ML18114A829: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/24/2018
| issue date = 04/24/2018
| title = Acceptance Review of LAR Associated with Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals to Measure Reactor Power
| title = Acceptance Review of LAR Associated with Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals to Measure Reactor Power
| author name = Lingam S P
| author name = Lingam S
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Neve D A
| addressee name = Neve D
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000416
| docket = 05000416

Revision as of 10:20, 17 June 2019

Acceptance Review of LAR Associated with Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals to Measure Reactor Power
ML18114A829
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/24/2018
From: Siva Lingam
Plant Licensing Branch IV
To: Neve D
Entergy Nuclear Operations
References
L-2018-LLA-0072
Download: ML18114A829 (3)


Text