Category:Code Relief or Alternative
MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)2021-01-25025 January 2021 Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19136A3862019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19141A0202019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19155A0602019-06-0505 June 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds RS-19-015, Relief Request 14-RS-1 to Implement Code Case OMN-132019-01-31031 January 2019 Relief Request 14-RS-1 to Implement Code Case OMN-13 ML18347B4192019-01-17017 January 2019 Relief Request I4R-03, Relief from ASME Requirements for the Fourth 10-Year Inservice Inspection Interval Related to Degraded Canopy Seal Welds Associated with Control Rod Drive Mechanism ML18318A3342019-01-17017 January 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML18331A0372019-01-17017 January 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML18305A3602018-12-0606 December 2018 Relief from the Requirements of the American Society of Mechanical Engineers Code RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1)2018-10-11011 October 2018 Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)2018-09-24024 September 2018 Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)2017-12-20020 December 2017 Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)2017-12-20020 December 2017 Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) ML17249A2982017-11-13013 November 2017 Relief from the Requirements of the ASME Code (CAC No. MF9597; EPID L-2017-LLR-0021) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17095A2682017-03-31031 March 2017 Submittal of Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces: Attachment 1, Relief Request ML17054C2552017-03-15015 March 2017 Request for Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16162A2112016-06-29029 June 2016 Request for Use of Alternative ML16109A3372016-04-27027 April 2016 Relief from the Requirements of the ASME Code (CAC Nos. MF6715, MF6716, MF6717, and MF6718) ML14303A5062014-12-10010 December 2014 Relief from the Requirements of the ASME Code to Extend the Reactor Vessel Inservice Inspection Interval ML13016A5152013-01-30030 January 2013 Relief from the Requirements of the ASME Code for the Third 10-Year Interval of Inservice Inspection ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML12108A1232012-04-19019 April 2012 Safety Evaluation in Support of the Third 10-Year Inservice Inspection Interval Request for Relief 13R-08 (Tac Nos. ME6024 and ME6025) ML1113306532011-06-0606 June 2011 Unacceptable with Opportunity to Supplement Alt. to ASME Code Requirements for Repair of Reactor Vessel Head Penetrations (TACs ME6071, ME6072, ME6073, and ME6074) ML1105909212011-03-0303 March 2011 Relief Request from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1011905272010-05-11011 May 2010 Relief Request 13R-06 for Detailed Visual Examination During Appendix J Pnuematic Leakage Testing ML1012301792010-05-10010 May 2010 Relief Request I3R-03 for Examination of Structural Weld Overlays ML1008504952010-03-26026 March 2010 Application Accepted - Braidwood & Byron Relief Request Re. ASME Code Case N-729-1 (TACs ME3510 - ME3513) RS-10-046, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2010-03-12012 March 2010 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1004806992010-03-0808 March 2010 Relief Request 12R-50 for Second 10-Year Inservice Inspection Interval 2024-07-23
[Table view] Category:Letter
MONTHYEARML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) 05000456/LER-2024-001, Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open2024-07-0303 July 2024 Submittal of LER 2024-001-00 for Braidwood Station, Unit 1, Trip on Low Steam Generator Level Due to Failure to Verify Isolation Valves Were Open ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 2024-09-23
[Table view] Category:Safety Evaluation
MONTHYEARML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23241A9092023-09-19019 September 2023 Enclosure 2 - Non-Proprietary - Review of License Renewal Commitment Number 10 Safety Evaluation ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22173A1812022-08-11011 August 2022 Issuance of Amendment No. 229 to Remove License Condition ML22173A2142022-08-10010 August 2022 Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21166A1682021-06-25025 June 2021 ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21063A0162021-03-0808 March 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Alternative to 10 CFR 50.55a(z)(2) ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20245E4192020-09-24024 September 2020 Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20133K0932020-05-14014 May 2020 Relief from the Requirements of the ASME Code ML20111A0002020-05-0101 May 2020 Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19240B1122019-09-0909 September 2019 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code 2024-09-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 January 17, 2019 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 -RELIEF FROM THE REQUIREMENTS OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE (EPID L-2018-LLR-0036)
Dear Mr. Hanson:
By letter dated March 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18078A 185), as supplemented by letter dated July 31, 2018 (ADAMS Accession No. ML 18212A334), Exelon Generation Company, LLC (Exelon, the licensee), submitted relief request (RR) 14R-06 for the fourth 10-year inservice inspection (ISi) interval at Braidwood Station (Braidwood), Units 1 and 2. The licensee requested relief from the requirements of Title 10 of the Code of Federal Regulations ( 1 O CFR) 50.55a(b )(2)(xx)(B) and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code)Section XI, paragraphs IWA-4221 and IWA-4540(a)(2).
The licensee is proposing to use phased array ultrasonic testing as an alternative to the required radiographic testing. Specifically, pursuant to 10 CFR, Section 50.55a(z)( 1 ), the licensee requested to use the proposed alternative on the basis that it provides an acceptable level of quality and safety. The U.S. Nuclear Regulatory Commission (NRC or Commission) staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that Exelon has adequately addressed all of the regulatory requirements in 10 CFR 50.55a(z)( 1 ). Therefore, the NRC staff authorizes the use of RR 14R-01 for the fourth ISi intervals at Braidwood, Units 1 and 2, which started on August 29, 2018, and on November 5, 2018, respectively, or until the NRC approves Code Case N-831, or a later revision, in Regulatory Guide 1.147 or other document during the interval.
By its letter dated March 19, 2018, the licensee indicated that the fourth ISi interval for Unit 2 was scheduled to start on October 17, 2018, but also indicated that the start was subject to the allowable changes for inspection intervals in IWA-2430.
By letter dated October 4, 2018 (ADAMS Accession No. ML 18284A445), the licensee indicated that the fourth inspection interval for Unit 2 was scheduled to start on November 5, 2018. All other requirements of ASME Code,Section XI, for which relief was not specifically requested and authorized by the NRC staff remain applicable, including the third-party review by the Authorized Nuclear lnservice Inspector.
B. Hanson If you have any questions, please contact the Project Manager, Joel Wiebe at 301-415-6606 or via e-mail at Joel.Wiebe@nrc.gov.
Docket Nos. 50-456 and 50-457
Enclosure:
Safety Evaluation cc: Listserv Sincerely, /)' 1*. ) <-)_/-l. (__' l 'i '--*-* David J. Wrona, Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST 14R-06 REGARDING PHASED ARRAY ULTRASONIC TESTING EXELON GENERATION COMPANY. LLC BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. 50-456 AND 50-457
1.0 INTRODUCTION
By letter dated March 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18078A 185), as supplemented by letter dated July 31, 2018 (ADAMS Accession No. ML 18212A334), Exelon Generation Company, LLC (Exelon, the licensee), submitted relief request (RR) 14R-06 for the fourth 10-year inservice inspection (ISi) interval at Braidwood Station (Braidwood), Units 1 and 2. The licensee requested relief from the requirements of Title 10 of the Code of Federal Regulations ( 10 CFR), Section 50.55a(b)(2)(xx)(B), and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, paragraphs IWA-4221 and IWA-4540(a)(2).
The licensee is proposing to use phased array ultrasonic testing (PA-UT) as an alternative to the required radiographic testing {RT}. Specifically, pursuant to 10 CFR, Section 50.55a(z)( 1 ), the licensee requested to use a proposed alternative on the basis that it would provide an acceptable level of quality and safety.
2.0 REGULATORY EVALUATION
Regulation 10 CFR 50.55a(g)(4) states, in part, that in a pressurized-boiling water-cooled nuclear power facility, components that are classified as ASME Code, Class 1, Class 2, and Class 3, must meet the requirements set forth in ASME Code,Section XI. Additionally, 10 CFR Section 50.55a(b)(2)(xx)(B) requires that: "The NDE provision in IWA-4540(a)(2) of the 2002 Addenda of ASME Section XI must be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing on a pressure retaining boundary using the 2003 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1){ii) of this section." Paragraph IWA-4540(a){2) of the 2002 Addenda of ASME Code,Section XI. requires that the nondestructive examination method and acceptance criteria of the 1992 Edition or later of ASME Code, Section Ill, be met prior to return to service in order to perform a system leakage test in lieu of a system hydrostatic test. The licensee has requested relief from the requirements of ASME Code,Section XI, paragraphs IWA-4221 and IWA-4540(a)(2).
Section XI, paragraph IWA-4200, covers repair/replacement activities, and paragraph IWA-4221 requires that when the licensee replaces an existing item, Enclosure the replacement shall meet the requirements of the Construction Code to which the original item was constructed.
Regulation 10 CFR, Section 50.55a(z) states, in part, that alternatives to the requirements of 10 CFR 50.55a(b)-(h) may be used when authorized by the NRC, if: (1) the proposed alternatives would provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to authorize the alternative requested by the licensee.
3.0 TECHNICAL
EVALUATION 3.1 ASME Code Components Proposed alternative RR 14R-06 covers ASME Code,Section XI, ferritic piping butt welds requiring radiography during repair/replacement activities.
3.2 Applicable
ASME Code Requirements Regulation 10 CFR, Section 50.55a(b)(2)(xx)(B) requires that "The NDE provision in IWA-4540(a)(2) of the 2002 Addenda of Section XI must be applied when performing system leakage tests after repair and replacement activities performed by welding or brazing on a pressure retaining boundary using the 2003 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section." The fourth 10-year ISi interval of Braidwood, Units 1 and 2, uses the 2013 Edition ASME Code,Section XI. Paragraph IWA-4540(a)(2) of the 2002 Addenda of Section XI requires that the nondestructive examination method and acceptance criteria of the 1992 Edition or later of Section Ill be met prior to return to service in order to perform a system leakage test in lieu of a system hydrostatic test. Additionally, ASME Code,Section XI, paragraph IWA-4221, requires the owner to use the requirements of the construction code for repair/replacement activities.
The examination requirements for ASME Code, Section Ill, circumferential butt welds are contained in subarticles NB-5200, NC-5200, and ND-5200. The acceptance standards for radiographic examination are specified in subarticles NB-5300, NC-5300, and ND-5300. 3.3 Proposed Alternative and Basis for Use The licensee is proposing the use of encoded PA-UT in lieu of the ASME Code-required RT examinations for ferritic piping repair/replacement welds. The proposed alternative qualification program is based on ASME Code Case N-831 with some small changes in wording for clarification.
ASME Code Case N-831 was approved by the ASME Code Standards Committee on September 27, 2016, but is not NRC approved for general use. The encoded PA-UT procedures, equipment, and personnel will be qualified using performance demonstration testing. The flaw acceptance standards for the PA-UT tests will consider all flaws to be planar and be evaluated against the preservice acceptance standards of ASME Code,Section XI, paragraphs IWB-3400, IWC-3400, or IWD-3400, for ASME Code Class 1, 2, or 3 welds, respectively.
The basis for RR 14R-06 is the encoded PA-UT is equivalent to or superior for detecting and sizing planar flaws as compared to the required radiographic examination.
The examination procedure and personnel performing examinations are qualified via performance demonstration testing using representative piping conditions and flaws that demonstrate the ability to detect and size flaws that are both acceptable and unacceptable to the defined acceptance standards.
The ultrasonic testing (UT) techniques are being used throughout the nuclear industry for examination of dissimilar metal welds and overlaid welds, as well as other applications including ASME Code, 831.1, piping replacements.
3.4 Duration
of Proposed Alternative The licensee is requesting that this proposed alternative be applied for the duration of fourth the 10-year ISi intervals at Braidwood, Units 1 and 2, which started on August 29, 2018, and November 5, 2018, respectively, or until the NRC approves Code Case N-831, or a later revision, in Regulatory Guide 1.147 or other document during the interval.
3.5 NRC Staff Evaluation The licensee is proposing to use encoded PA-UT in lieu of RT in RR 14R-06 for repair and replacement activities for the remainder of their current 10-year ISi intervals at Braidwood, Units 1 and 2. The UT, like RT, is a volumetric inspection technique that is commonly used to inspect welds in nuclear power plants and in other industries.
Ultrasonic examinations are not equivalent to radiographic examinations as they use different physical mechanisms to detect and characterize discontinuities.
These differences in physical mechanisms result in several key differences in sensitivity and discrimination capability.
The NRC staff has been assessing the effectiveness of the use of ultrasound in lieu of radiography since 2009, including literature reviews, detailed evaluations of previous relief requests and proposed alternatives, and confirmatory experimental work to validate the findings.
An assessment of the use of UT in lieu of RT by the NRC is described in the 2015 NUREG/CR-7204, "Applying Ultrasonic Testing In Lieu of Radiography for Volumetric Examination of Carbon Steel Piping" (ADAMS Accession No. ML 15253A674).
This report included evaluation on the use of UT in lieu of RT for welded pipes and plates with thicknesses ranging from 0.844 inches to 2.2 inches thick. One conclusion from NUREG/CR-7204 is: Considering overall detections/non-detections for the piping specimens, as well as the Navy plates, it appears that phased array ultrasonic inspection (PA-UT), based on the techniques applied in this study, provides an equally effective examination for identifying the presence of fabrication flaws in carbon steel welds. The PA-UT parameters applied were shown to be more effective for planar flaws, but slightly less effective for small volumetric flaws, than RT. Based on this research the NRC staff finds that there is a sufficient technical basis for the use of UT in lieu of RT for ferritic steel welds. Given that UT in lieu of RT can be effective, the staff worked to determine if the proposed alternative applies UT in a way that provides reasonable assurance of finding structurally-significant flaws. Important aspects of this proposed alternative include: The examination volume shall include 100% of the weld volume and the weld-to-base-metal interface.
The electronic data files for the PA-UT examinations will be stored as archival-quality records. In addition, hard copy prints of the data will also be included as part of the PA-UT examination records to allow viewing without the use of hardware or software.
Ultrasonic examination procedures shall be qualified by using either a blind or a non-blind performance demonstration using a minimum of 30 flaws covering a range of sizes, positions, orientations, and types of fabrication flaws. The demonstration set shall include specimens to represent the minimum and maximum diameter and thickness covered by the procedure.
The flaw through-wall heights for the performance demonstration testing shall be based on the applicable acceptance standards for volumetric examination in accordance with IWB-3400, IWC-3400, or IWD-3400.
At least 30% of the flaws shall be classified as acceptable planar flaws, with the smallest flaws being at least 50% of the maximum allowable size based on the applicable a/I [height/length]
aspect ratio for the flaw. Ultrasonic examination personnel shall demonstrate their capability to detect and size flaws by performance demonstration using the qualified procedure.
The demonstration specimen set shall contain at least 10 flaws covering a range of sizes, positions, orientations, and types of fabrication flaws. All flaws detected using angle-beam ultrasonic inspections will be treated as planar flaws and will be evaluated against the preservice acceptance standards of ASME Section XI, IWB-3400, IWC-3400, or IWD-3400 for ASME Code Class 1, 2, or 3 welds, respectively.
A significant change from the use of ASME Code, Section Ill, radiography requirements is the use of Section XI flaw acceptance standards as opposed to Section Ill, subarticles NB-5330, NC-5330, and ND-5330, flaw acceptance standards.
Section Ill acceptance standards require the inspector to detect and determine the type of flaw (e.g., porosity, lack of fusion, slag, incomplete penetration).
While radiography is effective at discerning between different flaw types, it is less capable than UT at detecting planar flaws such as cracks and lack-of-fusion defects. While ASME Code,Section XI, paragraphs IWB-3400, IWC-3400, and IWD-3400, allow larger flaws than Section Ill, subarticles NB-5330, NC-5330, and ND-5300, the use of ASME Code,Section XI, acceptance standards has proven effective for piping welds for ISi intervals.
The NRC staff finds that the use of ASME Code,Section XI, acceptance standards is appropriate for the proposed alternative, as the proposed alternative is for repair/replacement activities, not new plant construction, and the favorable industry experience with the ASME Code,Section XI, flaw acceptance standards.
Based on the inspection and qualification requirements described in RR 14R-06 and the results of NUEG/CR-7204, there is reasonable assurance that the encoded PA-UT qualified as proposed by the licensee will provide an adequate level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff concludes that the licensee's proposed alternative to use UT in lieu of RT using encoded PA-UT provides reasonable assurance of structural integrity and leak tightness of Class 1 and 2 ferritic piping welds. Thus, UT using the procedure described in the submittals of the subject welds would provide an adequate level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)( 1 ). Therefore, the NRC staff authorizes RR 14R-06 for the fourth 10-year ISi intervals at Braidwood, Units 1 and 2, or until the NRC approves Code Case N-831, or a later revision, in Regulatory Guide 1.147 or other document during the interval.
All other ASME Code,Section XI, requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor:
S. Cumblidge Date of issuance:
January 17, 2019 B. Hanson
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 -RELIEF FROM THE REQUIREMENTS OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE (EPID L-2018-LLR-0036)
DATED JANUARY 17, 2019 DISTRIBUTION:
PUBLIC RidsACRS MailCTR Resource RidsNrrDmlrMphb Resource RidsNrrDorllpl3 Resource RidsNrrLASRohrer Resource RidsNrrPMBraidwood Resource RidsRgn3MailCenter Resource ADAMS Accession No.: ML 18318A334 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NAME JWiebe SRohrer DATE 12/12/18 11/15/18 OFFICE NRR/DORL/LPL3/BC NAME DWrona DATE 1/17/19 OFFICIAL RECORD COPY *via email NRR/DMLR/MPHB/BC SRuffin* 10/29/18