ML18101A191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/31/1994
| issue date = 05/31/1994
| title = Corrected Monthly Operating Rept for May 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| title = Corrected Monthly Operating Rept for May 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| author name = MORRONI M
| author name = Morroni M
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  

Revision as of 12:35, 17 June 2019

Corrected Monthly Operating Rept for May 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A191
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/31/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260297
Download: ML18101A191 (1)


Text

CORRECTED COPY OPERATING DATA REPORT Docket No: Date: Completed by: Mike Morroni Telephone:

Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period May 1994 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity (Gross MWe)

  • 1149 7. Maximum Dependable Capacity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) Report, Gi:ve Reason NA 9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions., if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator on-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH} -Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate N/A. This Month Year to Date 744 3623 744 3546.0 0 0 744 3462.3 0 0 2335672.8
  • 10070244.8 743330 3254460 711102 3098446 100 95.6 100 95.6 86.4 77.3 85.7 76.7 0 4.4 50-311 06/10/94 339-2122 since Last NIA Cumulative 110736 72825.6 0 70351. 8 0 *172533164.2 73800978 70225723 63.5 63.5 57.3 56.9 21.9 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last
  • 60 days. 25. If shutdown at end of Report Period, Estimated Date of Startup: NA 8-1-7.R2 ,r 9408260297 940818 PDR ADOCK 05000311 R PDR