EXAM PREP                                                                                   4 1          05/17/2010  05/21/2010      V23333                NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                               4 1          06/07/2010  06/11/2010      V23333                NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                                               4 1          06/21/2010  06/25/2010      V23333                NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES PSB1EP        - EMERGENCY PREPARENESS EXERCISE                                                                       3 1, 2       07/19/2010  07/23/2010  IP 7111401              Exercise Evaluation 1, 2       07/19/2010  07/23/2010  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2       07/19/2010  07/23/2010  IP 71151                Performance Indicator Verification PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                                                       2 1, 2       09/13/2010  09/17/2010  IP 7112101              Access Control to Radiologically Significant Areas 1, 2       09/13/2010  09/17/2010  IP 7112102-7112102R ALARA - Required 1, 2       09/13/2010  09/17/2010  IP 7112202              Radioactive Material Processing and Transportation 1, 2       09/13/2010  09/17/2010  IP 71151                Performance Indicator Verification EB3ISI        - UNIT 2 INSERVICE INSPECTION                                                                         1 2      09/20/2010  09/24/2010  IP 7111108P              Inservice Inspection Activities - PWR EB3TI172      - EB3 RX COOLANT SYS DM BUTT WELDS                                                                     1 2      09/20/2010  09/24/2010  IP 2515/172              Reactor Coolant System Dissimiliar Metal Butt Welds This report does not include INPO and OUTAGE activities.
-12/31/2010UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteNorth AnnaPSB1-RP-RP OCCUPATIONAL BASELINE WEEK2 21, 2 IPAccess Control to Radiologically Significant Areas711210109/27/201010/01/20101, 2 IPALARA - Required7112102-7112102R09/27/201010/01/20101 IPRadioactive Material Processing and Transportation711220209/27/201010/01/20101, 2 IPOccupational Exposure Control Effectiveness71151-OR0109/27/201010/01/20101, 2 IPRETS/ODCM Radiological Effluent71151-PR0109/27/201010/01/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.                           Enclosure
 
Page 2 of 2                                                                            North Anna 09/01/2009    07:52:15                                                        Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit        Planned Dates                                                                                              No. of Staff Number        Start      End    Inspection Activity                                                            Title      on Site PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK2                                                   2 1, 2       09/27/2010  10/01/2010  IP 7112101              Access Control to Radiologically Significant Areas 1, 2      09/27/2010  10/01/2010  IP 7112102-7112102R ALARA - Required 1          09/27/2010  10/01/2010  IP 7112202              Radioactive Material Processing and Transportation 1, 2      09/27/2010  10/01/2010  IP 71151-OR01          Occupational Exposure Control Effectiveness 1, 2       09/27/2010  10/01/2010  IP 71151-PR01          RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.       Enclosure}}

Latest revision as of 03:38, 14 November 2019

Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440533
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
Download: ML092440533 (2)


Text

Page 1 of 2 North Anna 09/01/2009 07:52:15 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI OPERATIONAL INSPECTION 2 1, 2 07/01/2009 10/15/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 7 1, 2 09/14/2009 09/18/2009 IP 7111105T Fire Protection [Triennial]

1, 2 09/28/2009 10/02/2009 IP 7111105T Fire Protection [Triennial]

EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 10/19/2009 10/23/2009 IP 7111121 Component Design Bases Inspection 1, 2 11/02/2009 11/06/2009 IP 7111121 Component Design Bases Inspection 1, 2 11/16/2009 11/20/2009 IP 7111121 Component Design Bases Inspection 1, 2 12/07/2009 12/11/2009 IP 7111121 Component Design Bases Inspection OL RQ - REQUAL INSPECTION 3 1, 2 01/11/2010 01/15/2010 IP 7111111B Licensed Operator Requalification Program EB3ISI - UNIT 1 ISI 1 1 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 03/22/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds OL EXAM - INITIAL EXAM PREP 4 1 05/17/2010 05/21/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 1 06/07/2010 06/11/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 1 06/21/2010 06/25/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPARENESS EXERCISE 3 1, 2 07/19/2010 07/23/2010 IP 7111401 Exercise Evaluation 1, 2 07/19/2010 07/23/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/19/2010 07/23/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/13/2010 09/17/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/13/2010 09/17/2010 IP 7112102-7112102R ALARA - Required 1, 2 09/13/2010 09/17/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 09/13/2010 09/17/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/20/2010 09/24/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYS DM BUTT WELDS 1 2 09/20/2010 09/24/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 North Anna 09/01/2009 07:52:15 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK2 2 1, 2 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/27/2010 10/01/2010 IP 7112102-7112102R ALARA - Required 1 09/27/2010 10/01/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 09/27/2010 10/01/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 09/27/2010 10/01/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure